ML20093F384

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1984
ML20093F384
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 06/30/1984
From: Grant N, Williams J, Shawn Williams
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-1I-84-243, PNS-LI-84-243, NUDOCS 8407190141
Download: ML20093F384 (20)


Text

s_ -

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 l= UNIT Turkey Point Unit #3 DATE 7-16-84 COMPLETED BY N.W. Grant TELEPflONE (305) 552-3675 MONTH June, 1984 DAY.- AVERAGE DAILY POWER LEVEL DAY

~ AVERAGE DAILY POWER LEVEL (MWe Net) -(MWe-Net) g 673 3j 680 2 680 38 674 679 3 19 672 4 671 671 20 664 5 21 666 6 674 637 22 7

672 23 650 8 671 665 24 9 670 174 25 to 665 360 26 II' 663 670 17 12 667 669 .

28 13 671 671 29 14 676 667 30 15 678 3i 16 683 PJSTRUCTIONS On this forenar.last the aserage daily unit power lesel in MWe Net for each day in the reporting m.inih. Compute to the nearest whute mepwaii.

d (9/771 8407190141 840630 \

gDRADOCK 05000250 PDR 9

- - - - - . ,- -_ ..-- ,, , - - - - - - , . . , , , - , , n , -- .,-n-----, --,er , - - - -

OPERATING DATA REPORT DOCKET NO. 50-250 DATE _7-16-84 COMPLETED BY N.W. Grant TELEPHONE (305) bbz-3675 OPERATING STATUS Turkey Point Unit #3 Notes

1. Ud Na .-

l 2. Reporting Period:

June, 1984 Unit #3 operated at ,

Power except as indicated

! 2200

3. Licensed Thermal Power (MWI):
4. Nameplate Rating (Gross MWe):

/60 in the unit Shutdowns 693 and Power Reductions"

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 666
4. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasoas:

}

9. Powerlevel To Which Restricted,1f Any(Net MWe):
10. Reasons For Restrictions. lf Any:

This Month Yr to.Date Cumulative 72 4367 101432.6

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 711.3 3525.8 69832
13. Reactor Reserve Shutdown Hours 0 0- -

844.4

14. Hours Genere or On.Line 698.0 3426.5 69348.5 0 0 121.8
15. Unit Reserve snutdown Qour.
16. Gross Thermal Energy Generated (MWH) 1520181 7327350 142815942 .
17. Gross Electrical Energy Generated (MWH) 486770 _

2364540 4557510b 4626b0 2238844 43151841

- 18. Net Electrical Energy Generated (MWH),

19. Unit Service Factor 96.9 78.5 68.4
20. Unit Availability Factor 96. 78.5 68.6
21. Unit Capacity Factor (Using MDC Net) . 96.5 77.0 65./
22. Unit Capacity Factor (Using DER Net) 92.6 74.0 61.4
23. Unit Forced Outage Rate 3.1 16.2 6.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achined INITIA L CRITICALITY ,_ _

INITIAL ELECTRICITY COMMERCIAL OPERATION -

. (9/77)

50-250 -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME lurkey Point Unit #3 DATE 7-16-84 June 1984 COMPLETED BY N.W. Grant RtMRT MONW TELEPHONE (305) 552-3675

~: .

c

,- ,]E 3 jI5 Licensee jg j'1, Cause & Corrective

. No. Date i 3g yE 5 5 2g&

jpj.g Event Report a g'!

mO g

y Action to Prevent Recurrence 6

13 84-0626 F 21.9 B 1 250-84-018 CB VALVEX The unit was shut down to repair a leaking instrument isolation valve.

Following the repairs, the unit returned to power operation.

l 3

I 2 3 4 i F: Forced Reason: Mettiod: Exhibit G -Instructions .

S. Scheduied A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee

C. Refueling 3 Automatic Scram. Event Report ( LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161) ,

i:-Operator Training & Ucense Examination ,

F-Administrative 5 G-Operational Error (F splain) x /.o ao AEowca. .,1 Exhibit I - Same Source I

(9/77) Il Other (Explain) 1 l

, SUFalARY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point Unit #3 July 16, 1984 DATE COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT I40 NTH June, 1984 Unit #3 operated at essentially full power excpet as indicated in the

-"unit Shutdowns and Power Reduction" Report.

Inspection and requirements of IE Bullentins and NUREG-0737 are continuing.

Florida Power & Light Company conunitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional

' information.

,e

r .

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point Unit 4 DATE 7-16$4 COMPLETED BY N.W. Grant TELEPJIONE (305)552-3675' MONm June, 1984 .

