ML20093C293

From kanterella
Jump to navigation Jump to search
Submits List of Items Identified in 840621 & 0717 Deferral Request Ltrs Completed & or Possibly Dropped from Further Consideration & Not Incorporated as License Conditions Covering Const & Fire Protection
ML20093C293
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/04/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
CON-#484-481 OL, NUDOCS 8410100468
Download: ML20093C293 (3)


Text

...

PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JOHN S. KEMPER VIC E*R ESID E NT anstmss nesse Aseo nassances Mr. A. Schwencer,- Chief Docket Nos.:

50-352 Licensing Branch No. 2 50-353 Division of Licensing U. S. Nuclear Regulatorv Cormission Washington, D.C. 20555 *

Subject:

Limerick Generating Staticn, Units 1 and 2 Pre-Operational Tests, Construction and Fire Protection Deferrals

References:

1)

V. S. Boyer to A. Schwencer letter dated June 21, 1984, 2)

J. S. Kaper to A. Schwencer letter dated July 17, 1984.

3)

R. J. Stipcevich (PITO) and Byron Siegel (NFC)

Conference Call dated 9/24/84.

File:

GOVT l-1 WRC)

Dear Mr. Schwencer:

In reference letters no. I and 2 we requested certain pre-operational tests, construction and fire protection items be deferred until after fuel load in accordance with the technical

. justifications provided.

Since the time our request was made several of the items identified in our deferral request letters have been empleted and consequently should be dropped farn further consideration and not incorporated as license' conditions in our low power license. The individual deferral itms ta be deleted were given to Mr. B. Siegel in the reference telephone call and are as follows:

. Pre-operational Tests IP16.1 - Residual Heat Removal Service Water System.

1P79.2B - Offgas Pretreatrrent and Radiation Monitoring.

1P79.2C - Main Steam Line Radiation Monitoring.

Wrapping of Cables for Raceway Construction separation Criteria Capliance.

[

8410100460 841004 PDR ADOCK 05000352 M

A PDR

.i p?

F

[.

- Fire Protection Encapsulation of Raceway Required for Safe Shutdown.

t Heat Shield and Spill Protection -

[ '-

Ioad Centers at EL 313 Reactor 1

Building.

t Repair to Existire Structural Steel Coating.

Internal Seals for Conduits 'Ihat Penetrate Fire Barriers.

All other deferral items in reference letters no. I and 2 remain unchanged.. Should you require additional information or clarification, we would be pleased to discuss this in greater detail.

p Sincerely,

- ((

RJS/gra/10018402 cc: See Attached Service List a-5 g.

N

P c'

cc: Judge ~ Helen F. Hoyt Judge Jerry Harbour Judge Richard F. Cole Judge Christine N. Kohl

' Judge Gary ~J. Edles c.p Judge Reginald L. Gotchy Troy B. Conner,.dr., Esq.

Ann P.' Hodgdon, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony Ms.'Phyllis Zitzer Charles W. E11 tot,' Esq.

Zort G. Ferkin, Esq.

Mr. Thomas Gerusky Director,' Penna. Emergency Management Agency Angus R. Love, Esq.

David Wersan, Esq.

Robert d.~ Sugannan, Esq.

Martha W. Bush, Esq.

. Spence W. Perry, Esq.

day M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel

-Dceket & Service Section Mr. James-Wiggins Mr. Timothy R. S. Campbell N

8 r

R

,,wcs

.,,r.. -,-,-,,

,se-,.,.-.,

w=

--m.s.+a---e-pa,e-+-y,-

  • * - - " =

w wv9

~

r****.