ML20093G118

From kanterella
Jump to navigation Jump to search
Informs Commissioners of Exam & Licensing Activities for Reactor Operators & Senior Reactor Operators,Including Requalification Exam Results for Third Quarter FY84
ML20093G118
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/14/1984
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20093G104 List:
References
TASK-PII, TASK-SE SECY-84-081B, SECY-84-81B, NUDOCS 8410150361
Download: ML20093G118 (25)


Text

,

t

' t.

  1. ~%

f E

o l

a o.....*

POLICY ISSUE (Information)

August 14, 1984 S ECY-84-81 R For:'

The Commissioners From:

William J. Dircks Executive Director for Operations

Subject:

RESULTS OF OPERATOR LICENSING EXAMINATIONS AND REQUALIFICATION EXAMINATIONS FOR THIRD QUARTER FY 1984

Purpose:

To infonn the Comissioners of examination and licensing

's activities for Reactor Operators and Senior Reactor Operators, including requalification examination results.

Discussion: The enclosed tables report licensing action results, including issuances, denials or withdrawals and pass / fail rate for each NRC licensing examination component. The results are presented as a combined total a'nd broken down by region. We have also included a graph sumarizing the examination results by region for this quarter.

It shows the percentage pass rate by license and exam type and the total number of exams given broken down by region. We continue to see variations in the percentages in the individual categories of the Regions; however, these I

variations reflect the impact of small sample sizes when one test administration results in a large failure rate. We are continuing to track trends in examination results by region l

and have not identified statistically significant trends that are not explained.

Also included are tables shcwing the evaluations of the requalification examinations given for the third quarter FY 1984. All final requalification program evaluations have been satisfactory.

In the instances where the regions have l

l

Contact:

Bruce A. Boger, NRR X24868 f.

8410150361 841004 PDR ADOCK 05000289 O

PDR c--e-wmepg*sp)*-+ea WY-'a~

&-m.-

m Wf d -4 h -

- -..q.

m-

The Commissioners accepted the utility's corrective action program, the issuance of renewal licenses will be contingent upon completion of the utility's upgraded program.

l William J. Dfrcks Executive Director for Operations

Enclosures:

1.

Operator Licensing Tracking System Quarterly Status Report (Examination Results and Licensing Actions) - Total (All Regions) for Third Quarter FY 1984 2.

Operator Licensing Tracking System Quarterly Status Report (Examination Results ar.d Licensing Actions) for Regions I'through V for Third Quarter FY 1984 3.

Graph of Exam Results - Percentage Pass vs.

Exam Type - Third Quarter FY 1984 4.

Requalification Examinatien Results for Regions I through Region V for Third Quarter FY 1984 m

l 5

e l

9 O

h 9

e ENCIDSURE 1 O

ehe

IUDAL (ALL REGI(NE)

OPERATOR LICEHSING TRACKIHG SYSTEM 3rd QLr IT 84 F 236315 ACTIVITY STATUS REPORT 1

3T E: 08/95/84 et/oi/84 THROUGH e6/30/84 IlXAMINATION llliSulJS TOTAL SINULATOR BPASS jfAll JE&lji BFAIL 1AKEH ORAL HRITTEH IPASS IEF t.L 195 35 /

2 93 /

9 INITIAL - RD 83 /

22 94.6% /

5.4%

91.2% /

8.8%

49 /

13 128 79.0% / 21.0%

109 /

11 79.0% / 21.0%

SRO 102 /

19 84.3% / f5.7%

90.8% /

9.2%

13 t /

8 5 /

0

! APPLICATIONS - RD 5 /

4 100.0% /

e.0%

Ids.0% /

8.0%

15 3 /

0 55.6% / 44.4%

6 /

0 100.0% /

8.0%

ISO.J% /

O.0%

SRU 7 /

6 53.8% / 46.2%

34 8 /

f 28

/"e 1

22 /

ff 88.9% / 11.1%

96.6% /

3.4%

UPGRADE - SRO 66.7% / 33.3%

118 36 /

2 98../

9 91.6%'/

8.4%

14.7% /

5.3%

TOTAL - RO 88 /

26 61 /

14 17e 77.2% / 22.8%

143 /

12 92.3% /

7.7%

8 8.1% / 18.9%

SRO 131 /

36 78.4% / 28.6%

e e

e e

(All. REGIW6 1236315 OPERATOR I.ICEHSING TRACKING SYSTEM 7,.d g., g. 3:y g.

