Responds to NRC Re Violations Noted in IE Insp Repts 50-321/84-07 & 50-366/84-07.Site Engineer Review of Sample of 10 Drawings,Which Incorporated as-built Notices, Found No Discrepancies
ML20092P095
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/08/1984
From: Gucwa L
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20092P091 List:
References
NED-84-308, NUDOCS 8407050403
Download: ML20092P095 (1)


Text

.

m.

  • Georg.h Power Company 333 Piedmont Avenue Atlanta. Georg:a 30308.

Telephone 404 S2G6526

Maing Address

Post Office Box 4545 A:tanta, Georgia 30302 84 JUN 12 A 9 : 00 Georgia Power L. T. Gucwa the southern electic system i

Manager Nuclear Engineenng NED-84-308 andChief Nuclear Engineer dine 8, 1984 U. S. M1 clear Regulatory Canaission

REFERENCE:

Office of Inspection and Enforcement RII: JFO 7

Region II - alite 2900 50-321/50-366 i

101 Marietta Street, Mi I&E Inspection Report Atlanta, Georgia 30303 84-07 ATTENTION: Mr. James P. O'Reilly GENrIDEN:

Georgia. Power Conpany provides the following additional information as 4

amplification of our letter of April 13, 1984, which responded to violations identified during an inspection conitcted Jamary 21 - February 20, 1984, and reported by your letter dated March 14, 1984.

RESPOEE 'IO VIOLATION 3:

l Reasons for the - Violation:

%e albject drawing revision was a mamal revision of a drawing which had been pro &1ced by a new altamated drafting system. It is current practice that as drawings are revised to reflect design changes, those regliring redrafting are accouplished by an altamated drafting system (which uses new symbols for. globe and ball valves).

It was decided,- in this particalar case, that it was more expedient to mamally correct the drawirg rather than use the altamated system since the change was relatively. minor.

%e old symbol for the ball valve is almost identical to the new symbol for the globe valve, and the ' wrong symbol was inadvertently incorporated into t% drawing.

We reiterate that we believe this to be an isolated case and is not indicative of a progrannatic problem.

Additional Corrective Steps Wh{ch_Have Been Taken and the Reallts Achieved:

A Site Engineer -has reviewed a sample of 10 drawings which incorporated As Railt Notices and found no additional discrepancies. A letter has been isaled to all Southern Campany Services, Inc.

departments working on Plant Hatch drawings caitioning the-proper

' incorporation of synbols.

If you have any further glestions regarding this response or reglire further

-infonnation regarding our actions in this matter, plear-e contact,this office.

Very truly yours, i

.8407050403 840620 ff @

- PDR ADOCK 05000321 I.. 'r. G1 cwa a

G PDR MJB act

<H. C.. Nix, Jr.

Senior Resident Inspector

.m