Georgia Power Co Fourth Suppl Response to AL Mosbaugh Third Set of Interrogatories & Request for Documents.* Related Correspondence
ML20092H768
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/13/1995
From: Lamberski J
GEORGIA POWER CO., TROUTMANSANDERS (FORMERLY TROUTMAN, SANDERS, LOCKERMA
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20092H771 List:
References
CON-#395-17107 93-671-01-OLA-3, 93-671-1-OLA-3, OLA-3, NUDOCS 9509210177
Download: ML20092H768 (2)


Text

-

)7/67 U DOCKETED SepteSM3,1995 UNITED STATES OF AMERICA '95 SEP 13 PS :26 NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY Before the Atomic Safety and Licensing BoardDOCKETING & SERVICE BRANCH

)

In the Matter of ) Docket Nos. 50-424-OLA-3

) 50-425-OLA-3 GEORGIA POWER COMPANY, )

etal. ) Re: License Amendment

) (Transfer to Southern (Vogtle Electric Generating ) Nuclear)

Plant, Units I and 2) )

) ASLBP No. 93-671-01-OLA-3 GEORGIA POWER COMPANY'S FOURTH SUPPLEMENTAL RESPONSE TO ALLEN L. MOSBAUGH'S THIRD SET OF ,

INTERROGATORIES AND REOUEST FOR DOCUMENTS

1. INTRODUCTION Georgia Power Company (" Georgia Power") hereby provides a supplemental response to Allen L. Mosbaugh's Third Set of Interrogatories and Request for Documents to Georgia Power, dated May 17,1994 (the " Third Request"). Specifically, this response revises l I

Georgia Power's prior response to Interrogatory No. 6.' The majority of the information contained in the revised table attached to this response is already available to the Board and the parties in Intervenor's Demonstrative Aid No. 4.2 Georgia Power incorporates herein all

' Intervenor has expressed a desire to move this response into evidence. Tr. 12848-50 (Aug. 25,1995).

2 The parties made a considerable effort to make this Demonstrative Aid as accurate as possible, it provides the same basic information as Georgia Power's response to Intervenor's Interrogatory No. 6 with two notable exceptions. One, the revised table identifics, as accurately I as possible from the Maintenance Work Orders, the person who took the dew point readings.  !

Two, the Demonstrative Aid identifies all dew point readings in the 1989-1990 time frame, (continued...)

9509210177 950913 PDR ADOCK 05000424 0 PDR n g i

to the Maintenance Manager, Mr. Harvey Handfinger.7 Mr. Handfinger reported to the Assistant Plant General Manager-Operations, Mr. W. F. Kitchens. Mr. Kitchens reported to the General Manager, Mr. George Bockhold. Georgia Power is unable to state with certainty each instance where a senior official, which Georgia Power interprets to mean a Vice President or higher, received communications regarding an unsatisfactory dew point reading.

However, the Vice President-Vogtle Project, Mr. Ken McCoy, and the Senior Vice President, Mr. George Hairston, both attended the April 9,1990 meeting between Georgia Power and NRC Region II officials in Atlanta, Georgia during which the unsatisfactory dew point readings on EDG 2A were apparently discussed. See Mr. Jim Bailey's Meeting Notes l

from the April 9,1990 meeting (Bates No. 0006%). ,

l l

Dated: September 13, 1995 C) - l t, '

i e f.% '

i

[Jamds E. Joiner '

i ' John Lamberski s TROUTMAN SANDERS

' Suite $200 600 Peachtree Street, N.E.

i Atlanta, GA 30308-2216 (404) 885-3360 Ernest L. Blake David R. Lewis SHAW, PITTMAN, POTTS & TROWBRIDGE 2300 N Street, N.W.

Washington, D.C. 20337 (202) 663-8084 Counsel for Georgia Power Company f

4

' Mr. Handlinger is no longer a Georgia Power employee.

1 9

- ,,~ ,