ML20092J811
| ML20092J811 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/19/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20092J814 | List: |
| References | |
| NUDOCS 9509250033 | |
| Download: ML20092J811 (3) | |
Text
Station Support Departmont 10 CFR 50.55a(a)(3)
.e 4
-y PECO ENERGY
" - - a ~ "<
c Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 September 19,1995 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Ccmmission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Additional information Concerning the Proposed Alternative Repair Plan in Accordance with 10 CFR 50.55a(a)(3)
References:
1.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to U. S. Nucleu Regulatory Commission (USNRC), dated September 16,1994 2.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated September 26,1994 3.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated l
February 14,1995 4.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated June 22,1995 5.
Letter from J. W. Shea (USNRC) to G. A. Hunger, Jr. (PECO Energy Company), dated July 27,1995 6.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated August 17,1995 7.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated August 28,1995 8.
Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated Ceptember 5,1995
Dear Sir:
In the above Referenced letters, PECO Energy Company supplied information regarding the approval of a proposed repair plan for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 core shroud, in accordance with 10 CFR 50.55a(a)(3), in the event that such a repair is determined to be necessary, bbOb32 k'd i 9509250033 950919 l
I PDR ADOCK 05000277
. P...
__ PDR
Sept:mber 18,1995 Pag 2 2
. to this letter contains additional Information supporting this request. Attachment 1 contains the " Core Spray Line Tee-Box Analysis Report for Peach Bottom Atomic Power Station, Unit 3 Modification P00541," dated September 15,1995.
If you have any questions, please contact us.
Very truly yours, llX. d U
f G. A. Hunger, Jr.,
Director - Licensing Attachment cc:
T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS
1 g
e e
e ATTACHMENT 1 i
.