MONTHYEARML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant ML20198J8941997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20216J6011997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Sequoyah Nuclear Plant ML20210K5781997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Sequoyah Nuclear Plant ML20141H3071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20140H1571997-05-31031 May 1997 Monthly Operating Repts for May 1997 for SQN ML20141F4321997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Sequoyah Nuclear Plant Units 1 & 2 ML20137T3011997-03-31031 March 1997 Monthly Operating Repts for March 1997 for SQN ML20136H2191997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SQN ML20134M2001997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for SQN ML20133K4861996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Sequoyah Nuclear Plant Units 1 & 2 ML20133A1121996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for SQN Plant ML20134N2501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Sequoyah Nuclear Plant ML20128Q0251996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20129C2181996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Sequoyah Nuclear Plant ML20116M1511996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Sequoyah Nuclear Plant ML20115H0371996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SQN ML20112H6351996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Sequoyah Nuclear Plant ML20112A7901996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Sequoyah Unit 1 & 2 ML20107B7591996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20101D3351996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Sequoyah Nuclear Plant ML20149K2341996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Snp ML20096F0201995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Snp ML20095J0461995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Snp ML20094L7381995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Sequoyah Nuclear Plant ML20093F5351995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Sequoyah Nuclear Plant ML20092G2981995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Sequoyah Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20205B6631999-02-28028 February 1999 Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20211A2021999-01-31031 January 1999 Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections ML20198S7301998-12-31031 December 1998 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197J5621998-12-0303 December 1998 Unit 1 Cycle 9 90-Day ISI Summary Rept ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20154H6251998-09-17017 September 1998 Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20239A0631998-08-27027 August 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 ML20236Y2091998-08-0707 August 1998 Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20237A4411998-07-31031 July 1998 Blended Uranium Lead Test Assembly Design Rept ML20236P6441998-07-10010 July 1998 LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217K4471998-04-27027 April 1998 Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2571998-01-31031 January 1998 Cycle 9 Voltage-Based Repair Criteria 90-Day Rept ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2441998-01-29029 January 1998 Snp Unit 2 Cycle Refueling Outage Oct 1997 ML20199F8531998-01-13013 January 1998 ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C2951997-11-13013 November 1997 LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant L-97-215, SG Secondary Side Loose Object Safety Evaluation1997-10-23023 October 1997 SG Secondary Side Loose Object Safety Evaluation 1999-09-30
[Table view] |
Text
l- .,
HA IeuueewwAf w,n.eom o o w,nm,p,w wrmi.e306 J L W6on w e r%nes sm,si noa, ewn February 18, 1992 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of .
) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAll NUCLEAR l'IANT (SQN) - JANUARY 1992 MONTilLY OPERATING REPORT Enclosed is the January 1992 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call H. A. Cooper at (615) 843-8924.
Sincerely, 6f J L. Wilson Enclosure cc See page 2 L
9202210343 920131 DR ADOCK0500g7
/ ( fifl
I -
U.S. Nuclear hegulatory Commission Page 2 February 18, 1992 cc (Erctosure):
1A/0 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway Suite 1500 Atlanta, Georgia 30389 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20853 Mr. Ted Marston, Director Electric Power Research Institute P.O. Box 10412 Palo Alto, California 94304 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379 Regional AdministratJon U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street. NW. Suite 2900 Atlanta, Georgia 30323 Mr. F. Yost, Director Research Services Utility Data Institute 1700 K Street, NW, Suite 400 Washington, D.C. 20006
=
- - - - - - --. _.-. ____.____.m___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____
TENNESSEE VAIJ.EY AtT1110lllTY NUCIJAR PWER GROUP SEQUOYAll NUCLEAR PLANT HON 1111.Y OPERATING llEPORT TO Tile NUClfAR REGULATORY C(rittlHSION ltBUMtL1992 t! NIT 1 DOCKET NIMilER 50-327 1.lC124!!E NU!1llER DPR-77 UNIT 2 DOCKET NIMilER 50-328 1.ICENSE NtMillUt DPR-79
I OPERATIONAL SDtKARY JANUARY 1992 UNIT 1 Unit 1 generated 874.638 megawatthours (MWh) (gross) electsital power during January with a capacity factor of 101.17 percent. Unit I was operating at approxirnately 100 percent reactor power at the end o!! January.
