NUREG 75/087 fp r.no og UeS. NUCLEAR RESULATORY COMMISSISN y

i i

STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION v

SECTION 2.4.11 LOW WATER CONSIDERATIONS REVIEW Resp 0NSIBILITIES Primary - Site Analysis Branch (SAB)

Secondary - None I.

AREAS OF REVIEW The purpose of this section of the applicant's safety analysis report (SAR) is to identify natural events that may reduce or limit the available cooling water supply, and to assure that an adequate water supply will exist to operate or shut down the plant, as required.

Depending on the site, the areas of review include:

1.

The worst drought considered reasonably possible in the region.

2.

Low water (setdown) resulting from surgeq, seiches, or tsunamis.

3.

The effect of existing and proposed water control structures (dams, diversions, siltation dam failures, etc.).

4.

The intake structure and pump design basis :n relation to the events described in SAR Sections 2.4.11.1, 2.4.11.2 and 2.4.11.4, and historical low water conditions.

5.

The use limitations imposed or under discussici by federal, state, or local agencies authorizing the use of the water.

6.

The range of water supply required by the plant, including minimum operating and shutdown flows, compared to availability.

II. ACCEPTANCE CRITERIA Acceptance is ased principally on the adequacy of the intake design basis for safe shutdown, cooldown (first 30 days), and long-term cooldown (periods in excess of 30 days) in the event of adverse natural phenomena or plant accidents. Where the specific design bases preclude plant operation during severe hydrologically-related events, sufficient waming time must be demonstrated 50 that the plant may be shut down during or in advance of adverse events without causing potential damage to safety-related facilities. In cases where sufficient warning time to permit advance shutdown is considered necessary to protect safety-related components, an item in the plant Technical Specifications will be required.

USNRC STANDARD REVIEW PLAN N'nN,'MeYne dE/meNe*"e,e*'$* e edNe"te the pum"Es *,'wt f the c"e "m7mN'pe'u$mT.Ne$.$ N 2."t C n*diU

"~ '

ue

=

e'.'"","::"/,;'Om:e':.:..:t S. e_7" ",'.',2.to ea..,0, met - e es se

,g -.* 0l" /," "'.';"O",'",e =O',E'"S=n,'==l=l"STe',e"*

=

"",e:, e"e."tn.

t

.0, e.e

,0.e.

O t.,0 e,

,wbbbhed stendefd POWOW piene WWOH be revised perledleetly, se e,,fe,tiste. to Secommodate sommente end te refleet new informatten end es,enence Cesnmente and suggest6ene fe, impeowement will be e 2 and should he sent to the U.S Nweseer Regesetery Commtee6en.Offlee of flueleet Roseter Regutetten. Weehington, D.C. 30EK 9511010103 751124 PDR NUREG 75/087 R PDR 11/24/75

SAR SIction 2.4.11.1 (Low Flow in Rivers and Streams): for esstntial watsr supplies the low ficw/ low level design for the primary water supply source must be based on the probable minimum low flow and level resulting from the most severe drought that can reasonably be considered possible for the region. The low flow and level design bases for operation (if different than the design bases for essential water requirements) should be such that shutdowns caused by inadequate water supply will not cause frequent use of emergency systems. In cases where a canon source of cooling water for operation and safety is provided, and where operation can affect minimum levels required for safety, the system will be acceptable if technical specifications are provided for shutdown before the ultimate heat sink can be adversely affected.

SAR Section 2.4.11.2 (Low Water Resulting from Surges, Seiches or Tsunamis): if the site j

is susceptible to such phenomena, minimum water levels resulting from setdown (sometimes i

calledrunoutorrundown)fromhurricanesurges,seiches,andtsunamismustbehigherthan the intake design basis for essential water supplies. For coastal sites, the appropriate probable maximum hurricane (PMH) wind fields must be postulated to give maximum winds blowing offshore, thus creating a probable minimum surge level. Low water levels on inland ponds, lakes, and rivers due to surges must be estimated from probable maximum winds oriented away from the plant site. The same general analysis methods discussed in Standard Review Plans 2.4.3, 2.4.5 and 2.4.6 are applicable to low water estimates due to the various phenomena discussed.

SARSection2.4.11.3(HistoricalLowWater): if historical flows and levels are used to estimate design values by inference from frequency distribution plots, the data used must j

be presented so that an independent determination can be made. The data and methods of the National Oceanic and Atmospheric Administration, United States Geologic Survey, Soil Con-servation Service, Bureau of Reclamation and the Corps of Engineers are acceptable.

