Text

---

  • M:iling Addr:ss Alabama Power Company 600 North 18th Street Post Of fice Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower August 1, 1984 t* w'r'"e" Docket Nos. 50-348 50-364 1

Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approv_a.1_

Gentlemen:

Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated July 2, 1984.

The format of the attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabama Power Company is ready to discuss a modification of this licensing status which would address all licensing issues.

If you have any questions, please advise.

Yours truly, R. P. Mcdonald RPM /CJS:ddb-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford goal 8408100036 840801 PDR ADOCK 05000348 p

PDR g i L.

ATTACHMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPRO/AL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 1.

Emergency 10-25-82 01-06-84 COMPLETE Preparedness Program Audit Once Per 12 Months, FNP-1 and 2 01-09-84 COMPLETE 2.

Administrative 04-06-83 Change to Footnote to T.S. Table 3.3-3, FNP-1 and 2 01-10-84 COMPLETE 12-10-82 3.

Administrative Change to T.S.

Table 3.7 da, FNP-2 01-27-84 COMPLETE 10-08-82 4.

Change for Turbine Valve Testing, FNP-1 and 2 COMPLETE 02-09-84 08-26-83 5.

Correct Fire Protection Technical Speci fications, FNP-1 and 2 COMPLETE 02-29-84 6.

Administrative 05-27-84 Change to Table 3.7-4a, FNP-1 COMPLETE 02-29-84 7.

Correct snubber 05-27-83 Listing, FNP-1_

(FNP-1)

(FNP-1) and 2 (T.S.

Deleted by 12-08-83 Table 3.7-4)

(FNP-2)

APCo letter dated 07-06-84.

COMPLETE 04-16-84 8.

10CFR50.49 02-22-84 Environmental Qualification Schedule Extension Submittal,

FNP-1 L.

ATTACHMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL NRC NRC NRC APCo APCo SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE f

REMARKS 11-24-84 05-17-84 COMPLETE 9.

License Condi-tion 2.C(17) 06-29-84 Containment 03-23-84 Mini-Parge, FNP-2 (T.S.

3.6.1.7) 10a. Mechanical 11-24-82 05-17-84 COMPLETE Snubber Listing, FNP-2 (T.S. Table 3.7-4B) 05-17-84 COMPLETE 11-24-82 10b. Containment Penetration Overcurrent Protection, FNP-2 (T.S.

Table 3.8-1) 06-06-84 COMPLETE 03-04-83

11. Movable Control Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 12a. River Water 12-30-82 06-0/-84 COMPLETE System 06-20-83 Deletion, FNP-1 03-02-84 and 2 (T.S.

03-27-84 3/4.7.5 and 3/4.7.6)

COMPLETE 12b. Diesel 08-03-82 06-07-84 Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S.

03-02-84 4.8.1.1.2.c.5) 03-27-84 03-04-83 06-22-84 COMPLETE

13. Charcoal Filter Surveillance, 03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)

ATTAC MENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS

14. Reactor Head 12-12-83 07-01-84 54531 Vent and Other 08-30-84 54532 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.

3/4.4.12 and existing T.S.

- Table 3.3-6, 3.3-11 and 3/4.6.4)

15. Meteorological 03-02-84 07-08-84 54450 Tower 08-31-84 54451 Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-9 and 4.3-5) 16a. Change Monthly 03-01-84 09-01-84 54452 Channel 54453 Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1) 16b. Correct 03-01-84 09-01-84 54452 Facility 54453 Organization Chart, FNP-1 and 2 (T.S.

Figure 6.2-2) 16c. Correct Valve 03-01-84 09-01-84 54452 Numbers Listed 54453 in T.S., FNP-1 and 2 (T.S.

Table 3.6-1) i

ATTACHMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL' REQUESTED ACTUAL

APC, APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE f

REMERKS

17. Safety Related 05-03-83 11-03-83 51629 Battery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-29-83 08-15-84

( T. S. 3 /4. 8. 2. 3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 3 /4.8.2.5 )

18. Respirator 01-13-84 02-12-84 53468 Iodine Filter 02-10-84 09-09-84 53469 Exemption 02-13-84 Request, FNP-1 03-05-84 and 2 05-08-84 19.

Increase Fuel 03-30-84 10-01-84 54672 Enrichment 05-29-84 54673 Design Limit for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.

5.3.1 and 5.6.1.2) 04-10-84 10-06-84 48714

20. RCS Pressure Isolation Valve 48715 Surveill ance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)
21. Generic Letter 09-01-84 02-03-84 09-01-84 54235 RAI from NRC.

83-43, 10-25-84 54236 issued Reporting 07-25-84.

Requirements of 10CFR50.72 and 50.73, FNP-1 and 2 (T.S.

6.9.1.11,12,13)

--a

,, - - _ _ - - _ _ _ _ _ _ _ _ _ - - - - - _ - - - - - _ - - - _ _ _ _ _ - - -. _ -. - _ - - - - - - - _ _ ~ _ - -. _

ATTACHENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SU8MITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS

22. Administrative 05-14-84 11-12-84 55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.

6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1) 06-01-84 12-01-84 55169 23.

RWST and Accumulator IST 55170 Justification, FNP-1 and 2 (IST Program) 24.

Administrative 06-25-84 12-01-84 55412 Change to 55413 Reflect 2 Assistant Plant Managers, FHP 1 and 2 (T.S.

Figure 6.2-2) 55409

25. Administrative 07-06-84 01-07-85 Change to 55410 Remove Snubber Tables and Other Minor Changes, FHP-1 and 2.

(T.S.

Tables 3.7-4a and b) 54894 04-20-84 03-01-85 26.

Revised Heatup and Cooldown (FNP-1)

(FNP-1)

Curves Based 0.4 54234 02-10-84 02-10-85 Reactor Vessel Material 06-18-84 (FNP-2)

Surveillance (FHP-2)

Program, FNP-1

\\

ATTACHMENT PAGE 6 STATUS DF LICENSING ITEMS REQUIRING NRC APPROVAL i

PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS

27. Special Test 09-01-84 03-01-85 Exception to Eliminate Excessive Flux Mapping During Startup After R.O., FNP-1 and 2 (T.S.

3/4.10.2) i 28. Technical 30 days To be Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.

of 3/4.3) generic changes 29.

Schedular 06-18-82 To be lxemption to 07-27-82 deter-Appendix R 05-15-84 mined Alternative Shutdown Requirement, FNP-1 and 2 l 30. Chlorine Placed on Detection hold by Systems, FNP-1 APCo.

and 2 (T.S.

4 3.3.3.6) 1 31. RCP Breaker Placed on Position Trip hold by l

Deletion, FNP-1 APCo.

and 2 (T.S.

Table 3.3-1) i l

-