ML20093A444

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-16 Re ESF Actuation Sys Relay Cabinet Base Plates.Initially Reported on 840321.Final Rept Under Review & Scheduled to Be Submitted by 840821
ML20093A444
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/26/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29829-TDS, DER-84-16, NUDOCS 8407100505
Download: ML20093A444 (2)


Text

,

oA

't r

ItECB\\fE0 f -

itTic f,,

Arizona Public Service Company W 33l 29 Fy \\; 3y e

June 26, 1984 REGIOlJ)/tgp ANPP-29829-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut' Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84216 A 50.55(e) Potentially Reportable Deficiency Relating To ESFAS Relay Cabinets Base Plates 2

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on March 21, 1984 (B) ANPP-29239, dated April 6, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by June 29, 1984.

APS is currently reviewing the Final Report. The report is scheduled to be submittted to the NRC by August 21, 1984.

There is no new information or change to the Interic Report at this time.

Very truly yours,

(

. RL(

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director

\\

EEVB/TRB:db cc: See Page Two 8407100505 940626 DR ADOCK 05000528 PDR g

1[-27

&Y e4

-);f ^ $.

dir

. :e Mr. T. W, Bishop q-i ~

TER 84.I d

3

._? ge Tw.*

Gr;;O

~

l ect Richard DeYoung, Director

]m.

s,y ?

Office of Inspection and Enforcement

- i J)

~ ' e V; U. S.. Nuclear Regulatory Commission Y

Washington, D. C. 20555 6 f-T. G.. Woods, Jr.

D. B. Karner

^'

~W. E.-Ide D. B. Fasnacht A. C. Rogers

'd' L. A. Souza Q

D. E.-Fowler-T. D. Shriver f ~~,

C. N. Russo J.'Vorees d'

O'-

J. R. Bynum s

' a-J. M. Allen

\\

I

- l.

J. A. Brand l'

A.:C. Gehr a

W.'J.

Stubblefield j-fl.k(y. _,,jj/ ;

fdy i-W. G. Bingham g-R. L. Patterson O

a r' R. W. Welcher jM H. D. Foster

f D. R. Hawkinson N

j '!,.

L. E. Vorderbrueggen

,e d :,,,

R. P. Zimmerman d

S. R. Frost

?

J. Self '

43

)~

D. Canady

~'

T. D. Bloom t.

ay 1 Records Center

( N,. J - #

. Institute of. Nuclear Power. Operations s

1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 5.. i g-b:

$/

3

>) C 9>

ul c

.s.

  • d f

SY(;h

.f

+l, -

,4;

')

J e- -

,