ML20092M595

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-77 Re Concrete Pour Containing Honeycombed Concrete.Initially Reported on 831109.Final Rept Submittal Date Extended to 840801
ML20092M595
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/19/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29775-TDS, DER-83-77, NUDOCS 8407020316
Download: ML20092M595 (2)


Text

.

- dh L

dECBVED 8GC Arizona Public Service Company im JUN 25 FM 2: 33 June 19, 1984 ANPP-29775-TDS/TRB U.-S. Nuclear: Regulatory Commission Region V Creekside Oaks Office Park-1450 Maria Lane - Suite 210 Walnut Creek; CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects.and Engineering Programs

Subject:

Time Extension For Report - DER 83-77 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 2 Concrete Pour Contains Honey-Combed Concrete File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and K. Parrish on November.9, 1983 (B) ANPP-28359, dated December 6, 1983~(Interim Report)

(C) ANPP-28773, dated February 1,1984 (Time Extension)

(D) ANPP-29456,-dated May 8, 1984 (Time Extension)

Dear Sir:

The-NRC was notified of a potentially reportable deficiency in Reference (A), an_ Interim Report was tr'ansmitted by Reference (B) and

. Time Extensions were requested by References-(C) and (D). At that time, it_was estimated that a Final Report would be available by June 22, 1984.

A Final' Report has been submitted to APS for review. ~ A Final Report is

. estimated to be submitted for NRC review by August 1, 1984.

_Very truly yours, g

n LR E. E. Van Brunt,_Jr.

APS Vice President

~

' Nuclear Production ANPP Project Director

'EEVB/TRB:db i

cc: See Page Two i'

8407020316 840619

^

lDRADOCK 05000529 L

l PDR g

e

[

EE-27

Mr. T..W. Bishop DER 83-77 i

Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u

Washington, D. C. 20555 T. G. Woods,~Jr.

D. B. Karner W. E. Ide.

D. B. Fasnacht

'A. C. Rogers L. A. Souza D.' E. Fow.'.er T.

D.~ Shriver C. N..Russo J. Vorees

-J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W.'G. Bingham R. L. Patterson R. W. Welcher

- H. D. Foster D. R.-Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self i

D. Canady T. D. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339