Special Rept 95-03:on 950913,filtration Recirculation & Ventilation Sys (FRVS) High Range Noble Gas Monitor Declared Inoperable.Listed Repairs Made & FRVS Will Be Restored to Operable Status Upon Completion of Required Testing
ML20094A019
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/24/1995
From: Reddemann M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
95-03, 95-3, NUDOCS 9510300150
Download: ML20094A019 (2)


Text

.

s

([])IFt!5slBit[i Public Service Electric and Gas Cornpany P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nudear Buhness Unit OCT 2 41995 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

J SPECIAL REPORT 95-03 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 This Special Report is being submitted pursuant to the requirements of Hope Creek Technical Specification Table 3.3.7.5-1, Action 81 b, due to the filtration recirculation and j

ventilation system (FRVS) high range noble gas monitor being inoperable for more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

On September 13, 1995, during performance of a routine functional test of the FRVS vent radiation monitor, a blown power fuse was found.

This blown poder fuse rendered the controller for the sample flow through the FRVS radiation monitoring system skid inoperable, including the high range noble gas monitor.

Initial corrective actions taken to prevent recurrence of the blown power fuse included the replacement of a transformer in the flow controller power supply.

On September 26, 1995, the transformer replacement was completed for the FRVS radiation monitoring system skid, however, the power fuse was blown again during retesting.

Subsequently, the entire flow controller card was removed and shipped to the manufacturer to determine the cause of 4

the blown power fuses and to make appropriate repairs.

The card was an obsolete part and no other cards were available to replace the one sent to the manufacturer.

The manufacturer concluded that power transformer for the card needed to be replaced.

The card was repaired and calibrated by the manufacturer and returned.

The repaired card was re-installed on October 23, 1995, and upon completion of required testing, the FRVS high range noble gas monitor will be restored to an operable status.

As specified in Technical Specification Table 3.3.7.5-1, Action 81 b, this special report was required to be submitted to the NRC i

within 14 days following the event.

However, it was not i

discovered until 10/10/95 that this special report was required by the Technical Specifications.

The cause of this late special report will be addressed in a subsequent Licensee Event Report.

1 9510300150 951024 PDR ADOCK 05000354

'/ ([F

'// lk()

/

S PDR Hr pnerisin y orf tgl..,G03;

\\

_n

s OCT 241995 Document Control Desk Special Report 95-03 v.

Should you have any questions or comments on this transmittal, do not hesitate to contact us.

J Sincerely, j

a M

E.

eddemann ener 1 Manager -

J Hope Creek Operations a

a i

JPP/

C Distribution d

l