ML20093L263

From kanterella
Jump to navigation Jump to search
Provides Suppl to 950901 Proposed Revs to TS 6.9.1.9 Re Listings of Core Operating Limit Methodologies,Per Discussions W/Nrc
ML20093L263
Person / Time
Site: Mcguire, Catawba, McGuire  
Issue date: 10/17/1995
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093L266 List:
References
NUDOCS 9510250277
Download: ML20093L263 (2)


Text

II l

DukeIbwerCompany M i Tlaata P.O. Box 1006 Senior Vice President Otarlotte, NC2820H006 huclear Generation (7T+03822MOffice (704)3824360 Fax k

DUKEPOWER October 17,1995 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Subject:

McGuire Nuclear Station Docket Numbers 50-369 and -370 Catawba Nuclear Station Docket Numbers 50-413 and -414 Revisions to Technical Specification Listings of Core Operating Limit Methodologies; Supplement By letter dated September 1,1995, Duke Power Company submitted pmposed revisions to Technical Specification 6.9.1.9 for McGuire and Catawba Nuclear Stations, which will reference updated or recently approved methodologies used to calculate cycle-specific limits contained in the Core Operating Limits Report. Discussions with the NRC staffidentified discrepancies in two of the topical report identifiers. In addition, for Catawba, amendment numbers 134 (Unit 1) and 128 (Unit 2), issued August 31,1995, resulted to a change to one of the pages provided in the September 1,1995 submittal. Therefore, new originals are hereby provided for the affected pages.

If there are any questions, or more information is needed, please call Scott Gewehr at (704) 382 7581.

Very truly yours,

, S-M. S. Tuckman

' C C l' j 1

klo<

o 9510250277 951017 f -

PDR ADOCK 05000369 P

PDR n\\

1

3 U. S. Nuclear Regulatory Commission October 17,1995 Page 2 cc:

Mr. V. Nerses, Project Manager Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D. C. 20555 Mr. R. E. Martin, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D. C. 20555 Stuart D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr. G. F. Maxwell Senior Resident Inspector McGuire Nuclear Station i

Mr. R. J. Freudenberger i

Senior Resident Inspector Catawba Nuclear Station i

4 i