Monthly Operating Rept for Dec 1991 for Callaway Plant,Unit 1
ML20094E262
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/31/1991
From: Blosser J, Mccann R
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2545, NUDOCS 9201230015
Download: ML20094E262 (6)


Text

.

^*

s, Chw Mr ft31 Ot!n;t d'a U/G f i' ton. M u. wi (Q61 q

January 7, 1992

, UNION ILLECTitlC 33 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2545

Dear SJr:

DOCKET NUMBER 50-483 CALLAVAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTilLY OPERATING REPORT DECEMBER 1991 The enclosed Monthly Operating Report for December, 1991 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

(

\\a I

frt J. D. Blo er Manager, Callaway Plant JDB/DEY/RDA/ TAM /RJM/cre

~

Enclosure cc: Distribution attached

/

g=m unk

- o,

a i

~-,

  • = -

cc distribution for ULNRC-2545 l

=

with enclosures

.Mr. Richard Hague,~ Chief Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road

' Glen Ellyn, IL -60137 Mr. R. J.. Hall (2 copies)-

Office of Nuclear Reactor Regulation

-U. S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852

-NRC Resident Inspector Manager, Electric Department

- Missouri Public Service Commission

-P.O. Box 360 Jefferson City, MD 65102 4

.,.,...a

~.

.0' DOCKET.NO.

50 483-i UNIT NAME CALIAWAY UNIT 1 DATE 01-07-92 COMPLETED BY R. J. McCann TELEPHONE 314/676-8243 PART A OPERATIONS

SUMMARY

- The plant operated at approximately 100% power for the entire month with the following exceptions.

On 12/06/91,. load was reduced to 50% due'to commencing a shutdown per Technical Specification 3.1.1.3.b for Moderator Temperature Coefficient

. concerns (i.e., MTC more negative than EOL limit). Discussions with the NRC and. Westinghouse resulted in a temporary waiver <f cocnliance for T.S.

's.l.1.3.b and full power operations resumed later that erf.

On 12/07/91, load was reduced to 96% to perform a Moderator Temperature Coefficient nearurement test on 12/09/91. Full power operation

. resumed on.12/09/91.

On 12/iS/91, load was reduced to 96% to perform a Moderator Temperature Coefficient measurement test on 12/17/91. Full power operations resumed on 12/17/91.

PART B PORV AND SAFE 1Y VALVE

SUMMARY

None r

l l

L l-Page 1 of 4 l

L l

r d

z-_.

I

~,

i f

~PAPT C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT-Callaway Unit 1 DATE 01-07 92 C0JPLETED BY R. J. McCann TdiEPHONE 314/676-8243 l

MONTH: DECEMBER 1991 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER-LEVEL DAY' (HWe-Neti LAY (HWe) 1 1160 17 1157 2

1178 18 1180-3 1180 19 1165 4

1175 20 1178 5

1171 21 1179 6

1112' 22

'1174 7

1161 23 1174 8

1125-24 1178 9

~ 1141 25 1176

-10 1173-26 1176 11 1171-27 1175 12 1166 28 1174 13-1174 29 1177 14 1178-30-1177-15 1178 31 1179 16 1165 Page 2 of 4

j i

3 j

1 Part D-OPERATING DATA REPORT DOCKET NO.

50 483 i

UNIT NAME CA1.1AUAY _ UNIT 1 DATE 01 07 92 COMPLETED BY R. J. McCANN TELEPHONE 314/676-8243 j

i OPERATING STATUS-1

(,!,Tg

[LM) 1.-

REPORTING PERIOD: December 1991 GR E3 HOUR $ IN REPORTING PERIOD: 744 8760 61,621.5 2.

CURRENTLYAUTHORIZEDPDVERLEVEL(K4t): 3565 MAX. DEFEND. CAPACITY (K4e-Net): 1125-DESIGN ELECTRICAL _ RATING (MWe-Net- -1171 1

3.- POWER LEVEL TO VHICH RESTRICTED (lF ANY)(HWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

IH15 MONTH YR TO DATE CUMUL ATIVE 5.

NUMBER OF HOURS REACTOR VAS CRITICAL.....

7,4.0 8734.1 54.079.5 6.

REACTOR RESERVE SHUT 00VN HOURS..........

0 0

0 7.

HOURS GENERATOR DN LINE.,.............

744,0 8726.2 52.849.4 8.

UNIT RESERVE SHUTDOWN HOURS.....

0 0

0

19. GROSS THERHAL ENERGY GENERATED (MWH)....

2,602,283 30.375.268-173.686.767

10. GROSS. ELECTRICAL ENERGY GENERATED (MVH)..

DOS,766 10.451,583 60,063,164

' 11..

NET ELECTRICAL ENERGY GEpr. RATED (MWH)...

869,503-9,979.371 57.079,548

12. REACTOR SERVICE FACTOR...............

100,0 99.7 87.8-

13. REACTOR AVAILABILITY FACTOR.....

100.0 99.7 87.8 14 LHIT SERV!CE FACTOR................

100.0 99.9 85.8 '

15. UNIT AVAILABILITY FACTOR....

100.0 99.9 85.8

16. UNIT CAPACl!Y m'. TOR (Using MDC)..

103.9 101.3 82.3

17. UNIT CAPACITT FACTOR (Using Design MWe).

99.8 97,3 79.1

18. UNIT FORCED OUTAGE RATE.........

0.0 0.4 3.0

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH): Refueling; Date: 3/fC/92; Duration: 63 pays
20. IF SHbT DOWN AT END OF NEPORTIN9 PERIOD, ESTIMATED DATE OF STARTUP:

Page 3 of 4

s PART E' UNIT SHUTDOL, AND F0VER REDUCTIDMS DOCKET no.

50-483 i

UNIT NAME CALLAWAY UNIT 1 DATE L.-07-92 COMPLETED BY R. J. W Cann TELEPHONE 314/676-8243 REPORT MONTH: DECEM3ER 1991 METHOD OF TYPE SHUTTING DOWM F ?

_1 DURATION THE REACTOR OR -

No.

DATE S. ' G LED (HDURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /CDMMEMTS 18 12/06/91 F

0

.1 1

On 12/06/91, load was reduced to 5G% due to etrrencing a shutdown per Technical Specification 3.1.1.3.b for Moderator Temperature Coefficient conctrns (i.e.. MTC more negative than EDL limit). Discussions with the NRC ed Westinghouse resulted in a tecporary waiver of compliance fer T.S.

3.1.1.3.b and full 3.2wer o.erations resured latee that day.

19 12/07/91 S

0 S

I On 12/07/91, load was reduced to 96% to perform a Mode-ator Temperature Coefficient measurerent te*t on 12/09/91. e.Il power operation ress ed on 12/09/91.

20 12/16/91 S

0 B

1 Dn 12/16/91, load was redxed to 951 to perfem a Moderator Temperature Coefficient measuremt test on IC/17/91. Full power operation resumed on 12/17/91.

SUMMARY

REASON METHOD A: JJIPMENT FAILURE (EXPLAIN)'

1: MANUAL B: MAINT. OR TEST 2: MANJAL SCRAM C. RIFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION s: OlHER (EXPLAIM)

E: CPERATOR TRAINING AND LICENSE EXAMIMATIDW F:. ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN) t t