March 02, 1992 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Centlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - 1991 ANNUAL OPERATING REPORT Enclosed is the 1991 Annual Operating Report for SQN.
It contains a summary of the following items:
facility changes, procedure changes, special tests, occupational exposure data, and iodine isotopic activity.
This report is being submitted to satisfy the requirement, of 10 CFR 50.59 and Technical Specifications 6.9.1.4, 6.9.1.5, and 6.15.1.1.a.
As discussed with NRC staf f during the recent 10CFR50.59 inspection (reference inspection report 327/92-02) all temporary alteration control form information during 1991 has been included in this report.
In addition, efforts are underway to enhance the summary of information provided by this report for the 1992 update.
Please direct questions concerning this issue to J. D. Smith at (615) 843-6672.
Sincerely, 5 /1A,
J L. Wilson Enclosure i
cc: See page 2 9203050311 92030p
//i PDR ADOCK 05000327
/
o, I
It PDR V
a
I U.S. Nuclear Regulatory Commission Page 2 March 02, 1992 cc (Enclosure):
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Mar 3etta Street, NW, Suite 2900 Atlanta, Georgia 30323 I
-