s, Chw Mr ft31 Ot!n;t d'a U/G f i' ton. M u. wi (Q61 q
January 7, 1992
, UNION ILLECTitlC 33 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2545
Dear SJr:
DOCKET NUMBER 50-483 CALLAVAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTilLY OPERATING REPORT DECEMBER 1991 The enclosed Monthly Operating Report for December, 1991 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
(
\\a I
frt J. D. Blo er Manager, Callaway Plant JDB/DEY/RDA/ TAM /RJM/cre
~
Enclosure cc: Distribution attached
/
g=m unk
- o,
a i
~-,
- = -
cc distribution for ULNRC-2545 l
=
with enclosures
.Mr. Richard Hague,~ Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road
' Glen Ellyn, IL -60137 Mr. R. J.. Hall (2 copies)-
Office of Nuclear Reactor Regulation
-U. S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852
-NRC Resident Inspector Manager, Electric Department
- Missouri Public Service Commission
-P.O. Box 360 Jefferson City, MD 65102 4
.,.,...a
~.
.0' DOCKET.NO.
50 483-i UNIT NAME CALIAWAY UNIT 1 DATE 01-07-92 COMPLETED BY R. J. McCann TELEPHONE 314/676-8243 PART A OPERATIONS
SUMMARY
- The plant operated at approximately 100% power for the entire month with the following exceptions.
On 12/06/91,. load was reduced to 50% due'to commencing a shutdown per Technical Specification 3.1.1.3.b for Moderator Temperature Coefficient
. concerns (i.e., MTC more negative than EOL limit). Discussions with the NRC and. Westinghouse resulted in a temporary waiver <f cocnliance for T.S.
's.l.1.3.b and full power operations resumed later that erf.
On 12/07/91, load was reduced to 96% to perform a Moderator Temperature Coefficient nearurement test on 12/09/91. Full power operation
. resumed on.12/09/91.
On 12/iS/91, load was reduced to 96% to perform a Moderator Temperature Coefficient measurement test on 12/17/91. Full power operations resumed on 12/17/91.
PART B PORV AND SAFE 1Y VALVE
SUMMARY
None r
l l
L l-Page 1 of 4 l
L l
r d
z-_.
I
~,
i f
~PAPT C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT-Callaway Unit 1 DATE 01-07 92 C0JPLETED BY R. J. McCann TdiEPHONE 314/676-8243 l
MONTH: DECEMBER 1991 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER-LEVEL DAY' (HWe-Neti LAY (HWe) 1 1160 17 1157 2
1178 18 1180-3 1180 19 1165 4
1175 20 1178 5
1171 21 1179 6
1112' 22
'1174 7
1161 23 1174 8
1125-24 1178 9
~ 1141 25 1176
-10 1173-26 1176 11 1171-27 1175 12 1166 28 1174 13-1174 29 1177 14 1178-30-1177-15 1178 31 1179 16 1165 Page 2 of 4
j i
3 j
1 Part D-OPERATING DATA REPORT DOCKET NO.
50 483 i
UNIT NAME CA1.1AUAY _ UNIT 1 DATE 01 07 92 COMPLETED BY R. J. McCANN TELEPHONE 314/676-8243 j
i OPERATING STATUS-1
(,!,Tg
[LM) 1.-
REPORTING PERIOD: December 1991 GR E3 HOUR $ IN REPORTING PERIOD: 744 8760 61,621.5 2.
CURRENTLYAUTHORIZEDPDVERLEVEL(K4t): 3565 MAX. DEFEND. CAPACITY (K4e-Net): 1125-DESIGN ELECTRICAL _ RATING (MWe-Net- -1171 1
3.- POWER LEVEL TO VHICH RESTRICTED (lF ANY)(HWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
IH15 MONTH YR TO DATE CUMUL ATIVE 5.
NUMBER OF HOURS REACTOR VAS CRITICAL.....
7,4.0 8734.1 54.079.5 6.
REACTOR RESERVE SHUT 00VN HOURS..........
0 0
0 7.
HOURS GENERATOR DN LINE.,.............
744,0 8726.2 52.849.4 8.
UNIT RESERVE SHUTDOWN HOURS.....
0 0
0
- 19. GROSS THERHAL ENERGY GENERATED (MWH)....
2,602,283 30.375.268-173.686.767
- 10. GROSS. ELECTRICAL ENERGY GENERATED (MVH)..
DOS,766 10.451,583 60,063,164
' 11..
NET ELECTRICAL ENERGY GEpr. RATED (MWH)...
869,503-9,979.371 57.079,548
- 12. REACTOR SERVICE FACTOR...............
100,0 99.7 87.8-
- 13. REACTOR AVAILABILITY FACTOR.....
100.0 99.7 87.8 14 LHIT SERV!CE FACTOR................
100.0 99.9 85.8 '
- 15. UNIT AVAILABILITY FACTOR....
100.0 99.9 85.8
- 16. UNIT CAPACl!Y m'. TOR (Using MDC)..
103.9 101.3 82.3
- 17. UNIT CAPACITT FACTOR (Using Design MWe).
99.8 97,3 79.1
- 18. UNIT FORCED OUTAGE RATE.........
0.0 0.4 3.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH): Refueling; Date: 3/fC/92; Duration: 63 pays
- 20. IF SHbT DOWN AT END OF NEPORTIN9 PERIOD, ESTIMATED DATE OF STARTUP:
Page 3 of 4
s PART E' UNIT SHUTDOL, AND F0VER REDUCTIDMS DOCKET no.
50-483 i
UNIT NAME CALLAWAY UNIT 1 DATE L.-07-92 COMPLETED BY R. J. W Cann TELEPHONE 314/676-8243 REPORT MONTH: DECEM3ER 1991 METHOD OF TYPE SHUTTING DOWM F ?
_1 DURATION THE REACTOR OR -
No.
DATE S. ' G LED (HDURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /CDMMEMTS 18 12/06/91 F
0
.1 1
On 12/06/91, load was reduced to 5G% due to etrrencing a shutdown per Technical Specification 3.1.1.3.b for Moderator Temperature Coefficient conctrns (i.e.. MTC more negative than EDL limit). Discussions with the NRC ed Westinghouse resulted in a tecporary waiver of compliance fer T.S.
3.1.1.3.b and full 3.2wer o.erations resured latee that day.
19 12/07/91 S
0 S
I On 12/07/91, load was reduced to 96% to perform a Mode-ator Temperature Coefficient measurerent te*t on 12/09/91. e.Il power operation ress ed on 12/09/91.
20 12/16/91 S
0 B
1 Dn 12/16/91, load was redxed to 951 to perfem a Moderator Temperature Coefficient measuremt test on IC/17/91. Full power operation resumed on 12/17/91.
SUMMARY
REASON METHOD A: JJIPMENT FAILURE (EXPLAIN)'
1: MANUAL B: MAINT. OR TEST 2: MANJAL SCRAM C. RIFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION s: OlHER (EXPLAIM)
E: CPERATOR TRAINING AND LICENSE EXAMIMATIDW F:. ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN) t t
v m L-
- m---.
- -