JOSEPH M. FARLEY NUCLEAR PLANT UNIT.1
. NARRATIVE'
SUMMARY
OF OPERATIONS May, 1984
_.During the~ period May 1 - May 8, the. unit was in the process of
(
~
escalating to_100% power after the Cycle V-VI refueling outage.
Otherwise, there were no unit shutdowns or significant power reductions during the' month.of May.
'The following major safety-related maintenance-was performed in the-month of-May:
-1.
Performed: miscellaneous maintenance on diesel generators.
9
+
i i
8407020106 840608
" ij PDR ADOCK 05000348 j
.R pop
c t
OPERATING DATA REPORT DOCKET NO. 50-348 DATE June 6 1984 COMPLETED BY U.G. Hairs ton, III TELEPHONE (205)noo-5156 OPERATING STATUS ~
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes 2.' Reporting Period:
May, 1984 1)
Cumulative data since 2652 12-1-77, date of
. 3. Licensed Thermal Power (MWt):
-860 commercial operat1,on.
- 4. Nameplate Raling (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
841.8
- 6. Maximum Dependable Capacity (Gross MWe):
7; Maximum Dependable Capacity (Net MWe):
797.1
- 8. If Changes Occur in Capacity Ratirigs (items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe): N/A il0. Reasons For Restrictio'ns,If Any: N/A This Month Yr. to.Date Cddtulative
~ 11. Hours in Reporting Period 744 3.647 56.975
- 12. Number Of Hours Reactor Was Critical 744.0 1.868.8' 36.992.0
- 13. It. actor Reserve Shutdown Hours 0.0 0.0-3,650.7
- 14.~ Hours Generator On-Line 744.O~
1.784.O
'15.887.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0
' O.0
' 16. Gross Thermal Energy Generated (M%:I) 1.807,741 4.292,583 90,394.109
- 17. Gross Electrical Energy Generated (MWH) 587,158 1,373,972 28,716,9 82
.18. Net Electrical Energy Generated (MWH) 556,294 1.277.692 ;.26.978.754
- 19. Unit Service Factor 100.0 48.9 63.0
- 20. Unit Availability Factor 100.0 48.9 63.0
- 21. Unit Capacity Factor (Using MDC Net) 93.8 44.0 59.4
' 22. Unit Capacity Factor (Using DER Net) 90.2 42.3 57.1
- 23. Unit Forced Outage Rate 0.0 4.3 14.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
N/A i
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
~
- 26. Units in Test Status (Prior to Commercial Operation):
Forecass Achiesed INITIA L CRITICALITY 8-6-77 8-9-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12 77-
-^
(9/i ' I i-
DOCTITNO.
50-348 I
UNIT DATE June 6, 1984 COMPLETED BY u.c.h4rston. III TELiPHONE (205)899-5156 May, ' 1984 -
410NT11
- DAY
. AVERACE DAILY POIV'IR LEVEL' AVERAGE DAILY POWER LEVEL DAY (MWe Net)
(5tWe Net) 344-g, 17 828 343 13 878 2
3_
19 827 334 4
463 20 n??
818
-619 21 3
6 623-22 nia
~
817
-7 725-23 814 24 815
-'g 9;23-814 829 10:
829 26 815
,Ig_
826'
.27 814
- g2 _
827 3
816
- j3 823 3
81 7 821 30 826
['
14 gg:
826' 33 826 r.
16-829-r I?GUCriONS On this form:t. list the sverage daily unit power !cvelin MWe Net for each day in the reporting month. Campute to the neare:t whole rneg: watt.
(9p7) t l
-w e
Y DOCKET NOy. 50-348 -
. UPHT SilU1 DOWNS AND POWER REDUC 110NS -
UNIT NAME J.M.Farlev - Unit ;l
'DATE-Tim a 6; 19 at.
REPORT MONTil May, 19 84 COMPLETEU BY - W.C.Hairston. III TELEPilONE (200 A99-5156
. w.
E E-
.$ E '
}
$ E' 5 Liccusee
,E-r,
{'q,
- Cause & Corrective Nu.x Date g
3g jj5 Event D
o-]
Action io g$ E 5
j@g Report
- H mu Prevent Recurrence 6
There Were' No Unit Shutdowns Or Sign :ficant Power Reductic ns In Ihe Month af.May.
i i-a 1
1 2
3 4
I: 1 orted Iteason:
Mettu>d:
Extiibit G Instruciions i
I S: Scheduled A l'.quipinent Failure (Explain) '
I-Manual for Preparation of D.ita ll Maintenance of Test
- 2. Manual Scrain.
Entry Sheets l'or I.icensee C itefueling 3-Autoinalic Sciain.
Escut ReporI (1.ERI File INUltt:G-D llegulatosy Restriction -
4 Other (Explain) 0161)
I: Operator Tsaining A 1.icense Exantination F Adniinisisative 5
G Opciational Linst (Explain)
Exhibil 1 Same Source 19/U) 11 Othei (Explain)
, -