ML20094F981

From kanterella
Jump to navigation Jump to search
Amend 162 to License DPR-66,revising TS SR 4.7.1.5 by Deleting Requirement for Periodic part-stroke Testing of Each MSIV & by Deleting Reference to Specific Testing Requirements
ML20094F981
Person / Time
Site: Beaver Valley
Issue date: 02/25/1992
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duquesne Light Co, Ohio Edison Co, Pennsylvania Power & Light Co
Shared Package
ML20094F983 List:
References
DPR-66-A-162 NUDOCS 9202280091
Download: ML20094F981 (4)


Text

.

g:.3 tag

[1

{,

NUCLE AR REGULATORY COMMISSION jo, UNITED STATES

+

7,,

WASHINGTON, D C. 20555

'S9...../

DV0VESNE LIGHT COMPANY OHIO EDISON COMPANY HfNNSYLVANI A POWER COMPAfD' DOCKET NO. 50-334 BEAVER VALLEY POER STATION. UNIT NO.1 AMENDMENT TO FAClllTY OH RATING LICENSI Amendment No. 162 License No. DPR-66 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duquesne Light Company, et al. (the licensee) dateo February 28, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and -egulat ons set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9202280091 920225 PDR ADOCK 05000334 P

PDR

_ 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License No. DPR-66 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.162, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Joh F. Stolz, Director' (Division of Reactor Projects - 1/11 Prp ect Directorate l-Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical.

Specifications Date of Issuance:

February 25, 1992

ATTACHMENT TO llCENSE AMENDMENT N0. 162 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-331 Replace the following pages of Appendix A, Technical Specifications, with the enclosed pages as indicated.

The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

Remove Insert 3/4 7-10 3/4 7-10 I

l PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

MODES 1-With. one main steam line isolation valve inoperable but

open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MODES 2-With one main steam line isolation valve inoperable, and 3 subsequent operation in MODES 2 or 3 may proceed after:

a.

The inoperable isolation valve is restored to OPERABLE status, or b.

The isolation valve is maintained closed:

~Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line. solation valve shall be demonstrated OPERABLE by verifying full closure within 5

seconds when tested pursuant to specification 4.0.5.

BEAVER VALLEY - UNIT 1 3/4 7-10 Amendment No. 148, 162

- - _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -