Forwards Current Lists of Outstanding & Confirmatory Issues Identified in Draft Ser.Requests Schedule for Submittal of Des,Safety Evaluation for Issues Identified in Generic Ltr 82-33,SER & Rept for Safety Parameter Display Sys
ML20093P155
Person / Time
Site: Beaver Valley
Issue date: 10/31/1984
From: Woolever E
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-4-179, GL-82-33, NUDOCS 8411060160
Download: ML20093P155 (10)


Text

-

o

'Af 4 )78 5141

)92 W O Nuclear Construction Division Telecm W 2) 7s7-2629 Robinson Plaza. Building 2, Suite 210 Pittsburgh, PA 15205 October 31, 1984 United States Nuclear Regulatory Commission Wdshington, DC 20555 ATTENTION:

Mr. George W..Knighton, Chief Licensing Branch 3 Of fice of Nuclear Reactor Regulation 1

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 S.E.R. Outstanding Issues Status Gentlemen:

At tachment 1 is a current list, as of October 15, 1984, which pro-vides our understanding of outstanding issues identified in the draft SER. is a current list, as of October 15, 1984, which provides our unde rs tanding of confirmatory issues identified in the draf t SER.

Items identified as " complete" are those for which responses have been provided and no confirmation of status has yet been received from the staff.

We consider these iteics satisfactorily closed unless notified otherwise.

In order to permit timely resolution of items identified as " complete" which may not be resolved to the staf f's satisfaction, please provide a specific description of the issue which remains to be resolved.

Items identified as "c lo s ed" or " confirmatory" are based upon formal or informal communications or agreements with the staff.

Please inform us of any disagreement of status described on the attached list.

Please provide a schedule. for providing the following items:

Draf t Environmental Statement Safety Evaluation for Issues Identified in Generic Letter 82-33 Safety Evaluation Report Safety Implementation Report for SPDS DUQUESNE LIGHT COMPANY By i

E. 3.

Woolever Vice President GLB/wjs Attachments Mr. H. R. Denton, Director NRR (w/ attachments) cc:

Mr. D. Eisenhut, Director Division of Licensing (w/ attachments)

Ms. M. Ley, Project Manager (w/ attachments)

Mr. T. Novak, Assistant Director Division of Licensing (w/ attachments)

Mr. G. Walton, NRC Resident Inspector (w/ attachments) 1 0

9

AITAQMNr 1 CUISTANDI!C ISSLES PRFOSED OU13T# 01tG RESRN E ISSUE SURIECT DATE STATUS IETIER 10. #0 DATE 1

Ibtential for floodirs fran local inteme precipitation 1

2tRO 4-069, 5/30/84 2

Flooding from Peggs Rm 1

2tRC-4-069, 5/30/84 3

Alequacy of the troposed tedt spec for drought coniitions 4/30/84 Ocmplete 2PR04-0@, 4/30/84 4

Adequacy of intAe structure silt nonitorirg progran 4/30/M Onplete 2?RO-4-0@, 4/30/84 5

Bcmiaries of the Appalachian Platea1 Tectonic Prcvince 4/30/M Ccmplete 2rRO-4-048, 4/27/84 6

Macian earthquake 11/30/84 2

2!RO-4-048 4/27/84 2NRO-4-072,, 6/1/84 7

&amd notion tAirg soil propertis into consideration 11/30/84 2

2!RC-4-048,4/27/84 2 FRO 4-072, 6/1/84 8

Actual earthquake tine histories 11/30/84 2

2 PRO-4-048 4/27/84 2NRO4-072,, 6/1/84 9

Shallow earthquaces 11/30/84 2

2tRC-4-048, 4/27/84 10 Vertical seismic design a celeratiom 11/30/84 2

2?R04-048, 4/27/84 2NRO-4-072, 6/1/84 11 Tornado pressure drop rate calculations 4/30/84 Conplete 2fRC-4-047, 4/27/84 12 Concrete missile barrier desi.tn Complete 2fR04-018, 2/27/84 2NRCr4-024, 3/9/%

