Forwards Updated Status of 1984 Licensing Items Identified in .Util Ready to Discuss Mod of Licensing Status to Address All Licensing Issues
ML20094F410
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/01/1984
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8408100036
Download: ML20094F410 (7)


Text

---

. .

  • M:iling Addr:ss Alabama Power Company 600 North 18th Street Post Of fice Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower August 1, 1984 t* w'r'"e" >'

Docket Nos. 50-348 50-364 1

Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approv_a.1_ _ _ _

Gentlemen:

Attached for your information is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated July 2, 1984.

The format of the attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date. Alabama Power Company is ready to discuss a modification of this licensing status which would address all licensing issues.

If you have any questions, please advise.

Yours truly, R. P. Mcdonald RPM /CJS:ddb-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford goal 8408100036 840801

i L.

ATTACHMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPRO/AL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE # REMARKS

1. Emergency ---

10-25-82 ---

01-06-84 ---

COMPLETE Preparedness Program Audit Once Per 12 Months, FNP-1 and 2

2. Administrative --- 04-06-83 ---

01-09-84 ---

COMPLETE Change to Footnote to T.S. Table 3.3-3, FNP-1 and 2

3. Administrative ---

12-10-82 --- 01-10-84 ---

COMPLETE Change to T.S.

Table 3.7 da, FNP-2

4. Change for --- 10-08-82 ---

01-27-84 ---

COMPLETE Turbine Valve Testing, FNP-1 and 2

5. Correct Fire --- 08-26-83 ---

02-09-84 ---

COMPLETE Protection Technical Speci fications, FNP-1 and 2

6. Administrative --- 05-27-84 --- 02-29-84 ---

COMPLETE Change to Table 3.7-4a, FNP-1

7. Correct snubber ---

05-27-83 --- 02-29-84 ---

COMPLETE Listing, FNP-1_ (FNP-1) (FNP-1) and 2 (T.S.

Table 3.7-4) --- 12-08-83 --- --- --- Deleted by (FNP-2) APCo letter dated 07-06-84.

8. 10CFR50.49 --- 02-22-84 --- 04-16-84 ---

COMPLETE Environmental Qualification Schedule Extension Submittal ,

FNP-1 L.

ATTACHMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo -

NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE f REMARKS

9. License Condi- ---

11-24-84 ---

05-17-84 ---

COMPLETE tion 2.C(17) 06-29-84 Containment 03-23-84 Mini-Parge, FNP-2 (T.S.

3.6.1.7) 10a. Mechanical ---

11-24-82 ---

05-17-84 ---

COMPLETE Snubber Listing, FNP-2 (T.S. Table 3.7-4B) 10b. Containment ---

11-24-82 ---

05-17-84 ---

COMPLETE Penetration Overcurrent Protection, FNP-2 (T.S.

Table 3.8-1)

11. Movable Control ---

03-04-83 ---

06-06-84 ---

COMPLETE Rod Action 06-03-83 Statement, 07-28-83 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 12a. River Water ---

12-30-82 --- 06-0/-84 ---

COMPLETE System 06-20-83 Deletion, FNP-1 03-02-84 and 2 (T.S. 03-27-84 3/4.7.5 and 3/4.7.6) 12b. Diesel --- 08-03-82 ---

06-07-84 ---

COMPLETE Generator 12-30-82 Overload Test, 06-03-83 FNP-1 and 2 01-31-84 (T.S. 03-02-84 4.8.1.1.2.c.5) 03-27-84

13. Charcoal Filter ---

03-04-83 --- 06-22-84 ---

COMPLETE Surveillance, 03-01-84 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14)

ATTAC MENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE # REMARKS

14. Reactor Head ---

12-12-83 07-01-84 ---

54531 Vent and Other 08-30-84 54532 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.

3/4.4.12 and existing T.S.

- Table 3.3-6, 3.3-11 and 3/4.6.4)

15. Meteorological ---

03-02-84 07-08-84 ---

54450 Tower 08-31-84 54451 Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-9 and 4.3-5) 16a. Change Monthly ---

03-01-84 09-01-84 ---

54452 Channel 54453 Calibration of Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1) 16b. Correct ---

03-01-84 09-01-84 ---

54452 Facility 54453 Organization Chart, FNP-1 and 2 (T.S.

Figure 6.2-2) 16c. Correct Valve --- 03-01-84 09-01-84 ---

54452 Numbers Listed 54453 in T.S., FNP-1 and 2 (T.S.

Table 3.6-1) i

ATTACHMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL' REQUESTED ACTUAL APC, APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE f REMERKS

17. Safety Related ---

05-03-83 11-03-83 --- 51629 Battery . 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-29-83 08-15-84

( T . S . 3 /4 . 8. 2. 3, 09-23-83 09-06-84 3/4.8.2.4 and 01-27-84 3 /4.8.2.5 )

18. Respirator ---

01-13-84 02-12-84 --- 53468 Iodine Filter 02-10-84 09-09-84 53469 Exemption 02-13-84 Request, FNP-1 03-05-84 and 2 05-08-84

19. Increase Fuel ---

03-30-84 10-01-84 --- 54672 Enrichment 05-29-84 54673 Design Limit for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.

5.3.1 and 5.6.1.2)

20. RCS Pressure ---

04-10-84 10-06-84 ---

48714 Isolation Valve 48715 Surveill ance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)

21. Generic Letter 09-01-84 02-03-84 09-01-84 ---

54235 RAI from NRC.

83-43, 10-25-84 54236 issued Reporting 07-25-84.

Requirements of 10CFR50.72 and 50.73, FNP-1 and 2 (T.S.

6.9.1.11,12,13)

ATTACHENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SU8MITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE # REMARKS

22. Administrative --- 05-14-84 11-12-84 ---

55029 Change to 55030 Reflect Senior Vice President Change, FNP-1 and 2 (T.S.

6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1)

23. RWST and ---

06-01-84 12-01-84 ---

55169 Accumulator IST 55170 Justification, FNP-1 and 2 (IST Program)

24. Administrative ---

06-25-84 12-01-84 ---

55412 Change to 55413 Reflect 2 Assistant Plant Managers, FHP 1 and 2 (T.S.

Figure 6.2-2)

25. Administrative --- 07-06-84 01-07-85 --- 55409 Change to 55410 Remove Snubber Tables and Other Minor Changes, FHP-1 and 2. (T.S.

Tables 3.7-4a and b) .

26. Revised Heatup --- 04-20-84 03-01-85 --- 54894 and Cooldown (FNP-1) (FNP-1)

Curves Based 0.4 Reactor Vessel --- 02-10-84 02-10-85 --- 54234 Material 06-18-84 (FNP-2)

Surveillance (FHP-2)

Program, FNP-1

\

ATTACHMENT PAGE 6 STATUS DF LICENSING ITEMS REQUIRING NRC APPROVAL i

PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S) DATE DATE # REMARKS

27. Special Test 09-01-84 ---

03-01-85 --- ---

Exception to Eliminate Excessive Flux Mapping During Startup After R.O., FNP-1 and

! 2 (T.S.

3/4.10.2) i 28. Technical 30 days ---

To be --- ---

Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S. of 3/4.3) generic changes

29. Schedular ---

06-18-82 To be --- ---

lxemption to 07-27-82 deter-Appendix R 05-15-84 mined Alternative Shutdown Requirement, FNP-1 and 2 l 30. Chlorine --- --- --- --- --- Placed on Detection hold by Systems, FNP-1 APCo.

and 2 (T.S. 4 3.3.3.6) 1 31. RCP Breaker --- --- --- --- --- Placed on Position Trip hold by l Deletion, FNP-1 APCo.