ML20094D373
Jump to navigation
Jump to search
| ML20094D373 | |
| Person / Time | |
|---|---|
| Site: | 05000601 |
| Issue date: | 07/31/1984 |
| From: | WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | |
| Shared Package | |
| ML19273A435 | List: |
| References | |
| NUDOCS 8408080347 | |
| Download: ML20094D373 (1) | |
Text
.
t 17.0 OVALITY ASSURANCE 17.1 Quality Assurance During Desian and Construction The Westinghouse Water Reactor Divisions Quality Assurance Program is O
described in Reference 1.
See the RESAR-SP/90 integrated PDA submittal for a description of the complete l
WAPWR Quality Assurance Program, including modifications to reflect the expanded design and construction scope of the WAPWR NPB.
17.1.1 References 1.
" Westinghouse Water Reactor Divisions' Quality Assurance Plan," WCAP-8370, Revision 9A, Amendment 1, February, 1981.
4 0
3 lO O
5 l
1 WAPWR-RS 17.1-1 JULY, 1984 1546e:1D 1
8408080347 840731 PDRADOCK050 Cog
-