13 Site-stecific respnse spectra 4/30/%

Onplete 2rR04-047 4/27/84 2NRO4-072,, 6/1/84 14 Justification of pedc s;reafirg of floor respnse spectra Onplete 2?R04-018, 2/27/84 15 3-conponent seismic input vs. 2-conponert input 6/15/84 Canplete 2rR04-080, 6/15/84 16 Soil-structure interaction analysis of con-taiment ani int &e structure 6/15/84 Onplete 2?RO-4-080, 6/15/84 17 Significance of the couplirg in structural response between nutually orthogpnal axes of structures 6/15/84 Canplete 2 FRO-4-080, 6/15/84 18 mviations of contairment & sign fran AME Cok Section III Division 2 6/15/%

Canplete 2NRO-4-080, 6/15/84 19 Ultimate capacity analysis of contairurent 6/15/84 Onplete 2rRC-4-080, 6/15/84 20 kviations fran requirerents of ACI 3@ code as algpental by Reg. Guide 1.142 4/27/84 Onplete 2rR04-047, 4/27/84 21 Structural audit action items 4/27/84 Complete 2tRC-4-047,4/27/84 22 Affects of cracled panel on dynanic nodelirg ani & sign Gnplete 2?RO-4-018, 2/27/M 23 Meguacy of ra-aawasal anfety factors against sliding ami overturning of contain-nent, mix. buildirg, aal inthe structure 4/30/84 Onplete 2 FRO-4-047, 4/27/M

F '

PHOPOS3)

OLHSTMUDC RESIDEE ISSUE SURIECT IWIE STATUS IETIER M). RO DA'IE 24 Through-vall le& age cracks in nuderate energy lines in containent 5/15/84 Closel 2m04-052, 5/8/%

25 Selection of pastulatal break locatiens 5/15/84 Closed 2mC-4-052,5/8/%

26 Jet impirgenent effects 6/29/84 Confinnatory 22C-4-052 5/8/84 2NR04-097,, 7/2/%

27 Break exclusion zones 5/15/84 confirmatory 2mC-4 052, 5/8/84 28 Pipe-to pipe impact 5/15/84 cmplete 220-4-052,5/8/%

29 Limited breA areas 5/15/84 Closel 2mC-4-05?, 5/8/84 30 Saturated or subcooled water blowdom 5/15/84 Closed 2m04-052, 5/8/84 31 Design of pipe rupture restraints 5/15/84 Closel 2mC-4-052, 5/8/84 32 List of tramierts 5/15/%

cime!

2204-052, 5/8/84 33 location of systens to be nonitoral dtrirg pre-op testirg 6/01/%

Closel 220-4-052, 3/8/%

1 34 Criteria used for detenninirg accepteility of vibration levels 5/04/84 Closel 2NRO-4-052, 5/8/%

33 Vibration nonitoring progran 5/04/84 Closel 2mC-4-052, 5/8/84 36 cmbinirg 3 canponerts of eartiqtnte notion 5/04/84 Closed 2 5 0-4-052, 5/8/84 37 Mxtes incitzied in s eismic analyses 5/15/84 Closel 2mC-4-052, 5/8/84 38 Denomtratirg seismic qtalification 5/15/84 C1mei 22 0-4-052, 5/8/84 39 loadirg cabinatiom, systen operatirg tran-sients, and stress lunits 5/15/84 Caplete 220-4-052, 5/8/84 22 0-4-097, 7/2/84 40 WAC syscan & sign 5/15/84 Confinnatory 2m04-052, 5/8/%

2NRC-4-097, 7/2/84 41 Design of safety armi relief valves 5/15/84 Closed 2mC-4-052, 5/8/84 42 Design ani comtruction of A9E Class 1, 2, arx! 3 component support 5/15/84 Complete 2mC-4-052, 5/8/84 220-4-097, 7/2/%

43 Preservice ani imervice testirg of punps ani valves a--6/%

Complete 2mC-4-096, 6/29/84 220-4-097, 7/2/M b-12/%

c--6/85 44 Effects of rod bow on DNB 6/29/%

Cmplete 2mC-4-102,7/12/84 45 Flow measureneat capability arti procedure 6/29/84 Ccrnplete 22C-4-102, 7/12/84 46 Icose parts detection progran report 6/29/84 Complete 2mC-4-167,10/12/84 47 Ibetsrentation of conplete ICC systen 6/29/%

Couplete 2NR04-102, 7/12/%

48 Preservice inspections progran 6/84 Cmplete 2mC-4-096, 6/29/84 49 Chapliance with Appenlix G 10CFR Part 50 6/29/%

Cmplete 2mO4-049, 4/30/%

50 Ocx::pliance with Apperv'.ix H 10CFR Part 50 4/30/%

Complete 2 2 0-4-049, 4/30/ %

51 Preceure te:perature Ji_1te 4/30/85 Orplete 2NRO4-049, 4/30/84 52 3

P10POSS OlTISTROUD RESK N E ISSE SUMECT DAE STAIUS 1ETIER 10. #0 DATE 53 0)ntrol rmn heiteility 6/01/84 0)nfinnatory 2mH-124, 8/13/84 2NRO4-158,10/3/84 54 Inservice inspection of Class 2 asi 3 couponents a-6/84 c--6/85 55 Design nodification for aitmatic rea tor trip (baplete 2 2 0-4-139, 9/7/84 56 Anticipatory rea tor trip on turbine trip 5/25/84 Closel 2 2 0-4-086 6/20/84 2NRCr4-119,, 8/9/84 57 P-4 interlock Closal 2mC-4-038, 4/10/84 58 1hdetectele failure in online testing cir-cuitry for ergineeral safeguards relays 7/i6/84 Closed 2m04-119, 8/9/84 59 Service water systen ia>1ation on low healer pressure 5/31/84 Canplete 2mC-4-086,6/20/84 2 5 0-4-141, 9/10/84 60 Nonnal letdown lirm relief valve 5/25/84 Closed 2mC-4-086, 6/20/84 61 Switchover fran injection to recirculation 5/11/84 Closai 22 0-4-056, 5/14/84 62 Main feedwater isolation 5/25/84 Closed 2mC-4-086,6/20/84 63 control roon isolation 6/29/84 Canplete 2mcr4-139, 9/7/84 64 Stean generator level control and protection 1

2mC-4-068,5/30/84 65 IE Bulletin 8H)6 concerns 6/29/84 Closai 2m04-112, 7/30/84 66 Indepenience between marual ani aitamatic action 6/29/84 Closal 2ASR-01227, 7/10/84 67 Power lockout for notor-operated valves 1

2mC-4-082,6/15/84 68 Rarote shutdom capability 5/25/84 Complete 2m04-079, 6/13/84 2NRO-4-165,10/11/84 69 Emergency response capability Lic. Condit.

70 Direct inlication of relief arti safety valve p3sitions 5/18/84 Closai 2 2 0-4-064, 5/29/84 2NRO-4-165, 6/13/84 71 Bypass arti iroperable status panel 5/25/84 Oroplete 2m04-079,10/11/84 72 IE Bulletin 79-27 7/02/84 (bnfinnatory 2mC-4-112,7/30/84 73 Reactor coolant systen loop isolation inter-locks 6/29/84 Closed 2 2 0-4-102, 7/12/84 74 Primary canponent cooliog water isolation fran RG thennal bariers 6/29/84 Closal 2m04-167,10/12/84 75 PID controller nodification 6/29/84 Confirmatory 2mC-4-086,6/20/84 76 11igh energy line bre&s arri conseqtential control systen failures 4/27/84 Clasal 2 2 0-4-049, 4/30/84 77 0)ntrol systen failure caused by malfmetions of comon power a>urce or instrtsent line 7/06/%

2 22 0-4-119, 8/9/84 78 Procedure to estimate extent of core danage Confinnatory 2NRO-4-042 4/18/84 2NRCr4-163 10/10/%

