ML20093H981

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-82 Re Improper Bend Radius in Diesel Generator Control Cabinets.Initially Reported on 831202.Final Rept Expected by 840810
ML20093H981
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/12/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29942-TDS, DER-83-82, NUDOCS 8407250454
Download: ML20093H981 (2)


Text

.

.s Arizona Public Service Company g.

illlC ~

7 July 12,1984 ANPP-29942-TDS/TRB U. S. Nuclear Regulatory Commission

S Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Waluut Creek, CA 94596-5368

' Attention: Mr. T. W. Bishop, Director Division of Resident l

Reactor Projects and Engineering Programs

Subject:

Time Extenolon For Report - DER 83-82 A 50.55(e) Potentially Reportable Deficiency Relating To Improper Bend Radius In Unit 1 And 2 DG Control Cabinets.

File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Gage and K. Parrish on December 2, 1983 l

(B) ANPP-28528, dated January 3, 1984 (Interim Report)

(C) ANPP-28919, dated February 22, 1984 (Time Extension)

(D) ANPP-29348, dated April 24, 1984 (Time Extension)

(E) ANPP-29626, dated May 31, 1984 (Time Extension)

Dear-Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and Time Extensions were requested by References (C), (D), and (E). At that time, it was estimated that a Final Report would be available by July 15,1984.

A Final Report has been submitted to APS for review. It is expected that the review will be complete and a report transmitted to the NRC by August 10, 1984.

Very truly yours, CLU Ndj E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:db cc: See Page Two 8407250454 B*0712 PDR ADOCK 05000528

)jQ ((- j[

S PDR

er Mr. T. W. Bishop DER 83-82 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Facnacht A.

C,. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Singham R. L. Pa tterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. ::Immerman S. R. Frost J. Self D. Canady T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339

._ _