Text
e cuce i
g k
UNITED STATES B
NUCLEAR REGULATORY COMMISSION 5
f WASHINGTON, D.C. 2006fA001
,o SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUMMER NUCLEAR STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 128 License No. NPF-12 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by South Carolina Electric & Gas Company (the licensee), dated July 28, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.
NPF-12 is hereby amended to read as follows:
i 9509210347 950918 -
PDR ADOCK 05000395 P
pon
y A
\\ (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 128, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
South Carolina Electric & Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Frederick J. Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 18, 1995 1
a a
b
4 ATTACHMENT TO LICENSE AMENDMENT NO. 128 TO FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revisions are indicated by marginal lines.
Remove Paaes Insert Paaes 3/4 3-36 3/4 3-36 3/4 3-40 3/4 3-40 i
^-
TABLE 4.3-2 (Continued)
E ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION h
SURVEILLANCE REQUIREMENTS TRIP g
ANALOG ACTUATING MODES FOR CHANNEL DEVICE MASTER SLAVE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE FUNCTIONAL UNIT CHECK CAllBRATION TEST TEST LOGIC TEST TEST TEST 15 REQUIRED 3.
CONTAINMENTISOLATION
- a. Phase "A" Isolation
- 1) Manual N.A.
N.A.
N.A.
R N.A.
N.A.
N.A.
1,2,3,4
- 2) Safetyinjection See 1 above for all Safety injection Surveillance Requirements.
- 3) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
M(1)
'Q 1,2,3,4 Logicand Actuation u.
Relays s~
y
- b. Phase "B" Isolation u*
- 1) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
M(1)
Q 1,2,3,4 Logicand Actuation Relays
- 2) ReactorBuilding S
R Q
NA.
N.A.
N.A.
N.A.
1,2,3 Pressure-High-3
- c. Purge and ExhaustIsolation
- 1) Automatic Actuation N.A.
N.A.
N.A.
N.A.
M(1)
M(1)
Q(2) 1, 2, 3, 4 Logic and Actuation
(
Relays
- s k
- 2) ContainmentRadio-S R
M N.A.
N.A.
N.A.
N.A.
1,2,3,4 g
activity-High i
,E
- 3) Safetyinjection See 1 above for all Safety injection Surveillance Requirements.
E t
o I
W l
d INSTRUMENTATION TABLE 4.3-2 (Continued)
TABLE NOTATION (1)
. Each train shall be tested at least every 62 days on a STAGGERED TEST
- BASIS, (2)
The 36 inch containment purge supply and exhaust isolation valves are sealed closed during Modes 1 through 4, as required by TS 3.6.1.7. With these valves sealed closed, their ability to open is defeated; therefore, they.
are excluded from the quarterly slave relay test.
l 1
1 a
SUMMER -UNIT I 3/4 3-40 Amendment No.128
-