UNIT 2 Unit 2 generated 862.686 MWh (gross) electrical power during January with a capacity factor of 99.79 percent. Unit 2 operated at 100 percent reactor power level until January 28. 1992, at 1548 (EST). when Unit 2 entered coastdown to the Unit 2 Cycle 5 refueling outage that is scheduled to begin March 13. 1992. Unit 2 was operating at approximately 96 percent reactor power level at the end of January.
POWER-0PERATED RELIEF VALVES (PORV) AND SAFETY VALVES
SUMMARY
There were no challenges to PORVs or safety valves in January.
AVERACE IAILY UNIT TWl3t 1.EVEL DOCEET NO. ___5 0 - 3 2 7...._ __
UNIT No. .._One.__ ______ DATE _02-05-92 ____
c0MPLETED BY: Io.Jt_Ilullomon TELErl!ONEt (6151.84h7528 MONiit t JANUARL1992 AVERAGE DAILY POWER LEVEL AVERAGE DAILY F0WER LEVEL DAY TMWe-Je.tl DAY (MWe-Net). ._
1 __
1123 _ _ _ _ 17 _ _.1144_._____ ._
2 111ft 18 _ _ _ _ _ IL46 3 1126. . _ . . 19 1141__ _
4 1126__. 20 lihB-5 _._,.. _ . _ 1127___..._. _ 21 _ 114B _ _ _ _ _ _
6 ._ ______ _1 1 2 B ____ _ __ _ 22 _.._._114 8 . _ ____
7 1126 __
23 _ __._ _____1151__ ___ __._
8 112Z._.__ .. _ ___. 24 1149 _.
9 112B___. 25 1148 . . _ .
10 till 26 ___. 1149 11 112L 27 1 143 12 1132 28 __ R41 13 . _.11A0 29 11AB_
14 _ ___ _._ __l 14 2 30 ._.__._.__._1153 _
15 .__ __. __114 2 31 ___. _1150 ___
16 _ __....___.1142.. _._..._ _ _
- AVI' RAGE IMILY UNIT l'(NER LINEL DOCKET NO. ._50-328.._._ (WIT 110. ._ h o.._ _ __ _ DATE: .02-05.92_ _
COMPLETED BYt I._J J(olltcon TELEl'Il0NE _(L15)_B43-7520 MONTilt JANUARL1992 AVERAGE DAILY l'0WER LEVEL AVERAGE DAILY POWER LEVEL DAY _ . . _ . _ _ DNe rNe t L.__. DAY UN e:Ne L L___. __
1 _ . _ _ 1125 _
17 _ . - ._ _112 L _ __
2 _ 1124 18 1126__,
3 __ _112 L _ ___- 19 ~112 L___ _._.._
4 _ 1126- _ _ _
20 11g4 .
5 . . . . . _1120 __ 21 1125_ _ _ ..
6 1126 _ 22 . _ _ _ 1126 7 __ 112 L __ 23 _ _ . _ 1127. _ _ _ _
8 ___ _. 1127 ___
24 _ 1125 _ _ _ _ _
9 __- -
1126.__ _
25 1127 __
10 . _ _ _ 1125_ 26 1127 _
11 1125 27 1125 12 112h_ __
28 1118 _
13 1125 29 __ 1105 14 1125 30 1023 --_._
15 1111 31 _1089_ _ _ __.-_
16 1125
00(RA11tJG DATA k(PDki
,LO-327._. _ ..
i D00L1 H0.
DAlt ,Ithu5t.1992,._
(DHoltitD BY 1,.J._ttollowit_
1[ti N10 tit (LILL643-lbES.