ACTIVI1Y STATUS REPORT (T E8 J

88/03/84 04/6 t/84 TilROUGH 86/30/84 I.lCI!NSING ACTIONS

=

t BISSUED EDEHIED GWITHDRAWN IMITIAL -

RO -

91 32 13 SRO -

92 37 12 IHST CERT -

23 8

3 LTD SRO -

0 0

9 REArrLICATIONS -

RO -

20 4

1 SRO -

16 8

8 INST CERT -

t 8

8 LTD SRO -

0 0

8 UrGRADE -

SRO -

39

  • 24 3

TOTAL -

RD -

til 36 14 IHST CERI -

24 69 16 SRO -

147 8

3 LTD SRO -

0 0

0 RENEWAL -

RO -

107 0

0 SRO -

201 0

0 INST CERT -

0 0

0 LTD SRO -

2 8

0 9

g

. a )

r g...

o f

e t

k

)

i i

e a

scwscas 2 Y'

f O

9 g

-y.e Fe-

,%er wa-pr-P

    • N"'

__,..7,-,-,ww==--e*e-N**""'

gp9 9,, ' g 3

OPERATOR LICEH51H31 RACKING SYSTEM

,R-1236315

  • ACTIVITY STATUS REPORT 3nt Qtr FY M

.DATE: 98/03/84 e4/et/84 TilROUGH 86/30/84 llXMilNNI'10N Rl'Sul!!S i

TOTAL SIMULATSR IPA 55 SFAIL IPA 55 SFAIL EAlft 1MLL 1AKH ORAL WRITTEN INITIAL - RO 24 /

5 26 /

1 ft

/

8 29 82.8% / 17.2%

96.3% / 3.7%

108.8% / 9.9%

42 j

SRO 35 /

7 39 /

3 20 /

4 83.3% / 16.7%

92.9% /

7.1%

83.3% / 16.7%

3 l

8 /

O

!. REAPPLICATIONS - RO 2 /

9 t /

0 190.0% /

0.0%

100.0% /

S.0%

0.0% /

4.0%

5 SRO 3 /

2 2 /

O O /

9 100.0% /

O.OX 4.0% /. 0.0%

i 60.0% / 40.0%

14 l

8 /

8 10 /

4 II (

0

\\

100.0% /

9.0%

0.0% /

9.9%

UPGRADE - SRO j

71.4% / 28.6%

1 26 /

5 27 /

I 11 /

O 32 3

83.9% / 16.1%

16 4% /

3.6%

100.0% /

4.8%

J TOTAL - RO SRO 48 /

13 52 /

3 28 /

4 61 i

78.7% / 21.3%

94.5% /

5.5%

83.3% / 16.7%

i i

i i

i I

l i

i j

i i

i 1

i

neusme OPERA 1ER LICEHSIHG 1RACKIllG SYSTEM 1236315 ACTIVITY STATUS REPORT 3rd Qtr IY H 1Es 98/03/84 e4/el/84 THROUGH e6/3e/ag LICENSING ACr10NS II55UED BDEMIER OWilllDlt AWii INITIAL -

RO -

34 13 5

SRO -

43 13 2

INST CERT -

10 2

0 LTD SRO -

8-0 0

REAPPLICATIONS -

RO -

2 0

t SRO -

3 2

9 INST CERT -

0 0

0 LTD SRO -

,8 0

e UPORADE -

SRO -

4 5

8 TOTAL -

RO 36 13 6

SRO -

60 28 2

INST CERT -

10 2

0 LTD SRO -

0 0

0 REHEWAL -

RO -

48 0

8 SRO -

77 0

0 INST CERT -

0 0

0 LTD SRO -

0 0

8 i

k.

e e

UPERATOR LICEH51HG 1RACKIllG SYSTEM 3,; ;

. g,7 g, 1236315 ACliVITY STATUS REPORT TE 98/03/84 e4/os/84 TilROUGH 06/30/84 liXMilNKrION RilSill!!'S l