DAY- AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -IMWe-Net)

, 67 gj 680 2 238 18 669 526 665 3 19 4 15 663 20 5

152 663 21 6 464 662 22 7 552 609 23 g 638 27 24 9' 672 194 25 10 565 -

26 11 155 306 27 12 606 658 -

2s 13 F74 669

~=

29 14 677 3

15 673 31 16 678 I

INSTRUCTIONS On this format hst the aseisge daily unit power lewt in MWe Net for each day in the reporting month. Compute to the nearest who le enepwatt.

' (9/77)

J

OPERATING DATA REPORT DOCKET NO.

DATE /- # 04 COMPLETED BY AW Mant e

TELEPHONE m a paq 675 OPERATING STATUS Notes

1. Unit Name: Twkey pnint finit #4
2. Reporting Period: June 198*

2200 Following Refueling And

3. Lloensed Thermal Power (MWt): Scheduled Maintenance.
4. Nameplate Rating (Gross MWe): 760
5. Design Electrical Rating (Net MWe): N
6. Mexiqum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. PowerI.svelTo Which Restricted,If Any(Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to-Date Cumulatise II. Hours in Reporting Pen.-od 720.0 4367 95,164 b/b.O U4b.J 66,683.9

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours -

0 0 '

166~. 6 us .u_ 1882.0 64,350.1

, 14. Hours Generator On-Line GrossTherma Ene 1,172,598 4,174,82 7 F,921 8 Gene ted (MWH) _

17. Gross Electrical Energy Generated (MWH) # 1,268,bOL 43,189,802 m ,' 26 . _ .

1,190,181 40,894,240

18. Net Electrical Energy Generated (MWH),
19. Unit Service Factor 84.6 43.1 67.6 0 -

43.1 57.7

20. Unit Availability Factor

/4 J 4U- 66.3

21. Unit Capacity Factor (Using MDC Net) .
22. Unit Capacity Factor (Using DER Net) b .b 39.3 62.0
23. Unit Forced Outage Rate 15.4 19.3 4.9
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l 26. Units in Test Status (Prior to Commercial Operation): Forecast Achined INITIAL CRITICALITY

! INITIAL ELECTRICITY COMMERCIAL OPERATION ,__

I (9/77)

. _ . - - . ~ _ .__ _ . _ - . _ . - _ . _ . _ - _ _ _ - - . ~ . - _ . _ _ _ , _ . -

Page 1 of 3 DOCKETNO. 50-251 UNIT SHUTbOWNS AND POWER REDUCTIONS UNIT N AME lurkey, Point Unit #4

  1. ~"' '

DATE p ant ____

REPORT MONTH June 1984 COMPLETED BY %(T l 33'-JD'o TELEPHONE n.

- ;, - .5 E 3j d Licensee ,E r, , Cause & Corrective

. No. Dat : i 3g jj5 Event U g? Action to H 5 mO 0 f5 j g.g Report a g Prevent Recurrence d

08 840601 S 12.5 B 9 HA- TURBIN Turbine Overspeed Test 09 840602 S 0.0 F 5 RC FUELXX Fuel related power reductions associated with returning to power from refueling outage.

10 840604 F 30.6 F 3 LER-251-84-01C HH PUMPXX Reactor trip due to low steam generator level and steam flow greater than feed flow caused by a feedwater pump trip.

11 840605 S 0.0 F 5 RL FUELXX F'uel related power reductions associated with returning to power from refueling outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions .

S. Schedufed A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3- Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction $0ther (Explain) 0161) ,

1 -Operator Training & Ucense Examination ,

F-Administ ratise 5 G-Operational Frror (!% plain) 4 4.Ao aseve.v. .cl Exhibit I Same Source 19/77) 11-01her i E xplaini

andP Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKETNO. En 961 ,

UNITNAME s urKey roint Unit #'4 DATE 7-16-84 June 1984 C00fLETED BY N W. Grant REPORT MONTH TELEPHONE (105) 667-1675

":. c Dai:

,- {? 3 *E5 Licensee ,Eg {"'. Cause & Corrective

. No. i 3= s .a s & Evant g- gU8 Action to

  • y: 5 j g.g Report a mO g Prevent Recurrence 6

12 840610 F 14.8 B 1 HD- VALV0P The unit was shutdown to repair a mainsteam isolation valve solenoid.

13 840623 F 6.5 B 1 HA TURBIN The unit was shutdown to balance the main turbine.

14 840624 F 6.5 B 1 HA VALVEZ The unit was shutdown.to repair a turbine oil intercept valve.

15 840625 S 0.0 H 5 RL FUELXX Power reduction to verify moderator temperature coefficient and to repair turbine intercept valve.

I 2 3 4 i F Forced Reason: '.tethod: Exhibit G - Instructions .