79 Ba kup post accident satplirs tirough gre sanples for inlim analyses closal 2m04-042, 4/18/%

190 POSED OUISTAIO1!O

RESPONSE

ISSUE SJRIECT DATE STATUS IETIER 10. AfD DATE 80 Measurirg ratioruclide concentrations Closed 2tRO-4-042, 4/18/84 2NRO-4-163,10/10/84 81 Perfonnance of PASS instrunetation ard analytical procedures Closed 2fRC-4-042 4/18/8 4 2 PRO-4-163 10/10/84 82 Fire hazards analysis 5/15/84 Confirmatory 2fRC-4-063, 5/23/84 83 Fire brigale 5/15/84 Confinnatory 2tRO-4-063, 5/23/84 84 Penetration seals 5/15/84 Closai 2fmC-4-063, 5/23/84 85 Safe slutdom 5

86 Alternate shutdom 5

87 Hydrogen pipirs 5/15/84 Closed 2tRO-4-063, 5/23/84 88 Cable tray suppression 5/15/84 Closed 2fRC-4-063, 5/23/84 89 lbwer supplies for control roon ventilation 5/15/84 5

2rR0+063, 5/23/84 90 Fire detection 5/15/84 0)nfinnatory 2MO-4-063, 5/23/84 91 Valve supervision 5/15/84 Closal 2?R04-063, 5/23/84 92 Reactor coolant pumps ard separation of safety-relatal canponents in containnent 5/15/84 Q)nfinnatory 2?RO-4-063, 5/23/84 93 Control roan canplex 5/15/84 Confirmatory 2fRC-4-063, 5/23/84 94

- C&le sireafirg roon 5/15/84 1

2rRO-4-063, 5/23/84 2NR04-067, 5/30/84 95 Exanption to 10CFR 70.24(a) ani description of alternative to requiral critic ility nonitors 6/01/84 Closel 2?R04-078, 6/13/84 runbers, specifications for portele 96 s,boratory HP istruments 5/15/84 Closal 2!RO-4-078, 6/13/84 la 97 1rainirg/ retraining for health physics pro-fessionals ani verification that contractor trainirg neets 10CFR 19.12 ratuirerents Closai 2tRO-4-078, 6/13/84 98 Procedures generation package /DG I.C.1, short-tenn accident analysts and procedures revision 7

99 Physical security 5/16/84 Complete 2?RC-4-051, 5/M/84 100 Initial test progran 7/03/84 Canplete 2?RO-4-048, 4/27/84 101 Ruliological conseqences of control rod ejecttocDBA 10/19/84 2 FRO-4-153, 9/25/84 10 2 Raliological conseqmnces of a small line bre* DM 5/15/84 Closai 2?R04-109, 7/23/84 103 Raliological consegmnces of a stean gnera-actions an!pture vtm avi review of operator 6/29/84 Omiplete 2NRO-4-086, 6/20/84 tor tube ru systan perfonnance 104 Raliological consequences of a steanline breA outside seconiary containaent Closal 105 Raiiological consegmnces of a loss of coolant DBA 10/19/84 2?RO-4-153, 9/25/84 Im0 POSED OLTIS"'4DI!C RESPONbE IS6LE SUMECT DAIE SIA1US IETIER 10. MD DAIE 1%

Raliological consegmnces of a fwl hanilirg DBA Closed 107 3

106 M Itans II.K.1.5, II,K.1.10, ani II.K.3.17 6/85 109 M Itan II.K.2.13 5

110 M Itan II.K.3.2 5

111 M Itans II.K.3.5, II.K.3.30, aid II.K.3.31 5

112 Technical specifications 9/30/84 02nplete 2m04-144, 9/14/84 113 Detailed control room dedgn review 6/01/85 1 14 Safety paraneter display systen 8/01/84 Couplete 2 2 0-4-115, 8/1/84 115 Snowpack loal on roofs 6/29/84 Complete 2mC-4-112, 7/30/84 116 Entrane tanperatures for site area 6/29/84 Canplete 2mer4-141, 9/10/M 117 Affects of relocation of net, tower 6/29/84 Complete 2NRC-4-079,6/13/84 118 long tenu diffusion estimates 6/29/84 conplete 2 2 0-4-079, 6/13/84 119 Deviations to R.G. 1.52 6/29/84 Complete 22C-4-139,9/7/84 120 (batairunent vacuan systen exhaist iodite ranwal capability 6/29/84 Canplete 2 2 0-4-112, 7/30/84 121 Evaluation of RW5r failure 5