1 l

TOTAL SIMULATOR ORAL IPA 55 RFAIL

.IPASS

.IIAIL IPA 55 SFAIL T AKEtt WRITTEN INITIAL - RD 19 /

5 28 /

3 5 /

I 24 87.8% / 13.0X 83.3% / 16.7%

27 /

8 29 /

5 6 /

0 35 79.2X / 20.8%

i SRO 77.1X / 22.9%

85.3% / 14.7X 100.8% /

9.0X 1 /

0 3

'GEAPPLICATIONS - R0 1 /

9 2 /

3 100.0X /

0.0%

100.4% /

S.0X 100.8% /

8.0X 1

l I /

0-1 /

8 tes.eX / s.sX tes.eX /

e.oX tes.sX / e.eX

'l SRO I /

8 6 /

1 3 /

1 7

14.3X / 85.7%

85.7X / 14.3%

75.8X / 25.0X 1 /

6 l

UPGRADE - SRO 1

6 /

I 27 20 /

5 22 /

3 80.0X / 20.0%

88.0X / 12.0X 85.7X / 14.3%

TOTAL - RO SRO 29 /

14 36 /

6 10 /

1 43 j

67.4% / 32.6%

85.7X / 14.3X 98.9X /

9.1X

])

i 1

4 i

i i

j j

i 1

fley' lott 11 CPERATOR LICEHSIllo 1 RACKING SYSIEtt F1236315 ACIfVITY STAIUS REPORT 381I @ l. N I JT E: 88/03/84 04/01/89 1HROUGH 06/30/84 I,1CINSING ACrl0NS IISSUED ODEMIf.D 0 WITHDRAWN

~

INITIAL -

RO -

22 5

4 SRO -

19 14 I

IMST CERT -

6 1

0 LTD SRO -

0 0

0 REAPPLICATIONS -

RD -

2 0

0 SRO -

1 0

0 IHST CERT -

1 0

0 LTD SR9 -

0 0

0 UPGRADE -

SRO -

6 7

2 TOTAL -

RO -

24 5

4 SRO -

26 21 3

INST CERT r 7

8 1

0 LTD SRO'-

0 0

0

~

REHEWAL -

RO -

25 0

0 SRO -

34 0

0 INST CERT -

0 0

0 LTD SRO -

0 0

0 h

e i

e

I H

Y i :

i I

1 LH r

AE 2 6 3 2 5

5 3

1 1

l t

TK 1

l oQ OA TJ 1

J d e

r H 3 L

X %

X

% X I 8010 0000 00 0017 RA Of 0

5 0

0 0

0 6

1 TA 2

A L

//// //// // ////

UM IS 6030 00t0 t0 6053 SSA 0

5 0

0 0

0 3

P 0

7 0

0 0

8 O

1 1

1 1

M E

T S

L

% X X %

17. t 1 Y

I I3I7 0000 00 S

4 A

8 F

8 6 0

0 0

7 1

1 GT/

O 1

NR0 5

L A

//// ////* // ////

IO3 1l KP/

R CE6 u

O

% 4 l

AR0 S

S 1753 1000 30 2389 1

S 1

R E

A 1

3 0

0 0

2 8 l

ISiUG P

9 8 0

0 9

8 I

1 1

O GTU N

NAO O

ITR I

SSH T

H T

A EY N

CT4 I

II8 M

LV/

A I8 X

RT0 i

l OC/

TA4 A

8 R

L X X X %

E I

2780 2000 10 4617 P

A D

F 6

O 0

0 0

8 7 NO 1

0 2

2 1

E T

//// //// // ////

T I

% X X

23 R$

0360 O920 40 04.1 1

WS 1

A 3

0 0

0 0

1 2

P 8

0 0

8 7 9 O

1 1

~

O O O O O

O O R R R R R

R R S

S S

S L

S E

L A

N D

A I

O A

T g

g T

I R

O I

T G

T

/

3 N

A P

0 I

C U

I 5/

L 18 P

30 P

6 A

3t E

2E R

1ib

,j-j ; difj4fil f Iii li!i!l.

