ML20092J811

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re Proposed Alternative Repair Plan Per 10CFR50.55a(a)(3) & Core Spray Line Tee-Box Analysis Rept for Peach Bottom Atomic Power Station Unit 3
ML20092J811
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/19/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092J814 List:
References
NUDOCS 9509250033
Download: ML20092J811 (3)


Text

Station Support Departmont

,. .e -

4 10 CFR 50.55a(a)(3)

-y

" - - a c~ "<

PECO ENERGY Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 September 19,1995 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Ccmmission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Additional information Concerning the Proposed Alternative Repair Plan in Accordance with 10 CFR 50.55a(a)(3)

References:

1. Letter from G. A. Hunger, Jr. (PECO Energy Company) to U. S. Nucleu Regulatory Commission (USNRC), dated September 16,1994
2. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated September 26,1994
3. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated l February 14,1995
4. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated June 22,1995
5. Letter from J. W. Shea (USNRC) to G. A. Hunger, Jr. (PECO Energy Company), dated July 27,1995
6. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated August 17,1995
7. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated August 28,1995
8. Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC, dated  ;

Ceptember 5,1995 l

Dear Sir:

In the above Referenced letters, PECO Energy Company supplied information regarding the approval of a proposed repair plan for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 core shroud, in accordance with 10 CFR 50.55a(a)(3), in the event that such a repair is determined to be necessary, bbOb32 . k'd i 9509250033 950919 '

l I

PDR ADOCK 05000277

. P ... - . . . _ _ _ __ PDR

Sept:mber 18,1995 Pag 2 2 Attachment 1 to this letter contains additional Information supporting this request. Attachment 1 contains the " Core Spray Line Tee-Box Analysis Report for Peach Bottom Atomic Power Station, Unit 3 Modification P00541," dated September 15,1995.

If you have any questions, please contact us.

Very truly yours, llX. d U f G. A. Hunger, Jr.,

Director - Licensing Attachment cc: T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS

1 g e

  • I e

e ATTACHMENT 1 I

i

_