122 Water le& age it.to safety-relatal equipment cubicles 7/02/84 Complete 2NR04-099, 7/2/84 123 Ibstirg of fmetional capability for water-tight seals 7/02/84 Canplete 2 2 0-4-099, 7/2/84 124 Accessibility of int &e structure for safe slutdown 7/02/M Canplete 2 2 0-4-099, 7/2/84 125 Adequacy of water stops for coostruction joints 7/02/84 Canplete 2 2 0-4-121, 8/10/84 126 Floodirg due to failure of non-seismic Category 1 equipment 7/02/84 Canplete 2 2 0-4-099, 7/2/84 127 Fan blaie missile 7/02/84 Complete 2mC-4-099, 7/2/M 128 Missile barrier for turbine driven arciliary feedwater puup missiles 7/02/84 Canplete 2m04-099, 7/2/84 129 Pressurizcd container missiles 7/02/84 Onplete 2mC-4-099, 7/2/84 L30 Thnperature ani gressure sensor missiles 7/02/84 Canplete 7m04-099, 7/2/M 131 Ibrnaio missile pectection for a2xiliary buildirg 7/02/84 Canplete 2

  • 04-099, 7/2/84 132 lbrnaio missile protection of main stean vent panels 7/02/84 Onplete 2204-099, 7/2/84 133 Postulated pipe breaks outside contaioment 7/02/M Canplete 2mC-4-099,7/2/84 134 Fuel pool maximten heat loais 7/02/84 1

22 0-4-085, 6/15/84 135 Light loal handling systen 7/02/84 Ccinplete 2 2 0-4-121, 8/10/84 136 Hanilire of heavy loais 7/02/84 Complete 2NR04-099, 7/2/M

m -

PRDPOSED CUISTRO11C RESR M E ISSE SUHIECT DA1E STATUS LETIER 10. NO DA1E 137 Marine growth in staniby service water systen 7/02/%

Caraplete 2mC-4-099, 7/2/84 138 Verification of instrunent air qtality in canpressed air systens 7/02/84 Canplete 2fR04-099, 7/2/84 139 Equipent ani floor drainage systen 7/02/84 Couplete 2tRC-4-121, 8/10/84 140 (bnfonnance with Regulatory Guide 1.95 7/02/84 0xnplete 2tRO-4499, 7/2/84 141 Confonnance with Regulatory Guide 1.78 7/02/84 Ocuplete 2fRC-4-099, 7/2/%

142 Seimnic Catqrpry 1 requirenents for carr-presaed air systen 7/02/84 Couplete 2 FRO 4-099, 7/2/%

14 3 Environental qtalification ani a cessibility of essential equipent housed in fuel buildirg 7/02/84 Carplete 2 FRO-4-099, 7/2/84 144 Safety classification of notor control certers 7/02/84 Canplete 2 FRO 4-099, 7/2/84 145 Air exha2st rafiological nonitorirg systen 7/02/%

Canplete 2 FRO-4-121, 8/10/84 146 Protection of energency saitchgear toon vertilation systen 7/02/84 Canplete 2tR04-099, 7/2/84 147 Supplementary leak collection ani release systen requireents for safe slutdown 7/02/84 Canplete 2 FRO 4-099, 7/2/84 148 Water hamer test of cordensate anl fealuater systen 7/02/84 Canplete 2?R04-121, 8/10/84 149 Auxiliary feedwater systen, TML lten 11.E.1.1 7/02/84 Conplete 2tRC-4499, 7/2/84 150 Seianic qtalification of equipnert 7/16/84 Canplete 2tR04-118, 8/5/%

