Forwards Catawba Nuclear Station Diesel Engine 1A Component Revalidation Insp Final Rept Describing Insp & Evaluations Performed.Results Indicate Tdi Diesel Generators Provide Reliable Source of Backup Power
ML20092N700
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/29/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20092N701 List:
References
NUDOCS 8407030454
Download: ML20092N700 (2)


Text

-

+ -.~

~ _ -.

s 1

,.z DUKE POWER GOMPANY l

P.O. BOX 33189 6

CHARLOTTE, N.C. 28942 HAL B. TUCKER '

run.mynou (704) 373-4531 j

t-==-

~""

-June 29, 1984 l

Mr.LHsrold'R.:Denton, Director

?0ffice-of Nuclear Reactor. Regulation U.C S. Nuclear Regulatory Commission Washington, D.LC. 20555

-l l

-Attention: ~ Ms. E. G. Adensam, Chief

Licensing Branch No. 4-Re: Catawba Nuclear Station-Docket Nos.-50-413 and:50-414-l

Dear.Mr. Denton:

l On; March _21, 1984' representatives from Duke Power Company met with the NRC

' Staff.to discuss Duke's proposed program for resolution of the TDI diesel generator issue for Catawba. This' meeting, and a follow-up letter dated

April:5,1984, provided a detailed description of the Extended Operation Test of the Catawba 1A diesel generator and the proposed inspection plan.

The i_nspection program involved' extensive disassembly of the diesel'and 100%

4

-inspection of parts for which there was a history of problems or other reasons l

for special concern.. Substantial sampling inspections were-performed on l

.other important, parts where there was no history of problems._ A preliminary i

report detailing the status of the component revalidation inspection program

~

was prepared by Duke and submitted to the NRC on June 1, 1984. 'This' report.

9 icovered the-results of over 76% of total inspections to be performed. Rep-

resentatives from Duke met with the NRC Staff on June 21,'1984 to discuss.

.these inspection ~results.

Inspection of the.1 A diesel is"now ' complete, except for. a few inspections s

n that must be performed during or. following engine reassembly. The attached

' report describes the results of the inspections and evaluations performed.

i

'This report addresses over 99% of-the inspection plan which includes about

'I

~

~4,800fseparate inspections.--Results_of remaining inspections during engine

._ reassembly will.be documented in the Owners Group Phase II program.

b As a result of the Extended Operation Test of the Catawba 1A diesel generator l

and the extensive. inspections conducted, it is concluded that TDI diesel
generators installed at Catawba will provide a reliable source of backup power.

t Very? truly yours, e4Ab c &

.Hal'B. Tucker ROS/php j

l ;, ' M;C u

D 0

n i

Mr.. Harold.R. Denton,' Director i

fJune 29,1984 i

-Page:2' f

i cc: Mr. James-P. O'Reilly, Regional Administrator-

... U. S. Nuclear Regulatory Commission

-Region II f

-101:Marietta Street, NW,: Suite 2900 Atlanta,' Georgia-30323

~ NRC Resident Inspector

Catawba Nuclear Station t

Robert Guild, Esq.

I'

- ' Attorney-at-Law P.' O. Box 12097 Charleston, South Carolina 29412 l

-- Palmetto Alliance

~ 21351 Devine Street Columbia, South Carolina 29205 j

Mr. Jesse L. Riley.--

i Carolina Environmental Study Group 854 Henley Place

~

Charlotte, North Carolina 28207 t-0

~

?

+

I I

~

l 2

i t

A i 1

)

?

a

--eg,~

,c,.

.. mare-~,.,-,.w,,--,

w,rm -,

,,,,-r-m wa,w---

<c,er,,.

y

,--,~,4,-ws..

-,.--n+m--

y.g,--sm,

, - - -