Advises of Intention to Use Shorter Duration Test Acceptance Criteria for Facility Type a Tests Until ANS 56.8 Std Committee Develops New Criteria for Shorter Duration Testing Based on Mass Point Analysis Method
ML20093D520
Person / Time
Site: North Anna  
Issue date: 10/05/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
470, NUDOCS 8410110270
Download: ML20093D520 (2)


Text

-

c 4

T'IROINIA ELECTRIC AND Powan COMI*ANY RIcnwown, VIRGINIA 20261 W

..L.StuwAnt Vsc P. s s..T October 5, 1984

. weci..

o,.

non.

4 Mr.' Harold R. Denton,. Director Serial No:

470 Office of Nuclear Reactor Regulation N0/DWL,JPS/lms Attention::Mr. James R. Miller, Chief Docket Nos. 50-338 Operating Reactor Branch No. 3 50-339 Division of Licensing License Nos. NPF-4

.U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 SHORTER DURATION TYPE A TESTING REQUIREMENTS In accordance with the North Anna Power Station. Unit Nos. I and 2 Technical Specifications 3/4.6.1.2, the provisions and methods of Appendix J to 10 CFR Part 50 and ANSI N45.4-1972' govern the Type A test duration. ANSI N45.4-1972, Section 7.9, Computation of Leakage Rate-The Absolute Method, states that

" Leakage rates shall therefore be calculated on at least an hourly basis for 24 consecutive hours (or' other agreed upon period)".

-Provisions for shorter duration Type A testing have been approved by the NRC.

These provisions are specified in the Bechtel topical report BN-TOP-1, Revision 1,-November 1972.' These provisions have been used cince 1980 as the basis 'to develop appropriate test acceptance criteria in order to permit shorter duration Type A testing at our Surry Power Station.

Beginning with the current Unit 2 refueling outage, it is our - intent to use the shorter duration test acceptance criteria for North - Anna Units 1 and 2 Type A tests until the ANS 56.8 Standard Committee develops new criteria for shorter duration testing based on the' Mass Point Analysis Method.

North Anna's Type A test acceptance criteria for shorter duration testing is based on the Mass Point Analysis Method as well as on BN-TOP-1 criteria.

If, however, the full 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration is performed. only the Mass Point Analysis Method criteria would apply.

The Vepco Integrated Leak Rate' Test computer program contains the required BN-TOP-1 test methodology (Total Time Analysis) as well as the Mass Point Analysis methodology.

This computer program has been used on several Surry Type A tests and the results of this program have been reviewed by NRC Region 1

II inspectors.

0410110270 841005 MS PDR ADOCK 05000338 j

\\

PDR t g t

p i

W[.if VamotwsA Er.scranc Axn Powna COMPANY TO Harold R. Denton Vepco - is _ aware of the _ problems encountered at-the Zion Nuclear Station in their attempts to. perform a shorter duration Type A testing. -Therefore,

-we have reviewed.'our intended test acceptance' criteria and we are confident that'we will_be in compliance with the Type A test duration criteria obtained

!by'the methodology.of BN-TOP-1.

If you have any questions or concerns regarding our approach, please con' tact us at your earliest convenience.

Very truly yours, s

I Wh

~

.L-W. L. Stewart ec:

Mr. James P..O'Reilly Regional Administrator Region II U. S. Nuclear Regulatory Commission Mr. Morris'W. Branch' NRC Resident Inspector-North Anna Power Station 4

_i<