151 Pmp ani valve operability assura1ce progran 7/16/84 Ocuplete 2?RC-4-118, 8/5/84 152 Bwironnental qualification of equipnent Confinnatory 2RO-3-096,12/5/83 153 Analysis of conbined loCA an! seisnic loais 7/16/84 Canplete 2 FRO-4-141, 9/10/84 15 4 Testing ani irspction of new fuel 7/16/84 Closal 2ASR-01280, 8/8/84 155 01-line detection netrod to.ronitor ftel rod failures 7/16/84 Canplete 2tR04-139, 9/7/84 156 thderclad crackirg of forgirgs in rea-tor vessel 7/16/84 Canplete 2 RO-4-120, 8/10/84 157 Review of structures, systens, ani coupnents under Quality Assurance Pragran 5

158 luW setpoint valtes 7/16/84 Complete 2tRC-4-122, 8/10/84 159 RIR operation requirenents outside control roon 7/16/84 Canplete 2?RO-4-122, 8/10/84 160' IGIR overpressure protection systen 7/16/84 Canplete 2tRC-4-122, 8/10/%

161 Q2alification of RHR pmps inside contaimrent 7/16/84 Canplete 2tRO4-122, 8/10/84 162 Natural circulation test 7/16/84 Conplete 2tRC-4-122,S/10/84 163 Prq;rans ani promdtres for containnent sep operation 7/16/84 Canplete 2NR04-122, 8/10/84 1%

Review of off site e=ron:y plans UD'e 5

165 Orr-site energency planning 7/23/%

Casplete 2;RO4-130, 8/31/84

e.-

ISOPOSID CLTISEANDDC RESPONEE ISSUE SUBJECT DAE STATUS IETIER 10. AND DAE 166 Barcreteric tressure for containent & pres-surization analysis 7/16/84 Ccraplete 2m04-132, 8/22/M 167 Mass ani energy release analysis 7/16/84 Complete 2NRC-4-132,8/22/84 168 Subconpartment analysis (restor cavity, stean generator ani pressurizer) 7/16/M Grnplete 2NRG-4-132, 8/22/84 169 Contaiment sump design 7/16/84 Ccraplete 2NRC-4-132,8/22/84 170 lbst-accident hydrogen nonitorirg systen 7/16/84 Caraplete 2NR04-132, 8/22/84 171 Type C testing exclusion of valves 7/16/84 Complete 2NRC-4-132, 8/22/M 172 Torgitudinal sections ani paramters of Category I burial pipelines 7/16/84 Complete 2NR04-136, 8/31/84 173 Stability analysis 8/31/84 cxplete 2mC-4-126, 8/17/84 174 Fomdation data for main int &e structure 7/16/84 Graplete 2NRO-4-147, 9/18/%

175 masural, estimatal ani allomble settlemnt data 12/85 Graplete 2NRO-4-159,10/3/84 176 Differential settlemnts 2/86 8

2NRO-4-159,10/3/%

177 Settlement nonitorirg progran 7/09/%

Graplete 2NR04-117, 8/8/84 178 Densification of soils 8/31/84 Complete 2NRC-4-146, 9/14/84 179 Soil danping valves 8/31/84 Camplete 2NRO-4-133, 8/24/84 180 Soils effective strength paramters 7/25/84 Complete 2NRC-4-114,8/1/84 181 Accurry of SIIES progran 7/25/84 Q2nplete 2NR04-114, 8/1/M 182 offaite power systans Ccinplete 2NR04-140 7/84 2NRO-4-150 20/M 183 Indepenieme letween offsite ani omite pwer sources Graplete 2NR04-140, 9/7/84 1M Automatic loal tap cha1ger Complete 2NRC-4-150,9/20/84 185 Testirs of offsite pwer transfer Graplete 2NRO-4-150, 9/20/84 186 Voltage analysis for safety-related loais 0xplete 2NRC-4-140,9/7/84 187 Diesel generator testirg Q2nplete 2NRO-4-140, 9/7/84 188 Compliance with B1P-PS&-2 Complete 2mC-4-150, 9/20/84 189 Diesel generator loalirg Canplete 2NR04-150, 9/20/84 190 Compliance with IEEE Staniard 387-1977 Complete 2mC-4-150, 9/20/%

