ML20093C542
| ML20093C542 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/24/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30636-TDS, DER-83-73, NUDOCS 8410100588 | |
| Download: ML20093C542 (2) | |
Text
r,
~
~
s IlECE!VED Arizona Public Service Company E
E SEP 27 MI10: 58 September 24, 1984 ANPP-30636-TDS /TRB DUN V W U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-73 A 50.55(e) Potentially Reportable Deficiency Relating To Unqualified Foxboro Power Supplies Were Installed In IE Instrument Cabinets.
File: 84-019-026; D.4.33.2 i
Reference:
( A) Telephone conversation between P. Narbut and R. Tucker on
{
October 27, 1983 (B) ANPP-28290, dated November 28,1983 (Interim Report)
(C) ANPP-28538, dated January 3,1984 (Time Extension)
(D) ANPP-28934, dated February 24,1984 (Time Extension)
(E) ANPP-29352, dated April 24, 1984 (Time Extension)
(F) ANPP-29582, dated May 23, 1984 (Time Extension)
(C) ANPP-30448, dated May 23, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D), (E), (F), and (C). At that time, it was estimated that a Final Report would be available by September 25, 1984 Due to the extensive investigation and evaluation required, it is now expected that this inf ormation will be finalized by October 25,1984, at which time a complete report will be submitted.
There is no new inf ormation or change to the Interim Report at this time.
Very truly yours, t
- h.
Cl.LL q LLL rN 0410100508 840924 PDR ADOCK 05000528 E. E. Van Brunt, J r.
8 PDR APS Vice President Nuclear Production ANPP Project Director EEVS/TRB/nj cc See Page Two
s 3.
e-1..
f J
Mr. T. W. Bishop DER 83-73
~
Page Two' cc:-
. Richardi DeYoung, Director
' Office 'of Inspection and Enforcement-U.. S. ' Nuclear Regulatory - Commission Washington, ' D. C.
20555~
T. Gi Woods,1Jr.
D. B. Karner W. E. Ide
' D. B. Fasnacht A. C. Rogers l
L. A.-Souza D. E. Fowler.
T. D. ~ Shriver.
C. N. Russo J. Vorees J. R. Bynum-J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield l
W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster.
[
i D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods l
T. J. Bloom I
Records Center r
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l
l t
I l
+-
~ __,.