Text
[
123 Main Street Whto Ptains, NewYork 10601 914 681E2%
M NewYo.rkPbwer et;":=,_
tv Authonty October 9, 1984 JPN-84-65 Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
-Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A.
FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to Technical Specifications Regarding Instrumentation That Initiates Recirculation Pump Trip
Dear Sir:
Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document entitled, " Application for Amendment to operating License," together with forty (40) copies of Attachments I and II thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.
The change proposed corrects an error in Table 3.2-7
~(" Instrumentation That Initiates Recirculation Pump Trip") on Page 77 of Appendix A to the FitzPatrick Operating License.
The trip level setting associated with the reactor high pressure instrument is changed from " 1 1120 psig" to " $ 1170 psig".
The purpose of this change is to correct an error on Table 3.2-7 that was apparently introduced in the initial issuance of the Technical Specification (Appendix A).
The Authority discussed this error with the FitzPatrick NRC Project Manager on August 1, 1984.
During these telephone conversations, we were informed that the NRC staff agreed that Table 3.2-7 was incorrect and that 1 1120 psig" should " $
1120 psig".
i b [/
I n L(\\
l
'k gl 2 lh 4k 0410120025 841009 i'h PDR ADOCK 05000333 5
P pos s
d c
No significant safety hazard existed prior to the discovery and subsequent correction of this setpoint because at no time was the ll50: psi limit used in NEDO-10349 exceeded while setting the high L
' reactor pressure recirculation pump trip, t
The: proposed changes are Attachment I to the Application for L
Amendment-to the Operating License enclosed with this letter.
The l
Safety Evaluation for the proposed changes to the Technical Specifications is Attachment II to the Application for Amendment.
L In accordance with the requirements of 10 CFR 50.91, a copy of this application with attachments, is being provided to the designated New-York State official.
In accordance with the requirements of 10 CFR 170.12 and 10 CFR L
,170.21, the Authority has enclosed a check for $150.00 for the amendment application fee.. The Authority pays this fee under protest.pending a final determination of the legality of the fee schedule.
L Very truly yours, l
.'P.'aynd First Executive Vice President Chief Operations Officer cc:
Office of the Resident Inspector U. S. Nuclear Regulatory Commission P._O. Box 136 Lycoming, New York 13093 Mr. J. D.
Dunkleberger Division of Policy Analysis And Planning New York State Energy Office Agency Building 2, Empire State Plaza Albany, New' York 12223 l
w s.
a
__-------,-----_-__sa---
_ - - - - - - _ _ - - - _ - - - - -,. - - - - - -,. - - -, - - - - - - - _ _ - - - - - -. - - - - - - - - - - - - - - - - _ _ - -. - - - - - - - - - -. -, - - - -,, - - -. - - - - - - -. - -. _ - - -. - - - - - - -. - - -.. - - - - - - - - - - - - - - - -