SAR Section 2.4.11.4 (Future Controls): this section is acceptable if water use and dis-charge limitations (both physical and legal), already in effect or under discussion by responsible federal, regional, state, or local authorities, that may affect water supply at the plant have been considered and are substantiated by reference to reports of the appropriete agencies. The most adverse possible effects of these controls must be f

shown and taken into account in the design basis to assure that essential water supplies are j

l not likely to be affected adversely in the future, SAR Section 2.4.11.5 (Plant Requirements): acceptance is based on the following required infonmtion:

1.

Minimum essential cooling water flow rates and levels must be presented (or cross-referenced) and shown to be less than the probable minimum low flows and levels from the applicable sources of supply.

2.

Maximum water requirements for normal operation must be presented and (if applicable) shown to be less than the water available under all likely conditions from the sources of supply.

2.4.11-2 11/24n5 e

a

SAR Section 2.4.11.6 (Heat Sink Dep;ndability Requirements): the required data and information are thosi necessary to determine that the facility meets the criteria of Regulatory Guide 1.27. The analyses will be considered complete and acceptable if the following are adequately addressed:

1.

The initial water inventory must be sufficient for shutdown and cooldown of the plant.

2.

Water losses (such as seepage, drift, and evaporation) must be conservatively estimated, as suggested in Revision 1 to Regulatory Guide 1.27.

3.

The design basis hydrometeorology (temperature, dewpoint, etc.) must be as conserva-tive as the criteria e' the guide (see Standard Review Plans 2.3).

4.

The limit on the hea'. sink return water temperature must be less than the maximum allowable cooling water inlet design temperature.

III. REVIEW PROCEDURES Minimum plant requirements (water level and flow) that are identified in SAR Sections 2.4.11.5 or 9.2.5 are compared to the estimated minimum water levels and flows given in Section 2.4.11.1.

If nomal operation is not assured at the minimum water supply conditions, and loss of normal operation capability can adversely affect safety-related components, estimates of warning time are reviewed to assure that shutdown or conversion to alternate water sources can be accomplished prior to the trip. For such cases, emergency operating procedures are required, and are reviewed to assure that they are consistent with the postulated conditions.

The analysis of the dependability of the ultimate heat sink is reviewed and the conclusions are provided to the Auxiliary and Power Conversion Systems Branch (APCSB). Determination of the dependability of the ultimate heat sink is accomplished by using Revision 1 of Regulatory Guide 1.27 as a standard of comparison.

Each source of water for normal or emergency shutdown and cooldown, and the natural phenomena and site-related accident design criteria for each should be identified. A systems analysis is first undertaken of all water supply sources to determine the likelihood that at least one source would survive (1) the most severe of each of the natural phenomena; (2) site-related accident phenomena; and (3) reasonable combinations of less severe natural and accident phenomena. Second, arbitrarily assumed mechanistic failures of water supply structures and conveyance systems are postuldted and the systems analysis repeated, to assure that the failure of one component will not cause failure of the entire system. These analyses are coordinated with the APCSB review of the ultimate heat sink and related cooling systems, to avoid duplication. Operating rules for each portion of the system are ascertained to detemine the amount of water that can be assumed available in the event of normal or accidental shutdown. Consultations with the Meteorology and the Seismology, Geology, and Foundation Engineering Sections of SAB, and with Accident Analysis Branch, Structural 1

Engineering Branch, and APCSB are undertaken where design criteria are not firmly established, Estimates of water loss due to drift, evaporation, and blowdown are evaluated based on observed severe hydrometeorological measurements at similar locations (coordinated with the MeteorologySectionofSAB). If independent analyses are deemed necessary, computer programs such as HEC-2 (Water Surface Profiles). HEC-3 (Reservoir System Analysis) HEC-4 (Monthly Streamflow Simulation), etc. are utilized.

2.4.11-3 11/24/75 5

~-

The potential for surges in intake stenps that could cause adverse effects are review:d to assure that the effects have been properly incorporatid for the intake design. The potential for adverse hydrodynamic effects of a trip of the intake pumps is evaluated based on potential surges in intake sumps.

For multiple purpose (normal operation, normal shutdown, and emergency shuto m) water supply systems the primary portion of the system is first reviewed to determine tnat the water supply will be maintained at minimum volume requirements at all times. The secondary por-tion of the system is then reviewed to determine whether an adequate emergency water supply can be expected to be available during operating conditions such as the regional drought of record (flows must be adjusted for historical m potential future effects). If not, the applicant is requested to provide a technical specification requiring plant shutdown at the point where an adequate shutdown water supply is still assured.

Institutional restraints on water use, such as limitations in water use and discharge permits. are reviewed to assure the plant will have an adequate supply and not exceed

{

limitations imposed upon operation. If a conflict is foreseen, the applicant is requested I

to either obtain a variance or make a design change to accortraodate the limitation.

