Interim Deficiency Rept DER 83-81 Re Manufacturing Defect in Gulfally Schedule 160 SS Pipe.Initially Reported on 831128. Due to Extensive Investigation & Evaluation Required,Final Rept Will Be Delayed Until 840830
ML20094G024
Person / Time
Site: Palo Verde  
Issue date: 07/27/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30059-TDS, DER-83-81, NUDOCS 8408130172
Download: ML20094G024 (2)


Text

,

S0-52,5.29,SSO RECENED r

NRC Arizona Public Service Company July 27, 1984 ANPP-30059-TDS/TRB U. S' Nuclear Regulatory Commission Region.V -

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA' 94596-5368.

Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-81 A 50.55(e) Potentially Reportable Deficiency Relating To Schedule 160 SS Pipe From Gulfally Contains A Manufacturing Defect.

File: 84-019-026; D.4.33.2 a

Reference:

(A) Telephone conversation between J. Eckhardt and K. Parrish on November 28, 1983 (B) ANPP-28473, dated December 20,1983 (Interim Report)

(C) ANPP-28917, dated February 22, 1984 (Time Extension)-

(D) ANPP-29282, dated April 12, 1984 (Time Extension)

(E) ANPP-29625, dated May 31, 1984 (Time Extension)

Dear Sir:

The.NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D) and (E). At that-time, it was estimated that a Final Report would be available by July 31, 1984.

Due to the extensive investigation and evaluation required,-.it is now E

expected that this information will'be finalized.by August 30, 1984, at which-time a complete report will be submitted.'

~,

-There is no new information or change to the Interim Report at this time.

~

Very truly yours-

-}

ut mn

%[2 E. E. Van Brunt, Jr.

APS Vice President P

0 Nuclear Production S

PDR ANPP Project Director

.EEVB/TRB:db lO cc: See Page Two 9M L

l Mr. T. W. Bishop DER 83-81 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission W'shington, D. C. 20555 a

T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom l

Records Center Institute of Nuclear Power Operacions 1100 circle 75 Parkway, Suite 1500 l

Atlanta, GA 30339 1

i