ML20092J562

From kanterella
Jump to navigation Jump to search
Amends 98 & 100 to Licenses DPR-44 & DPR-56,respectively, Permitting Hourly Watch Where Operable Fire Detectors Exist, in Event of Nonfunctional Fire Barrier Penetrations
ML20092J562
Person / Time
Site: Peach Bottom  
Issue date: 06/20/1984
From: Rivenbark G
Office of Nuclear Reactor Regulation
To:
Atlantic City Electric Co, Delmarva Power & Light Co, Philadelphia Electric Co, Public Service Electric & Gas Co
Shared Package
ML20092J567 List:
References
DPR-44-A-098, DPR-56-A-100 NUDOCS 8406260507
Download: ML20092J562 (8)


Text

gf 8 RfGg

  • 8[j '

Io, UNITED STATES 7

NUCLEAR REGULATORY COMMISSION 3

%*1

.'.E WASHINGTON, D. C. 20555

\\ +%

/

PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY, DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 98 License No. DPR-44 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated March 16, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have,

been satisfied.

2 Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-44 is hereby

)

amended to read as follows:

8406260507 840620 PDR ADOCK 05000277 P

PDR

Technical Specifications The Technical Specifications contained in Appendices

- A and B, as revised through Amendment No. 98, are hereby incorporated in the license. PEC0 shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Yr?yz/On.ll-</;:.Q

/

George W. Rivenbark, Acting Chief Operating Reactors Branch No. 4 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: June 20, 1984 l

ATTACHMENT TO LICENSE AMENDMENT NO. 98 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

Remove Insert 240j 240j i

4 4

i 4

i

' ~

e Unit 2 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.14.D Fire Barrier Penetrations 4.14.D Fire Barrier Penetrations

1. Fire barrier penetrations ~ including 1. Visual inspection of pene-cable penetration barriers, fire tration fire barriers doors and fire dampers, protecting shall be performed following the following areas shall be repairs or maintenance and f unctional* :

at least once per 18 months.

1) Cable Spreading Room
2) Emergency Switchgear Rooms
3) Diesel Generator Rooms
4) Battery Rooms
5) Control Room
2. All fire barrier penetrations including cable penetration barriers, fire doors and fire dampers separating portions of safety related systems, required to ensure safe shutdown capability shall be functional.**

3.

If the requirements of 3.14.D 1 or 3.14.D.2 cannot be met, within one hour establish a continuous fire watch on at least one side,

of the affected fire barrier, or verify the operability of fire detectors on at least one side of the inoperable fire barrier and establish an hourly fire watch patrol.

Reactor startup and continued reactor, operation is

. permissible.

i Delete when the provisions of 3.14.D.2 become ef f ective.

Effective upon return to power following the Unit 2 refueling outage commencing in 1984.

b

~

~

Amendeent -No. 7), pp, 98

pa

  • touq'o

[g *737 j

NUCLEAR REGULATORY COMMISSION UNITED STATES

p ap WASHINGTON, D. C. 20555 g,.

f PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT N0. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 100 License No. DPR-56 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated March 16, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicateo in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

1 l

2-Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.100, are hereby incorporated in the license.

PEC0 shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION hxc[G'/\\;;<t. =~A george;W.Rivenbark,ActingChief Operating Reactors Branch No. 4 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: June 20, 1984 e

I w

ATTACHMENT TO LICENSE AMENDMENT N0.100 FACILITY OPERATING LICENSE N0. DPR-56 DOCKET NO. 50-278 Replace the following pa with the enclosed page. ge of the Appendix "A" Technical Specifications The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

Remove Insert 240j 240j e

i e

~

Uhit 3 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.14.D Fire Barrier Penetrations 4.14.D Fire Barrier Penetrations

1. Fire barrier penetrations including 1. Visual inspection of pene-cable penetration barriers, fire tration fire barriers doors and fire dampers, protecting shall be performed following the following areas shall be repairs or maintenance and functional *:

at least once per 18 months.

1) Cable Spreading Room
2) Emergency Switchgear Rooms
3) Diesel Generator Rooms
4) Battery Rooms
5) Control Room
2. All fire barrier penetrations including cable penetration barriers, fire doors and fire dampers separating portions of safety related systems, required to ensure safe shutdown capability shall be functional.**
3. If the requirements of 3.14.D.1 or 3.14.D.2 cannot be met, within one hour establish a continuous fire watch on at least one side of the affected fire barrier, or.

verify the operability of fire detectors on at least one side of the inoperable fire barrier and establish an hourly fire watch patrol.

Reactor startup and continued reactor operation is permissible, Delete when the provisions of 3.14.D.2 become effective.

Effective on Unit 3,upon completion of licensee's fire barrier upgrade program, or September 15, 1984, whichever comes first.

i s

Amendment No. sljl, pf, 100

-240j-

_ _ _ - _. _ - _ - - - - - - - - - - - - - - -