5 Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Miintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161) ,

E-Operator Training & License Examination F Administrative 9, ,

5 G-Operational Frror (Fsplain) 4 /.o a o a s evca..cl Exhibit I - Same Source (9/77) II-Other ( E xplain )

l

a Page'3 cf 3-DDCKET NO. 50-251-UNIT SHUTDOWNS AND POWER REDUCDONS UNITNAME _ Turkey Point Unit#t/.

DATE 7-16-24 June 1984 cot @LETED BY N. W. Grant _

REPORT MONDI TEt,EPHONE f ins) 689 4675

,- ~k -

c E,

, .i E E f .s 4

.:: Licensee , g"L Cause & Corrective No. Date g  ! R 2s& Event uv E.'" Action to 0

$5 5 j di g Report a rN 0 Prevent Recurrence b

16 840625 F 33.2 B 1 HA VALVEX The unit was shut down to repair a turbine oil intercept valve.

17 840627 S 0.0 H 5 HH ZZZZZZ Power reduction for secondary chemistry control and verification of moderator temperature coefficient.

I 2 3 4 I~: Forced Reason . Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction G-Other (Explain 1 0161) 1 -Operator Training & Licenw Examination F-Administrative ,

5 G-Operational I reur ( Fiplain) 4_ /,o ao Asovea. .c/ Exhibit I - Same Source (9/77) Il-Of her i E splain)

SUMMARY

OF OPERATING T :PERIENCE DOCKET NO. 50-251 UNIT Turkey Point Unit #4 DATE July 16,1984 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH June 1984 Unit #4 returned to power following a refueling and scheduled liaintenance outage and operated at~ essentially full power except as indicated in the

" Unit Shutdown and Power Reduction" report.

Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Light Company conmitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NkC for additional information.

s-1

AVERAGE DAILY UNil POWER LEVEL 00~335 DOCKET NO.

ung). St. Lucie Unit #1 DATE 7-16-84 N.W. Grant COMPLETED JY TELEPilONL- (305) 552-3675'

. MONTil June, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

' (MWe Net) -(MWe-Neil 818 j 856

' 18 856 3 854 854 39 4 854 857 20 5

839 855 2j s 828 853 22 852 852 7 23 8 -__

853 9 852 850 25 10 851 417 26 11 850 840 27 12 849 848 -

2s 13 848 853 29 14 790 855 30 is 767 31 16 853 .

o INSTRUCTIONS e n are i h[q ' '.he aserage daily urlit power leselin MWe. Net for each day in the reporting month.Comt,u (9/77)

  • ~ ~- - __, ,. _

OPERATING DATA REPORT DOCKET NO. _50-335 DATE ./-16-64 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS

" I"cio Iinit #1 Notes

1. Unit Name:
2. Reporting Period: June, 1984 Unit #1 Operated at
3. Licensed Thermal Power (MWt):

2, essential h M l P en

4. Nameplate Rating (Gross MWe):

' 5. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe): 8
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power 1,4 vel To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any: -

This Month Yr to-Date Cumulative 1I. Hours In Reporting Period 720 4367 65975

12. Number Of Hours Reactor Was Critical 713.8 l19J.0 45659.7
13. Reactor Reserve Shutdown Hours 0 U '- 205.3
14. Hours Generator On-Line 710.5 1079.0 44655.2 i
15. Unit Reserve Shutdown 1(oun 0 0 3U
16. Gross Thermal Energy Generated (MWH) 18841bb 2684189 -11i352127 l 17. Gross Electrical Energy Generated (MWH) 629650 , _ ,

890470 36264345

18. Net Electrical Energy Generated (MWH)'

597840 823bbb 341b/839 l

19. Unit Service Factor 98.7 24./ b/./
20. Unit Availability Factor 98.7 44./ 6/.7
21. Unit Capacity Factor (Using MDC Net) .

101.0 22.9 65.5

22. Unit Capacity Factor (Using DER Net) 100.0 22.7 63.8
23. Unit Forced Outage Rate I3 1.0 4.5

- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup.
26. Units in Test Status (Prior o Commercial Operation): Forecast Adiioed INITIAL CRITICALITY __

INITIAL ELECTRICITY _

COMMERCIAL OPER ATION (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.- 50-335 UNIT NAME St. Lucie Unit #1 DATE 7-16-84 g ant REPORT MONTH TELEPHONE (305) 552-3675

~

- h c

,- .i ? 3 j$3 Licensee  !*,

j"3.

Cause & Corrective

. No. Date c-4

E s 25E Event u '?

AG c- Action to

[@ $ j g.g Report e

[O Prevent Recurrence 6

05 840626 F 9.5 A 3 to be assigned .HB VALVEX Reactor trip as a result of the later closure of a Main Steam Isolation Valve. The valve was repaired and the unit returned to power operation.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S. St.heduled A-Equipment Failure (Explain) I Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheeis for Licensee C-Refueling 3 Automatic Scram. Event Report ILER) File (NUREG-D Regulatory Restriction 9-Other (Explain 1 0161) .

