ML20092P508

From kanterella
Jump to navigation Jump to search
Potential Deficiency Rept Re Matl Supplied by Ray Miller Co,Inc.Initially Reported on 830218.Documentation Review Did Not Identify Procurement of safety-related Matls from Ray Miller.Item Not Reportable Per 10CFR50.55(e)
ML20092P508
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/28/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-83-07, IEB-83-7, KMLNRC-84-100, NUDOCS 8407090023
Download: ML20092P508 (3)


Text

- _ _ _ _ _ _ _ _ _ . . _

3 KANSAS GAS AND ELECTRIC COMPANY THE ELECTAtC COMPANY

@LENN L. KOESTER V8CE Pets *DEpe? PsyCLEAR June 28, 1984 Mr. E.H. Johnson, Acting Chief i Reactor Project Branch 2 U.S. Nuclear Regulatory Commission  % ] @ ] h h__

i Region IV 611 Ryan Plaza Drive, Suite 1000 Jtt-3 m Arlington, Texas 76011 y KMLNRC 84-100 Re: Docket No. STN 50-482 Ref: 1) Letter KMLNRC 83-030 dated 3/18/83 from GLKoester, KG&E, to WCSeidle, NRC

2) Letter KMLNRC 83-092 dated 7/15/83 from GLKoester, KG&E, to WCSeidle, NRC
3) Letter SLNRC 84-049 dated 3/23/84 from SJSeiken, SNUPPS, to JTCollins, NRC Subj: Withdrawal of Potential 10CFR50.55(e) -

Ray Miller

Dear Mr. Johnson:

On February 18, 1983, Kansas Gas and Electric Company (KG&E) reported a potential 10CFR50.55(e) matter concerning material supplied to the Wolf Creek Generating Station by the Ray Miller Corporation. Additional information was subsequently provided in the References.

The specific problems associated with material supplied by the Ray Miller Corporation were identified in I&E Information Notice 83-01 and Bulletin 83-07. As a result of these notifications a review was conducted of SNUPPS procurement records from January 1,1974 through December 31, 1979.

The results of this investigation were described in Reference 3) . Con-current with the generic (Wolf Creek and Callaway) SNUPPS effort, a review of site specific procurements or Wolf Creek Generating Station was also conducted by KG&E. This investigation addressed the same time period as the SNUPPS review. During the review of site specific procure-ment documentation, KG&E determined that some fittings had been ordered from Ray Miller Corporation. However, all of the fittings identified were ordered on non-safety related purchase orders for non-safety related applications. The documentation review did not identify any site specific procurement of safety-related materials from Ray Miller. As documented in Reference 1), the review did identify five non-safety related flanges that were received with an approved safety related heat number. 'Ivo of the flanges had been installed and the other three were found in the non-t 8407090023 830628 -

gDRADOCK05000 g -).}

201 N. Market -Wictate, Kansas - Mail Address: P0. Box 208 I Wichita, Kansas 67201 - Telephone: Area Code (316) 2616451 0$

e , , 5,- c.

-Mr..E.H. Johnson KMLNRC 84-100 June 28, 1984 safety related material storage area. Although there was no indication that the two flanges were used in a safety-related application, KG&E had

- independent destructive testing performed on the three flanges since the heat number is one method of identifying safety-related fittings. The results' attached indicate that the flanges met or exceeded safety-related material requirements.

I As a result of the aforementioned activities, KG&E has concluded that this matter is not reportable pursuant to 10CFR50.55(e) . Please contact me or Mr. Otto Maynard of my staff if you have any questions concerning this subject.

Yours very truly, Glenn L. Koester -

Vice President - Nuclear GLK bb Attach xc PO'Connor, w/a HBundy, w/a RCDeYoung, w/a

r _7 3, : it- - -

w I

Attachment to KMLNRC 84-100 June 28, 1984 MATERIAL EXAMINATION AND TEST RESULTS Description of Material Examined and Tested:

[' 2-inch schedule 40, Class 150, Socket-Welded Flange Key Procurement Specifications:

Grade F304 Meeting ASTM-A-182 Ray Miller Branch Office:

Skokie, Illinois Quantity of Material in Stock:

5 (Five)

Quantity of Material Examined and Tested:

l 3 (Three) i l

l Testsand Examinations Performed:

l l- '

Dimensional Tests, Physical Properties, and Chemical Test Results:

I

-
Test results indicate that all three flanges tested l meet or exceed the requirements for 2-inch, schedule 40,

. Class 150, socket-welded flanges and the requirements

, for Grade F304 .

i 1

1

.