VIRGINIA ELucTHIC AND POWER COMPANY It!CIIMOND,YIRGINIA 20261 November 3,1995 United States Nuclear Regulatory Commission Serial No.95-555 Attention: Document Control Desk NAPS /JHUMAE R4 Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos.
NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND_2 CHANGE IN COMMITMENT FOR ULTRASS:.,
TESTING OF EQUIPMENT AND ESCAPE HATCH SEALS On February 27,1990, in an enforcement conference, Virginia Electric and Power Company presented the circumstances of a containment equipment hatch emergency escape lock door leakage event.
During the conference, the requirements of Technical Specification 3.6.1.1, Containment Integrity, were discussed. The surveillance demonstrating the operability of the equipment and escape hatches once per 31 days by ultrasonically testing the seal, was incorrectly attributed as a Technical Specification requirement. Surveillance Requirement 4.6.1.1 does not specifically require ultrasonic testing. Ultrasonic testing of the seals has continued to be performed in addition to the surveillance requirements.
The Technical Specifications currently require pressure testing of the containment
. equipment hatch and emergency escape lock doors. Pressure testing has been effective in maintaining containment equipment hatch and emergency escape lock door integrity. Ultrasonic testing of the containment equipment hatch and emergency escape lock doors has been performed to confirm the results of pressure testing. It has now been determined that ultrasonic testing is not an effective method for identifying seal leakage.
Furthermore, ultrasonic testing results in additional personnel radiation exposure without commensurate benefit.
Therefore, based on the above discussion, our previous commitment to perform ultrasonic testing of the containment equipment hatch and emergency escape lock doors at least once per 31 days is being discontinued. Containment integrity will be verified in accordance with the Surveillance Requirements of Technical Specification 3.6.1.1 and 3.6.1.3.
If you have any questions, please contact us.
Very truly yours, 7
James P. O'Hanlon Senior Vice President - Nuclear 9o\\
9511090150 951103
]
PDR ADOCK 05000338
\\0 O
PDR l
, U.$. Nuclear Regulatory Commission cc:
Region ll t
101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident Inspector i
North Anna Power Station
.