E-Oswrator Training & Ucense Examination ,

F Administrative 5 G-Operational Er ror (F vplain) 4- /.oao aseve .d Exhibit I - Same Source 19/77) 11-01her ( Explain )

SUMMARY

OF OPERATING T :PERIENCE 50-335 DOCKET NO.

UNIT St. Lucie Unit 1 DATE July 16, 1984 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 - _

REPORT MONTH June 1984 Unit #1 operated at essentially ful1 power except as indicated in the

" Unit Shutdowns and Power Reduction" Report.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

,In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges. to PORV or safety valves during the report month.

O D

6

.e - ~~ ,

AVERAGE DAILY UNIT POh1R LEVEL DOCKET NO. 50-389 UNIT St. Lucie Unit #2 DATE .

7-16-84 COMPLETEDBy N.W. Grant TELEPflONE (305) 552-3675 MONTH June, 1984 DAY AVERACE DAILY POWER LEVEL DAY

  • AVER AGE DAILY POWER LEVEL IMWe Net) .(MWe. Net)
813 ,j 814 2 813 18 812 752 3 19 811 4 746 20 815 797 5

21 812 6 812. 812 22 7 811- 811 23 s 812 810 24 9 811 809 25 10 811 810 26 11 810 809 27 12 809 810 28 13 809 811 29 14: 810 811 30 15 811 31 36 812 INSTRUCTIONS On this format.hsr the aser sge daily unit power leselin MWe Net for eac's day in the reporting inonth. Compute so lhe nearest whole impwait.

I

. 19/77)

,, , . , - -. , , , - - . . . . . - - - . . _ , , , , - . - - _ , - , . , , - - . . . - .,,a. _

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET UNIT NAME NO. 5 L. Lucie unit #2 DATE (-lbr6L _ __

. June 1984 COMPLETED BY (ava) occ-aofo REPORT MONTH TELEPHONE r c

- e.

,,- 1? g f,3. gc4

.::5 Licensee gg E"., Cause & Correttive

- No. Date g 3g  ; Event u? 8.? Acti<m to

$3 E j 5-j Report a rE 0

}0 Prevent Recurrence 6

Unit #2 had no shutdowns or significant power reductions.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S. Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriceion 9-Other (Explam) 01611 ,

E-Operator Training & License Examination ,

F-Administrative 5 G-Operational Error (Fxplain) 4. /oao A sevc;,..,1 Eshibit I - Same Source tof77) Il-Other (E xplainI

OPERATING DATA REPORT DOCKET NO.

DATE - /-ID-D4 COMPLETED BY N.W. Grant TELEPHONE (,$ub ) ooc-3675 OPERATING STATUS

1. Unit Name: St. Lucie Unit #2 Notes June, 1984 Unit #2 Operated at
2. Reporting Period:

2560 essentially full power.

3. Licensed Thermal Power (MWI):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): _ 804
6. Maximum Dependable Capacity (Gross M%e):

832

7. Maximum Dependable Capacity (Net MWe):

786

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr to Date Cumulative 720 4367 7872 II. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 720 4346 4 7575.4 0 0 -

0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 720 4212.6 7343 0 0 0
15. Unit Reserve Shutdown l{ours
16. Gross Thermal Energy Generated (MWH) 1834630 10664431 18322375 .
17. Gross Electrical Energy Generated (MWH) 612980_, 3574660 6117880
18. Net Electrical Energy Generated (MWH) 580648 3381654 ~5779240 100.0 96.5
19. Unit Service Factor 93.3
20. Unit Availability Factor luu.u 96.5 93.3
21. Unit Capacity Factor (Using MDC Net) - 102.6 98.5 93.4
22. Unit Capacity Factor (Using DER Net) 100.3 96.3 91.3
23. Unit Forced Outage Rate 0 2.9 6.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each b Refueling, 10/84, 2 months.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achined
INITIA L CRITICALITY _ , _

l INITIAL ELECTRICITY COMMERCI AL OPER ATION

. W/77) g

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO, 50-389 UNIT St. Lucie Unit #2 DATE July 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH June, 1984 Unit 2 operated at essentially full power.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are

. continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PROV or safety valves during the report month.

a _,

FLORIDA POWER & LIGHT COMPANY July 16, 1984 PNS-LI-84-24 3 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the June 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, Y "Y hJ.W. Willi Jr.

Group Vice #rdsident Nuclear Energy JWW/PLP/js Attachment cc: Harold F. Reis, Esquire l

p

PEOPLE . . . SERVING PEOPLE L