UPER ATOR Li*cEllSIHG IRALK1 tit' SYS T Eli

., f ', QIr IY 84 ACTIVIIY STATUS REPORT 1236315 (TE8,98/93/84 54/9 t/89 TilROUGil 06/30/84

)

1,1GNSING ACr10NS IISSUED IDillLED SWIIllDRAWH

~

IHITIAL -

RO -

14 4

2 SRO -

11 2

3 INST CERT -

4 5

8 LTD SRO -

0 0

0 RO -

7 2

8 SRO -

5 t

1 REAPPLICATIONS -

INST CERT -

0 0

0 LTD SRO -

0 0

0 UPGRADE -

SRO -

4 3

0 TOTAL -

RO -

21 6

2 SRO -

20 6

4

  • 5 0

INST CERT 4

LTD SRO 8

8 8

REHEWAL -

RO -

22 9

O SRO -

51 0

9 INST CERT -

8 8

8 LTD SRO -

0 0

0 4

G O

8 YF LM AE 3 0 4 5 t

7 6 i

1 3

L 1

3 TK

. Q_

OA i

T1 n

3 I

L X %

x %

8 e.4 8 00 I

9049 0 e. O 0 RA OF 9

0 e

0 5

e 0

2 TO 2

A L

//// //// // ////

UM X %

X %

4 e. 6 8 68 Oe00 60 I5 40.1 1

S5A 0

8 e

0 0

s 9

s 8

.P 9

8 i

.B 1

H.

1 1

Y L

5 O008 00 2300 24.O0 S

4 I

8 A

GT/

F 5

8 e

0 9

4 e 1

NR8 8

1 S

IO3 L

////, // ////

KP/

l A

////

l l

CE6 R

AR0 U

O X %

I9 2730 16.3 I e. 2 0 S

5 08

'1 3

R i

1 TSl t

5 i

l A

4 8

s 0

0 5

0 i

UG 3TU P

8 0

e 0

0 8

0 1

1 t

1 1

HAO N

B ITR O

l I

SSl

'I N

1 N

EY CT4 N

1 II8 1

LV/

M I1 RT0 X

i OC/

l TA4 A

8 E

L X %

R O0 7261 P

I 5527 2 e. 4 8 O

A F

8 6

e 9

8 s

7 NR 3

5 8 4

1 E

T

//// //// // ////

I T

98 99 R5 8583 2 e.18 08.2 1

W5 2

A 1

3 0

0 8

8 2 P

6 9 5 2 5 8 B

O' O

O O O

D O R R R R R

R R S

S S

S L

S E

L A

N D

A 4

8 I

O A

T

/

T I

R O

3 I

T G

T 0

N A

P 5/

I C

U 18 I

39 L

6 P

38 P

2E A

1T E

A R

RD ;

,I!!I i;!1i!!l:ll!iilll]

!1'

!l!k1 ij!

l1i e

1 l

1

.-3.-.....

OrtRAIUR I.ICEllSING 1 RACKING SYSIEH r1236315 ACIIV11Y STATUS REPORI 3ni Qt r I;Y fi4 ST E: 08/03/84 04/01/84 illROUGil 06/30/84 1,1 CENSING ACI'10NS SISSUER EDEHIED SW11tIDR&Wti INITIAL -

RO -

6 4

2 SRO -

16 8

6 INST CERT -

1 0

0 LTD SRO -

0 0

0 O

RO -

9 1

REAPPLICATIONS -

SRO -

2 4

0 JHST CERT -

0 0

0 LTD SRO -

0 0

0 UPGRADE -

SRO -

12 9

0 TOTAL -

RO -

15 5

2 SRO -

30 21 6

0 0

IHST CERT -

1 LTD SRO -

0 0

0 e

REHEWAL -

RO -

6 0

0 SRO -

15 0

0 INST CERT -

0 0

0 0

0 LTD SRO -

2 i

e e

OPERA 10R LICENSING TRACK 1HG SYSTEN DATE8 88/03/84 ACTIVITY STATUS REPORT 3rd QLr i:Y 84 R-1236315 84/01/84 THROUGH 86/30/84 i,

