ML20093B457
ML20093B457 | |
Person / Time | |
---|---|
Site: | 07109228 |
Issue date: | 04/02/2020 |
From: | GE-Hitachi Nuclear Energy Americas |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML20093B448 | List: |
References | |
M200033 | |
Download: ML20093B457 (2) | |
Text
ENCLOSURE 2 M200033 GE2000 SAR Change Summary Table for Enclosures 3 and 4 Non-Proprietary Information
NEDO-33866 Revision 6 Non-Proprietary Information xlv Changes from Revision 5 to Revision 6 are listed in the following table. Revision bars are used for these changes.
Location Description of Change (Rev. 5 to Rev. 6)
Reason for Change Chapter 1 Section 1.1 Updated reference to most recent NRC approved GEH Quality Assurance Program.
Administrative change.
Section 1.2.2.1 Changed Item 1.a description:
From: Irradiated hardware components composed of stainless steels, carbon steels, nickel alloys, and zirconium alloys To: Irradiated hardware components composed of metallic alloys (e.g.,
stainless steels, carbon steels, Iron Chromium Aluminum (FeCrAl), nickel alloys, and zirconium alloys).
Clarification change.
Section 1.4 Updated Reference 1-1 to most recent NRC approved GEH Quality Assurance Program.
Administrative change.
Chapter 5 Section 5.2 Irradiated Hardware and Byproducts Item 1 description changed:
From: Hardware: Irradiated metals composed of materials such as SS, carbon steels, nickel alloys, and zirconium alloys.
To: Hardware: Irradiated components composed of metallic alloys (e.g., SS, carbon steels, FeCrAl, nickel alloys, and zirconium alloys).
Clarification change.
Chapter 8 Section 8.1 Updated references to most recent NRC approved GEH Quality Assurance Program.
Administrative change.
Section 8.1.1 Updated reference to most recent NRC approved GEH Quality Assurance Program.
Administrative change.
Section 8.4 Updated References 8-1 and 8-2 to most recent NRC approved GEH Quality Assurance Program.
Administrative change.