191 Ibwer remval for selectai safety valves Graplete 2NR04-140, 9/7/84 192 Automatic reclosure of breders after manual trip G2nplete 2NR04-140, 9/7/84 193 Replacemnts for Class IE loads Complete 2NRC-4-140, 9/7/M 1%

Accident loalirg capacity of the diesel generator Qinplete 2NR04-140, 9/7/84 195 Connectirg naMlass IE loals with Class IE Ic_ds Qinplete 2NR04-140, 9/7/M 196 Oxnp11ance with GDC 2 ani 4 Q2nplete 2NRG4-140,9/7/84 2NRO-4-162,10/10/84

m..

PKFOSID OLTISTMODU IES10 TEE ISa1E SURIECT DATE SIA1US IETIER M). #D DATE_

197 Compliance with GDC 17 2

2tRC-4-140, 9/7/84 198 Electrical irdeperdence between power supplies Canplete 2tR04-150, 9/20/%

199 Compliance with GDC 50 Camplete 2!EC-4-150,9/20/84 200 Infonnation on evaluations of inlividual events 7/16/84 Canplete 2tRO 4-122, 8/10/84 201 Turbine trip event 7/16/84 Complete 2fRC-4-122, 8/10/84 202 Hea: tor coolant pmp rotor seizure 7/16/M Canplete 2fR04-122, 8/10/84 203 Inalvertait boron dilution during refueling 7/16/84 Cmplete 2fRC-4-122,8/10/84 tCIES:

IFiled as a backfit under Generic Imtter 84-08 2Supplenental subnittal to be prwided 3tbt provided in draft SEC 4aesp3mes have been infonnally trammittal to the reviewer SStaff action only 6A necting with the PRC Reviewirg Brandi is reluired before respome can be finalized 7tb response required BDif has regtestal confirraatory status for this item I PIOGRAM FiO DLRES 10R VALVES & PtWS cygg pioggjg

ATTA0MNr 2 (DiF11MAIORf ISSLES OUISTANDIN; ISSUE RIBJECT STATUS 1ETIER 10. NO DATE 1

Operatirg basis earthqmke 2

2?RO 4-047, 27/M 2?RO-4-072, 1/84 2NR04-048, 27 /84 2

Stress an! strain levels of key structural elenents Complete 2?RC-4-047, 4/27/84 3

Floor response spectra accatntirg for han;nnert earth-quake irput 02nplete 2tRO-4-080, 6/15/84 4

1 5

Examination of stean spnerators 6

1 7

Main W isolation 8

CR isolation on high raliation signal 9

Automatic openirg of service water system valves 10 Accident nonitoring instrtnentation positions 11 Cold leg acctmulator POV position indication source, ani special ruclear Table 1.9-2 by product,im nonths prior to fuel loading 12 material descriptions n Q' 71.14B

+

13 Verification that cobalt use in primary system has been minimized Q471.10 Closed 2?RO-4-078, 6/13/84 14 0)ntairnert h' rarge raliation nonitors six nonths prior to ftet its $71.14a Closed 2?RO-4-078, 6/13/84 15 Verify that 106 airborne radioactivity nonitors Closed 2fRC-4-078, 6/13/%

16 quality assurance trogran ratuirenents closel 2?RO-4-078, 6/13/84 17 Peak pellet design basis 18 Specification of ftel paraneters 19 Rod bowirg analysis 20 Fuel rad internal ressure t

21 Claiding collapse tine 22 Use of a2stenitic stainless steels Quplete 2?R04-120, 8/10/84 IPbt provided in Draft SER 2Supplemental subnittal in be trcuided