1 i

For plants using rivers, minimum design service water levels are compared with asymtotic extrapolations of low flow frequency curves which have been corrected for historical and potential future effects. For ocean or estuary plants, design low water levels are compared with probable maximum hurricane and tsunami-induced low water levels. For Great Lakes plants, design low water levels are compared with minimum historical levels coincident with probable maximum surge or seiche-induced low water levels.

If the ultimate heat sink system is not capable of continued long-term water supply under the criteria in Revision 1 to Regulatory Guide 1.27, or the above considerations, the system will be reviewed in two parts; short-term capability and long-term capability. For short-term j

capability, the ApCSB and the Licensing Project Manager (LPM) will be informed if the independently-estimated supply appears to be less than 30 days. The applicant will be asked to determine whether sufficient personnel and equipment can safely be made available to switch water supply sources in the event of an accident. If emergency procedures are required to obtain the use of alternate water supplies, the applicant's water supply sources and procedures will be reviewed with APCSB and the LPM to determine that there is continuity of water supply.

The time period for which a highly dependabis water supply would be available is compared with the time required to obtain water from an alternative supply, and the natural or accident environmental conditions which could prevail.

For long-term water supply capability, different sources and means of obtaining water may be required because of the limited capability of a "short-term" supply. In those cases where different sources are necessary to assure the long-term plant heat removal capa-j

}

bility the alternative sources and the means of supplying water from the sources to the plant should be identified. Any plant design provisions necessary for such situations should also be described or a reference provided to other SAR sections for the descriptions, f

2.4.11-4 i

11/24/75 l

y

- -. - ~.,.~

i Enorgency means for obtaining lone-Berm cater supplies till be judged on the basis of the time required to obtain such supplies, natural or accident phenomena likely to prevail or to have caused the need for such supplies, and the dependability of the supply itself.

IV. EVALUATION FINDINGS l

For construction permit (CP) reviews the findings will consist of a statement of the l

applicant and staff estimates of the design basis minimum water flows and levels. If the estimates are similar, staff concurrence in the applicant's estimate will be stated.

If the staff estimates substantially lower water levels or flows, and if the proposed plant i

may be adversely affected, a statement of the staff position (bases) will be made. A l

similar finding on the design bases for the ultimate heat sink will be made. If technical specification requirements are needed to assure an adequate supply, they will be indicated in the.CP statement and required for operation.

For operating license (0L) reviews of plants for which detailed low water reviews were done at the CP stage, the CP conclusions will be referenced. In addition, the results of a review to reaffirm the low water design bases will be noted, if no changes have been made to the ultimate heat sink design since the CP review, the conclusions of the CP will be referenced. However, for both the low water considerations and the ultimate heat sink, an evaluation will be made during the OL review to assure that the design bases have been properly implemented. The availability of long-term water supply will be noted, if no i

low water and ultimate heat sink review was undertaken at the CP stage (of the scope described), this fact will be noted also.

j A sample CP-stage statement follows:

"The applicant proposes two sources of water supply; groundwater and the adjacent A River.

" Groundwater would be used for make-up to the essential service water cooling towers, for potable water supply, and for demineralizer water. The applicant estimates the demineralizer would require about 825 gallons per minute (gpm) for the first several months and an average rate of 425 gpm thereafter. Potable water requirements are estimated at about 10 gpm.

"The A River is to provide the principal source of cooling water. The applicant estimates the maximum water requirement for the plant will be 107 cfs. Of this 61 cfs would be consumptively used and 46 cfs would be returned to the Rock River. The historical recorded low flow in the A River in the site region was about 500 cfs at the B gage.on September 14, 1958 and about 440 cfs at the C gage on August 20, 1934. The applicant estimates the comparable low flow at the site to be 400 cfs. Assuming breaching of l

D Dam five miles downstream, the low flow would result in an estimated water surface elevation of 664 ft MSL.

I j

" Emergency cooling sources and associated principal facilities comprise the A River,

[

groundwater, the river screenhouse, the essential service coolin;, towers, ground-water well(s) and attendant distribution systems. The river screenhouse is to a

T 2.4.11-5 11/24/75 e

~.

be a seismic Category I facility and was initially propos9d to be protec2ed from flooding up to the Standard Project Flood (SMF). Groundwater wells, located at the plant site, are above estimated PMF water levels. The applicant proposes to use groundwater for make-up to the essential service towers whenever the A River, screenhouse, or piping is unavailable. Estimated groundwater use would be 1600 gpm. At the staff's request the applicant reconsidered the flood design basis for the river screenhouse for relatively I

long periods of time when the A River could be higher than a SPF and an earthquake could prevent water from being available from wells. The applicant subsequently upgraded the l

flood design basis for the screenhouse to a Probable Maximum Flood, and concludes the l

proposed facilities meet the suggested criteria of Regulatory Guide 1.27 - Ultimate Heat Sink. We concur.

