Text
-
+ -.~
~ _ -.
s 1
,.z DUKE POWER GOMPANY l
P.O. BOX 33189 6
CHARLOTTE, N.C. 28942 HAL B. TUCKER '
run.mynou (704) 373-4531 j
t-==-
~""
-June 29, 1984 l
Mr.LHsrold'R.:Denton, Director
?0ffice-of Nuclear Reactor. Regulation U.C S. Nuclear Regulatory Commission Washington, D.LC. 20555
-l l
-Attention: ~ Ms. E. G. Adensam, Chief
- Licensing Branch No. 4-Re: Catawba Nuclear Station-Docket Nos.-50-413 and:50-414-l
Dear.Mr. Denton:
l On; March _21, 1984' representatives from Duke Power Company met with the NRC
' Staff.to discuss Duke's proposed program for resolution of the TDI diesel generator issue for Catawba. This' meeting, and a follow-up letter dated
- April:5,1984, provided a detailed description of the Extended Operation Test of the Catawba 1A diesel generator and the proposed inspection plan.
The i_nspection program involved' extensive disassembly of the diesel'and 100%
4
-inspection of parts for which there was a history of problems or other reasons l
for special concern.. Substantial sampling inspections were-performed on l
.other important, parts where there was no history of problems._ A preliminary i
report detailing the status of the component revalidation inspection program
~
was prepared by Duke and submitted to the NRC on June 1, 1984. 'This' report.
9 icovered the-results of over 76% of total inspections to be performed. Rep-
- resentatives from Duke met with the NRC Staff on June 21,'1984 to discuss.
.these inspection ~results.
Inspection of the.1 A diesel is"now ' complete, except for. a few inspections s
n that must be performed during or. following engine reassembly. The attached
' report describes the results of the inspections and evaluations performed.
i
'This report addresses over 99% of-the inspection plan which includes about
'I
~
~4,800fseparate inspections.--Results_of remaining inspections during engine
._ reassembly will.be documented in the Owners Group Phase II program.
b As a result of the Extended Operation Test of the Catawba 1A diesel generator l
- and the extensive. inspections conducted, it is concluded that TDI diesel
- generators installed at Catawba will provide a reliable source of backup power.
t Very? truly yours, e4Ab c &
.Hal'B. Tucker ROS/php j
l ;, ' M;C u
D 0
- n i
Mr.. Harold.R. Denton,' Director i
fJune 29,1984 i
-Page:2' f
i cc: Mr. James-P. O'Reilly, Regional Administrator-
... U. S. Nuclear Regulatory Commission
-Region II f
-101:Marietta Street, NW,: Suite 2900 Atlanta,' Georgia-30323
~ NRC Resident Inspector
- Catawba Nuclear Station t
Robert Guild, Esq.
I'
- ' Attorney-at-Law P.' O. Box 12097 Charleston, South Carolina 29412 l
-- Palmetto Alliance
~ 21351 Devine Street Columbia, South Carolina 29205 j
Mr. Jesse L. Riley.--
i Carolina Environmental Study Group 854 Henley Place
~
Charlotte, North Carolina 28207 t-0
~
?
+
I I
~
l 2
i t
A i 1
)
?
a
--eg,~
,c,.
.. mare-~,.,-,.w,,--,
w,rm -,
,,,,-r-m wa,w---
<c,er,,.
y
,--,~,4,-ws..
-,.--n+m--
y.g,--sm,
, - - -