11XMlINNFION RFSIL*lli i

1 h

i I

WRITTEH ORAL SIMULATOR TOTAL Jr'A55 0 FAIL EAM OFAIL GPASS

.tfAIL T AKEll 25 /

2 9 /

1 27 IMITIAL - RO 22 /

5 81.5X / 18.5X 92.6X / 7.4X 10.0% / 10.84 1

SRO 6 /

2 6 /

2 4 /

4 8

75.0% / 25.0X 75.9% / 25.0%

59.8% / 50.0%

REAPPLICATIONS - RO O /

8 0 /

0 0 /

0 8

0.8% /

O.0%

0.0% /

0.0%

8.0% /

0.0%

~

SRO O /

0 t /

0 1 /

0 2

9.0% /

0.8%

100.OX./

O.0%

100.8% /

3.0%

UPGRADE - SRO 7 /

0 7 /

0 4 /

9 7

ise.ex / o.ex tes.ex / e.ox tes.e% / e.ex t

TOTAL - RO 22 /

5 2'5

/

2 9 /

1 27 81.5% / 18.5%

12.6% / 7.4%

90.0% / 10.0%

SRO 13 /

2 14 /

2 9 /-

4 17 l

j 86.7X / 13.3%

87.5% / 12.5%

69.2% / 3C.8%

l j

i i

4 I

l j

l{eg oin y j

OPERATOR LICEllSIHO TRACKIHG SYS1EM i

ACTIVITY STATUS REPORT 3rd Qtr 1:Y 84 P1236315 94/05/84 THROUGli 86/3e/84 BTE: 98/03/84 1,1Cl!NSING ACr10N.S IISSUED ODENIED RITHDRAWM IMITIAL -

RO -

15 6

0 SRO -

3 0

0 IHST CERT -

2 0

3 LTD SRO -

0 0

0 REAPPLICATIONS -

RO -

O I

O SRO -

5 1

0 INST CERT -

0 0

0 LTD SRO -

0 6

8 UPGRADE -

SRO -

3 8

1 TOTAL -

RO -

15 7

O SRO -

18 l

I INST CERT -

2 e

8 3

LTD SRO -

0 0

8

?

REMEWAL -

RO -

6 8

0 SRO -

15 0

0 IHST CERT -

0 0

0 LTD SRO -

O 8

8 I

O e

I

n 1..-

f'.

k e

N 5

i ENCLOSUPI 3 S

1 4

e i

s i

1 i

a I

a

?

f 3

I

_6,_

~ - - ~ -, - - -..,,...

LXAH RL%L :

PERCL%IAGE PASS VS. EXAH TYPE.

TillR0 QUARTER FY 1984 REGION III i

REGION II REGION 1

-y 100 - -

100 100

-.-,s,.

.w w

I, y

a 80 m

v =g:

W...; :-

go

/:yg; go ~ ~,-

m 5:'. :- '. ', ' id 60

.9. %;!i.::::t-60

k::

+$:

60

,.s.

. 4:

/,.. ;.

'. ~

,r siLii

s :

. :<,<: MR::,: ' ::i

?

g 40

..i:.

40

'.^X.,? E PASS s

r:;i?,

. f.'.

..s..-

..$. ui

., ;,sy

d..

40 -

..j,,.yj;,

.\\.

.;.\\.

x:

/,/. ;,

e.

.;g,.

gg ai,i,;

.f

~-

<u

' u'.*

20

r,:

., ' ~,:

. ~..,

i, s.

.. m:

20 -.,..i w..

0 '(

,.k,.':.,slc,.

,;q:.','. t

/

... - n::m

.\\.

a0:'r N '.%

iji,

..c

., /,

' ' ', '-Q: '. i,f,::.'

. /.. - a...

g.,.,, a.n.9:

(13) 9) (6) 0 -(14) (13) (6)

(

v,

, :,..a..-

t J

. )- ( 7 )- - - -

(43) (42)(11) e o

25) (25 SRO 0 (31) (2'8) (11)

(61) (5'5)(24) 1 SR0 R0 i

SR0 R0 f

R0 1

l 4

4 T

4 REGION V t

REGION IV 100 100 l.'.JI WRI I TEN

$.;w,((. ' "."Ji.

4

7...-:'..'

i 80

.:q::.. ;. :

l' '~j ORAL 80

.g.,-

. 4.,;..

...s.....

.:Q:.

['.Ql SIMULATOR 60..., ^ '.

$. ; M;,.r e.f

.v.

sc.

60 c' -

~

,e..

a. m.:

, ~0..

v m

,./..

PASS

.s u..n.r:::

v. W., '

,5

  • w ' a=:::-

40

/.-

40 QQ, Numbers in parentheses

.t..

. 'i!{

indicate total candidates

e
5-20 1

20 5

h'
:.:f.3 taking exam.
<:- c:0
i,B, -

.a

97.

