ML20092N842
| ML20092N842 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 06/19/1984 |
| From: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20092N843 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 FVY-84-64, GL-82-33, NUDOCS 8407050117 | |
| Download: ML20092N842 (1) | |
Text
.
VERMONT YANKEE NUCLEAR POWER CORPORATION RD 5. Box 169. Ferry Road, Brattleboro, VT 05301 p
ENGINEERING OFFICE g
1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 T ELEPHONE 617-812-4100 June 19, 1984 FVY 84-64 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
References:
a License No. DPR-28 (Docket No. 50-271) a b
Letter, VYNPC to USNRC, FVY 83-85, dated 8/4/83 c
Letter, USNRC to All Operating Reactors, Generic letter 82-33, dated 12/17/82
Dear Sir:
Subject:
Vermont Yankee Detailed Control Room Design Review (DCRDR) Program Plan 4
By letter dated August 4, 1983 [ Reference b)], we committed to providing you with a copy of the Detailed Control Room Design Review (DCRDR) Program Plan for our facility. A copy of this plan is provided as Enclosure 1.
The post-review DCRDR Summary Report, including a schedule for any necessary Control Room modi-fications, will be submitted in July 1985.
We trust that our program plan is deemed acceptable; however, should you have any questions regarding this matter, please contact us.
Verry truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION
$"/
AW Warren P.
urphy
(/
Vice President and Manager of Operations WPM /dm ob ll I
8407050117 840619
~
k
.PDR ADOCK 0S000271 g.
F PH 1