Forwards Catawba Nuclear Station Diesel Engine 1A Component Revalidation Insp Final Rept Describing Insp & Evaluations Performed.Results Indicate Tdi Diesel Generators Provide Reliable Source of Backup Power
ML20092N700
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/29/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20092N701 List:
References
NUDOCS 8407030454
Download: ML20092N700 (2)


Text

- , + - .~ . - - . . - ~ _ - .

s 1

,.z  !

DUKE POWER GOMPANY l

- P.O. BOX 33189 6

' - CHARLOTTE, N.C. 28942 '

HAL B. TUCKER ' run.mynou t- ==- (704) 373-4531 j

~""

-June 29, 1984 l

Mr.LHsrold'R.:Denton, Director ,

?0ffice-of Nuclear Reactor. Regulation  :

U.C S. Nuclear Regulatory Commission ,

Washington, D.LC. 20555 -l l

-Attention: ~ Ms. E. G. Adensam, Chief  !

Licensing Branch No. 4-  !

Re: Catawba Nuclear Station-Docket Nos.-50-413 and:50-414-l

Dear.Mr. Denton:

l On; March _21, 1984' representatives from Duke Power Company met with the NRC  ;

' Staff.to discuss Duke's proposed program for resolution of the TDI diesel .

generator issue for Catawba. This' meeting, and a follow-up letter dated  !

April:5,1984, provided a detailed description of the Extended Operation Test of the Catawba 1A diesel generator and the proposed inspection plan.

4 The i_nspection program involved' extensive disassembly of the diesel'and 100%

-inspection of parts for which there was a history of problems or other reasons l for special concern. . Substantial sampling inspections were-performed on l

- .other important, parts where there was no history of problems._ A preliminary i report detailing the status of the component revalidation inspection program

~

was prepared by Duke and submitted to the NRC on June 1, 1984. 'This' report.

9 icovered the-results of over 76% of total inspections to be performed. Rep-  :

resentatives from Duke met with the NRC Staff on June 21,'1984 to discuss.

.these inspection ~results.

Inspection of the.1 A diesel is"now ' complete, except for. a few inspections s

n that must be performed during or. following engine reassembly. The attached

' report describes the results of the inspections and evaluations performed. i

'This report addresses over 99% of-the inspection plan which includes about 'I

~

~4,800fseparate inspections.--Results_of remaining inspections during engine .,

._ reassembly will.be documented in the Owners Group Phase II program. ,

b As a result of the Extended Operation Test of the Catawba 1A diesel generator l

and the extensive. inspections conducted, it is concluded that TDI diesel ,
generators installed at Catawba will provide a reliable source of backup power. t Very? truly yours, e4Ab c &

.Hal'B. Tucker ROS/php j l ; , ' M;C u

D 0

n i Mr.. Harold.R. Denton,' Director i fJune 29,1984 i

-Page:2' f

i cc: Mr. James-P. O'Reilly, Regional Administrator-

. U. S. Nuclear Regulatory Commission

-Region II f

-101:Marietta Street, NW,: Suite 2900 Atlanta ,' Georgia- 30323  :

~ NRC Resident Inspector .

Catawba Nuclear Station t Robert Guild, Esq. I'

- ' Attorney-at-Law

< P.' O. Box 12097 .

Charleston, South Carolina 29412 l

-- Palmetto Alliance ,

~ 21351 Devine Street Columbia, South Carolina 29205 j Mr. Jesse L. Riley.-- i

~

Carolina Environmental Study Group

, 854 Henley Place Charlotte, North Carolina 28207 '

t-0

  • ~

?

+  ;

I I

~

l 2

, i t

A i ,

1

)

?

, a .- ,,._. .- , . -- --- - --eg,~ . ,,, ,c,. .. mare-~,.,-,.w,,--, w ,rm - , ,,,,-r-m wa,w--- <c,er , ,. y ,--,~,4,-ws.. -,.--n+m-- y.g,--sm, , - - -