V.

REFERENCES 1.

L. R. Beard " Methods for Determination of Safe Yield and Compensation Water from Storage", Seventh International Water Supply Congress, Barcelona, Spain (1966).

2.

L. R. Beard " Statistical Methods in Hydrology", Corps of Engineers (1962).

3.

B. R. Bodine, " Storm Surge on the Open Coast: Fundamentals and Simplified Prediction",

Technical Memorandum No. 35. Corps of Engineers Coastal Engineering Research Center, May 1971.

4.

D. K. Brady, et al., " Surface Heat Exchange at Power Plant Cooling Lakes". EEI Publica-tion 69-901. Edison Electric Institute, New York, Nov. 1969.

5.

V. T. Chow (ed), " Handbook of Applied Hydrology", McGraw-Hill Book Company, New York (1964).

6.

J. E. Edinger and J. C. Geyer, " Heat Exchange in the Environment", EEI Publication 69-902, Edison Electric Institute, New York, June 1965.

6A.

J. E. Edinger, et al., " Generic Emergency Cooling Pond Analysis", prepared for U.S.

f Atomic Energy Commission under Contract No. AT(11-1)-2224 (1972).

7.

G. M. Fair, et al., " Water and Wastewater Engineering", Vol.1. John Wiley & Son Inc.,NewYork(1966).

8.

" Scientific Hydrology". Ad Hoc Panel on Hydrology, Federal Council for Science and Technology, Washington, D.C., June 1962.

9.

M. B. Fiering, and M. M. Hufschmidt. " Simulation Techniques for Design of Water-Resource Systems" Harvard Univer'ity Press, Cambridge, Mass. (1966).

l 10.

R. K. Linsley, et al., " Hydrology for Engineers", McGraw-Hill Book Company, New York (1958).

I 2.4.11-6

\\

l

\\

11/24/75 e

e.-

e

+

____~--m_-___

_.m--_____________,__

i 11.

R. K. Linsley and J. B. Franaint, " Water-Resources Engineering". McGraw-Hill Book Company,NewYork(1964).

12.

A. Maas, et al., " Design of Water-Resources Systems," Harvard University Press, Cantridge, Mass. (1962).

13.

G. W. Platzman, "The Dynamical Prediction of Wind Tides on Lake Erie" Technical Report No. 7 Department of Geophysical Sciences.' University of Chicago (1962).

14.

R. O. Reid and B. R. Bodine, " Numerical Model for Storm Surges in Galveston Bay",

Jour. Waterways and Harbors Division. Am. Soc. Civil Engineers, Vol. 94, No. WW1, pp.33-57(1968).

i i

- 15. " Hydrologic Engineering Methods for Water Resources Development". Vol.1-12, Corps of l

Engineers Hydrologic Engineering Center, Davis, California (1971).

I I

16. " Reservoir Storage-Yield Procedures", Corps of Engineers Hydrologic Engineering Center, j-Davis, California (1967).

i l-

17. " Shore Protection Planning and Design", Technical Report No. 4. Third Edition, Corps of I

Engineers Coastal Engineering Research Center (1966); and " Shore Protection Manual,"

1973.

18. Regulatory Guide 1.27. " Ultimate Heat Sink", Revision 2.

\\

l

19. " Design of Small Dams" Second Edition, Bureau of Reclamation, U.S. Department of Interior (1973).
20.." Interim Report - Meteorological Characteristics of the Probable Maximum Hurricane, Atlantic and Gulf Coasts of the United States", Report HUR 7-97 (see also HUR 7-97A),

~

U.S. Weather Bureau (now NOAA) (1968),

21. " Water Surface Profiles", HEC-2, Corps of Engineers Hydrologic Engineering Center (continuously updated).
22. " Reservoir System Analysis", HEC-3, Corps of Engineers Hydrologic Engineering Center (updated).
23. " Monthly Streamflow Simulation", HEC-4, Corps of Engineers Hydrologic Engineering Center (updated).
24. Regulatory Guide 1.70, " Standard Fomat and Contents of Safety Analysis Reports for Nuclear Power Plants," Revision 2.

2.4.11-7 11/24/75 i

i e

f

-ee

~

r--

m-r-.,w

  1. A..--.Mm.Jh...

S. a e e m a.m.4 a Mas J.6 4Manh 4 n 5 4. A sus 4AA.

.,*.hwe, e.en-.a-oda.esaa.-<_4 eand--s--.

m.e..* awe.hae-*s..1se am - Ama-6am

-e a m:-eE-m s 4--

a w

er-A a.a.

.a s a a-as __. s wa e u

d V

Y 9

b 6

4 e

6 9

8 9

-11/24/75 o

e e

~

a

-M.

._s,y+-

.ua l

i I

l i

,