TNRC-8415 TEXAS UTILITIES GENERATING COMPANY F. o. sox 2300. cLEN ROSE, TEXAS 76043 J. C. KUYKENDALL May 25, 1984 MANAGER NUCLEAR OPERATmNS f
r f - Y$ h*N gro - pys/&4'-/7 2@20W2 Y
)!
MAY 2 S l00,1 Mr. Eric Johnson Region IV j
U. S. Nuclear Regulatory Commission 611 Ryan-Plaza Drive, Suite 1000 Arlington, Texas 76011
Subject:
Scheduled Completion Dates for NRC Emergency Plan Appraisal Appendix A Items
Dear Mr. Johnson:
~
i Attached is an updated (May 25, 1984) status list of Appendix A Open Items.
Some items have been completed and we would like to extend the dates of a
some others.
If you have any questions or require additional information, please contact Mr. Jay:Laughlin at (817) 897-4856, extension 3756.
Sincerely,y
/
l2%
JCKg1m1
~
Attachment-4 9
~
/po<
8407020284 840525 1
e PDR ADOCK 05000445 F
~
-. ~
7 e
".., ' ~. '..
~
- ?!),1.;
- H Raviced' 5/25/84 SCHEDULEDICOMPLETION DATES.FOR
{
v '
..NRC EP APPRAISAL APPENDIX A ITEMS ~
r i: P
' Scheduled.
Item Numbersa Item Completion Date>
1 i
- 445/8333-01
' Docket;the CEMPIand. corporate emergency plantipro-Complete f
?446/8317-01 icedures (CEPPs), or' delete the CEMP and incorporate-
~
i its provisions :into the CPSES emergencyL plan. -
i 445/8333-09..
IRevise'the emergency plan to include augmentation of 8/17/84 l.
~
~
f446/8317-09,
' emergency personnel:as.specified in NUREG-0654,.
l
' ~
' Revision 1, Table B-1, and provide _a method to-verify that there isi.a--reasonable' assurance that
~
,the augmentation. times can be met for the speci-
,fied minimum augmentation staff.-
[
N 1445/8333 Pursuant to the requirements of.NUREG-0737, Sup-
'6/29/84 l
L446/8317 -18 ~
. plement 1 Jand the' guidance contained in Regula-tory Guide:1.97, Table 2,;the applicant shall complete.the installation ~of. instrumentation in the control room toLassees plant ~and envircnmental-conditions duringLand following an accident..
+
i
~1 1445/8333-19' Complete training and qualification of control 9/7/84 j
s'
- 446/8317-19 room' personnel on all equipment used in-.the'de-h[,
tection," classification, notification, and. pro--
- tective' action assessment and recommendation-i prep' ration..
[
a r
i44'5/8333 Sufficient alternate.or backup power systems shall Complete l
,446/8317-281-
<be.provided to' maintain ~continuityz of TSC functions and to.immediately resume data acquisition storage, I
and. display ifiloss 'of : primary?TSC power occurss
~
- 445/8333-29 TSC radiation monitoring systems and the SPDS thct 9/7/84-x ; 446/8317--29 are;used for' emergency detection, classification, j
and assessment must.be fully installed,; tested,
-and made' operational..
(
[445/8333-30' TSC data L 11ection and evaluation systems'(RM-21) 8/31/84 g
(446/8317-30 that are used.in. accident _ assessment'and genera--
j tion of' protective action recommendation must be F
p
~
g fully.. installed, tested and made' operational.
le 144'5/8333-31 Emergency notification systems must be fully in-Complete' l
14.46/8317-31
' stalled, tested and made opera:ional.
l i
~
Vertical bar.on righthand margin indicates change e.g. item completed or scheduled completion date revised.
~
(1.
i
I
- ,.i Revisad 5/25/84 SCHEDULED COMPLETION DATES FOR NRC EP APPRAISAL APPENDIX A ITEMS
'i-Scheduled Item Numbers Item Completion Date l
'445/8333-32 Complete training and qualification of TSC person-9/7/84
'446/8317-32 nel on all equipment used in the classification, notification, and protective action assessment and recommendation preparation.
W
' The SPDS and the RM-21 that are used in the acci-8/31/84 1445/8333-38 446/8317-38 dent assessment and. generation of protective action recommmendations must be' fully installed, tested, and made. operational in the EOF.
l 445/8333-39
' Emergency notification systens (ENS ~and automatic Complete J446/8317-39
- ringdown) must be fully installed, tested and made operational..
445-8333-40 Complete, training and qualification of EOF person-9/7/84
~446/8317-40 nel on all equipment used in the classification, i
notification and protective action assessment and recommendation preparation.
