Special Rept:On 920110,channel 11 of Vibration & Loose Parts Monitoring Sys Declared Inoperable Due to 60 Hx Noise on Channel & Not Returned to Operability for More than 30 Days.Caused by Grounding Problem W/Cable
ML20092H823
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/12/1992
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202210372
Download: ML20092H823 (2)


Text

il' il I

s e

ikkf f%vt COT +any At S Tmm.

Cataa M Nwle.tr Generahoru [kpartment l'ue h nident 4MO Cr?Kurd khait (803)!.11J20$ Offier

' hek K297d (803)&t13126in DUKEPOWER February 12,1992 U. S. Nuclear Regulatory Commission NITN: Document Control Desk Washington, DC 20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Special Report i

Vibration and Loose Parts Monitoring System Pursuant to Technical Specification 3.3.3.9, find attached a Special Report concerning the inoperability of the Unit 2 Vibration and Loose Parts Monitoring System-Channel 11 (Stcam Generator C).

Very truly yours, C

f MDb.w~

M. S. Tuckman LRL/SR21292.SGC Attachment xc: S. D. Ebneter Regional Administrator, Region 11 R. E. Martin, ONRR W. T. Orders Senior Resident Inspector L-j$$22ggoh 0 k#

S ZE 2.2.

,w,,wun l-

' ' In i

~

~ - -,. -

.) '

SPECIAL REPORT -

CATAW13A NUCLEAR STATION, UNIT 2

- Vibration and Loose Parts Monitoring System Channel 11-1 On January 10, 1992 Channel ll (Steam Generator C) of the Vibration and Loose Parts Monitoring System was declared inoperable due to a 60 liz noise on the channel. A grounding problem.with the cable is suspected to be the cause. A work request has been written to repair the channel during a future outage of sufficient length. This is being scheduled for an outage because a containment entry is necessary to make the repair.

Channel 7, which is the other Steam Generator C channel, is functioning and provides coverage.

Since the channel has been inoperable for more than 30 days, it is reportable to _the NRC pursuant to Technical Specification 3.3.3.9.