.u

.-:, v 0 (17) (14) (4)

(35)(33)(20).

g (277Q7}110)

(ld (l'6)(13) 1..

=

R0 '

SR0 R0 SR0

O e

06 e

9 e

e e

1 4

O ENCESURE 4 W

e 4

e

.g REQUALIFICATION EXN41 NATIONS Third Quarter FY 1984 Region I Evaluation Facility Ginna Satisfactory.

Requalification program has been completed and Region I issued an Inspection Report for entire requal-ification program.

Issuance of renewal licenses is contingent upon completion of upgraded program.

l f

I

REQUALIFICATION EXAMIflATIONS Third Quarter FY 1984 Region II Facility Results No exams given.

G a

O e

SID b -

REQUALIFICATION EXAMINATIONS Third Quarter FY 1984 Region III Evaluation Facility Satisfactory.

Big Rock D. C. Cook Evaluation in progress.

Results wil's be reported next quarter.

Dresden Satisfactory T2tisfactory.

Region III participated Kewaunee in requalification written exam.

i Prairie Island

' Satisfactory.

Althcugh some lenient grading was observed, it did not affect overall pass / fail results.

Region III will review the grading of the next requalification written exam.

W

- - - - - _ ~ _ _ _ _ _ _ _ _ _ _ _. _

. o REQUALIFICATION EXAtilNATIONS Third Quarter PY 1984 Region IV Facility Evaluation Arkansas 1 Satisfactory.

Region IV administered two categories on one R0 and five SR0 written exams plus gave complete orals to two R0's and four SR0's.

Arkansas 2 Satisfactory.

Region IV administered cne category on R0 and SR0 written exams and gave six orals.

All passed.

Cooper Satisfactory.

Region IV administered two R0 and four SR0 written and oral exams. The results were marginal and required utility response for improvement.

Region IV has accepted the utility's corrective action program.

Renewal licenses will be issued contingent upon completion of this upgraded program.

  • j

- 'l -

REQUALIFICATION EXAMINATIONS

.g Third Quarter FY 1984 Region V Evaluation Facility i

Rancho Seco Evaluation in progress.

Results will be reported next quarter.

- San.Caofre 2 & 3 Evaluation in progress.

Initial findings were marginal.

Utility is submitting proposed corrective action program.

Results will reported when program is received and evaluated.

Trojan (valuation in progress. Region V has accepted utility's corrective action program wherein utility has agreed to upgrade their accelerated retraining, remedial training and requalification program by August 31, 1984. Results will be reported when the revised program is received and evaluated.

4

+

v' e

SL b

a

Inter-@ffice Memsrandum Date June 15,1983 Suoget DOCUMENT TRANSMITTAL TO NRC L cation

- TMI Nuclear Station To C. Stryth, TMI-l Licensing Manager 6211-83-0529 This date, copies of the following documents wem furnished to Mr. J. Buzy of the NRC, as part of the current NRC Staff evaluation:

1.

TMI-1 Replacement Operator Training Program Description 2.

THI-l Senior Reactor Operator Replacement Training Program 3.

TMI-1 Dimet Senior Reactor Operator Training Program 4.

Licensed Operator Requi.lification Training Program Description 5.

Auxiliary Operator Training Program, Unit I 6.

Memo RPC-83-012 dated May 2,1983, Meeting of 4/22/83 - Operator Training Concerns 7.

Memo 6211-83-0432 dated May 20, 1983 - Operator Training Review Team 8.

Memo 6211-83-0450 dated May 24, 1983 - Minutes of Training Review Team Meeting, May 23, 1983 9.

Nuclear Personnel Training After TMI-2: The GPUN Response

10. Highlighted excerpts from pages 19, 20, 21, 26, 27, and 37 of ASLB pmfiled testimony of Dr. Long, Dr. Knief, Mr. Ross, and Mr. Newton
11. Memo 3200-83-0197 dated April 13, 1983 - TMI-I Restart Qualification Carti
12. Memo 6211-83-0516 dated June 13, 1983 - OTSG Tube Ruptum Training
13. Drill Guides from OTSG Tube Rupture Training

. Coe Director Training & Education RPC/SLN/kyr cc:

R. L. Long, V.P., Nuclear Assurance H. D. Hukill, V.P., TMI-1 S. L. Newton, Managar, Plant Trainirq;, TM1-i I

l ACOOO648

.