2445/8333-43 Complete and test the gas sampling rig for high-Complete i
'~
- 446/8317-43 level grab samples from the vent' stack and dem-onstrate by drill or exercise that sampling and analysis can be complet'ed'in three (3) hours or
{
.less.
g:
1445/8333-50 Provide an operational decontamination facility Complete 1446/8317-50
.with' communications at the health physics control i
+
point and provide towels, communications and de-contamination agents and NOSF decontamination fac-
'I
- ility.1 445/8333-60 Following the transfer of ARMS and PRMS:from the 8/31/84 I
L446/8317-60;
. vendor to the applicant, the applicant shall con -
i firm proper-instrument: maintenance, adequacy of_
l i
u -
operation, calibration checks, and prompt repair.
or.. replacement of inoperable instrumentation.
- 445/8333-65.
Complete. implementation of inspection, maintanance 7/16/84 446/8317-65, Land calibration procedures and provide appropriate
^
documentation of the new onsite meteorological measurements program, including identification of
- sensor types and spe'cifications, data reduction procedures, and determination of systen accuracies (compared to Reg. Guide 1.23) for staff review; also, provide inspection. maintenance and calibra-tion procedures for staff review as these are de-veloped and approved.-
e
iyl, ' j'.
Ravistd 5/25/84 SCHEDULED COMPLETION DATES FOR
-NRC EP APPRAISAL APPENDIX A ITEMS r
Scheduled
" Item Numbers Item Completion Date
'445/8333-66 Improve the-display of vertical temperature grad-7/16/84 446/8317-66:
ient in the' control. room by ~ installing charts with appropriate resolution.
- 445/8333-67' Modify EPP-302 to _ reflect :the information available Complete 446/8317 from the onsite meteorological measurements program 4
- and specify the averaging time (15 minutes);
clearly establish the sources for.the hierarchy of substitution of meteor. logical data; eliminate cumbersome and/or poorly documented procedures; and' include specific provisions for updates.
.445'/8333-68 Provide a complete _ description of the arrangements 7/16/84
}446/8317-68
made withithe NWS to provide _ regional meteorological
. data > including. identification of the information to be-provided and the mechanism for; obtaining. updates 7
.of this'information.,
< 445/8333-69..
Provide equipment and/or-procedures for passive.
Complete-446/8317-69 notification of control. room shift personnel of' 1
severe weather conditions affecting or likely to affect the site.
1445/8333-84 Issue and approved EPP to control the use of'dedi-6/29/84 446/8317-84.
cated emergency vehicles with offroad capability
- which also provides protection for all transported Lemergency equipment and' instruments during adverse weather.
t 445/8333-89 Pursuant to the requirements of 10CFR50, Appendix Complete 1446/8317-89 E,(IV).(c), the applicant shall revise the emerg-ency plan and the EPP's to correctly differentiate
- between emergency classes and EAL's.
[445/8333-90--
Pursuant to the reqit'. cements of 10CFR50, Appendix Complete 446/8317-90:
E (IV).(c), the applicant shall. complete'as neces-usary readings from plant sensors that form the data L
sets of EAL's.
1445/8333-114' An evacuation notification system must be provided Complete 1446/8317-114; which can be detected by all persons in. owner-con-trolled areas including outdoor areas and the Ad-ministration Annex Building.
i i
5
__1.
7
..t,'..
4
,'.,7.;
Revissd f
5/25/84 i
4
-SCHEDULED COMPLETION DATES FOR
.NRC.EP APPRAISAL APPENDIX A ITEMS Scheduled
, Item Numbers-Item Completion Date i445/8333-115 Site-evacuation routes must be developed and the 7/27/84 1446/8317-115 applicant-shall provide a means to ensure that all personnel are aware of the' routes in an emergency.
c445/8333-116 Complete, implement and test a personnel accounta-8/21/84
- 446/8317-116
-bility system.
'445/8333-130 Complete the dissemination of emergency information Complete 1446/8317-130 to'the transient population.
445/8333-132-Conduct' additional training for control rooom per-6/29/84 446/8317-132'
.sonnel to ensure adequate knowledge of plant'oper-ating and emergency procedures and to-stress the e
requirement for compliance with~ procedures.
445/8333-133.
Condtict additional practica1' training for control 6/29/84
.446/8317-133-room personnel in emergency classification, empha-
-sizing EAL sets which have multiple conditions, to y-ensure that the watch: organization is able to dem-onstrate prompt and correct emergency classifica-tion skills.
445/8333-137
- Drills whichT require the use of EPP-302 should be 6/29/84,
1446/8317-137 conducted to improve.the efficiency by which the
-dose projection calculations are performed.
^
~445/8333-138 Train appropriate emergency response personnel ~on 9/7/84 446/8317-138-
-dose projection calculation. methods using-the RM-11 and RM-21 systems.-
~
1445/8333-139 Conduct practical drills with shift supervisors in 6/29/84 446/8317-139:
implementing the requirements of EPP-304 based on dose assessments and in communicating the results-of such' determinations to appropriate authorities.
Y l'-