W.
3.23 REACTOR BUILDING PURGE. VALVES e
APPLICABILITY This specification applies to the reactor building purge supply and exhaust isolation valves.
OBJECTIVE To specify'that reactor building isolation purge valves be closed whenever containment integrity is required by TS 3.6.1.
SPECIFICATION 3.23.1 The reactor building purge supply and exhaust isolation valves shall be closed and hancswitch keys removed whenever containment integrity is required by TS 3.6.1.
BASES The reactor building supply and exhaust isolation valves are required to be closed during normal plant operation in order to ensure reactor building integrity.
Purging is allowed only when containment integrity is not required by TS3.6.1.
' Amendment No. 55 66t-
~
~
8410190190 841016-PDR ADOCK 05000313 P
.=
7--
CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.6
,The' containment purge supply and exhaust isolation valves shall be closed and handswitch keys removed.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
.With one containment purge supply and/or exhaust isolation valve open, close the open valve (s) with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and-in C0LD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS 4.6.1.6 The containment purge supply and exhaust isolation valves shall be determined closed at least once'per 31 days.
ARKANSAS - UNIT 2 3/4 6-9a