Of M 11 R $1AIVS ._______
. . . . _l Notes l
- 1. tinit Name: _$ t qv ojr pl) .Un it ._One ____ _ _ _ . . . . _ _ _ . . _ l l
- 2. Reporting I'eriod: _ J e tty s tL.19 9 2_..__ _. .._ ._ _._. _ . . _ l l 3, licensed thermal power ( Wt): . 3 4 Ll . 0 __. ._ .___.__ l l
- 4. Nameplate Rating (Gross We): J ZZQ,D _ . _ __. _. _ j l S. Design tiettrical Fating (Het HJe): .1110,0 _ _ _ _ _ _ l l
- 6. Maximum Dependable Capacity (Gross H4): ..1 M g ,0. __ .._ l l
- 7. Heximum Dependable Capacity (tiet We): J 12.2,0_. . _ _
- j. . .!
- 8. If Changes Occa.* in Capacity Ratings (1 tem Humbers 3 through 7) $1nte tatt Report. Give Reasons:
- 9. power level to Which Restricted, If Any (Het itWe): _ _N A _ _ _____
- 10. Reasons for Restri tions, If Any: __ ty A_ _ _ , _ _ _ , _ _ _ _ _ _ _ _
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting period 744 144___ __.._92.009__
- 12. Number of Hours Reactor Was Crititel _144,0 _ 74410.. .4LL90A
- 13. kenttor Reserve Shutdown Hours __._ 0 _ .. _0 _ . . _ 0_ .
- 14. Huurs Generator On-line __lRD 744.0- 40.015 d_
- 15. Unit Reserve Shutdown Hours 10.__.. ___0_ _ 0_ _.
- 16. Gross thermal Energy Generated ( WH) _ Z,$19,Mid_ _Z Ll_9 MRd. _15'2J 32.270 __
- 17. Gross Electrical Energy Generated (WH) __074 J38__ __ _BM J36__ _51.5421134
- 18. Net Electrical [nergy Generated (H4t) _ _ Q45.D24 __04$ Q91_. _49 d10 420 __,
- 19. Unit Service fatter _ 10040_ _. .100 0.. __50. Z_
- 20. Unit Availability Factor _ _100,0 10010- _ 50.Z_.
- 21. tinlt Capacity Factor (Using HDC Net) JQL3 10L3._ . 4L5_
- 72. Unit Capacity Fatter (Using DEN tiet) ._ 99A _ __ ._..__9 9A . _ 401.4 _
- 23. Unit iorced Outage Rate 0.0 .040_ 41tl
- 24. Shutdowns $theduled Over Hext 6 Honths (Type. Date, and Duration of tach):
- 25. If Stut Down At ind Of Report period, tstimated Date of Startup:
l
' OttRA11tJG DATA REPOR1 DOCKL1 f40. $0-320 DATL _ f eb,_5, _199L,_
COHttillo BV h.J.Jiollomon_
lilthl0NE ($l$LB43 7$10.
OPLPAIDGJ1AjV$ _ __ _
\tiotes l
- 1. itH t flame t __$tquoyah...Unillwo . _ . . l l
- 2. Reporting Perlodt _JativerLl992 . _ _ . _ _ _ _ _ _ l l
- 3. Licensed thermal Power (HWt)! J41LD._. l l
- 4. Nameplate Rating (Gross HWe): _J?20A_ l l
$. Design Electrical Rating (tiet HWe): _1J 4 0 ,0_ _,_ __ l l
- 6. Hasimum Otpendable Capacity (Gross tide): J1FJ10 _._. l l
- 7. Maximum Dependable Capacity (tJet HWe): J12Z,_0 } .}
- 8. If Changes Occur in Capacity Ratings (Item flumbers 3 through 7) $1nce test Report. Give Reasonst
- 9. l'ower level to Which Restricted. If Any (tiet HWe): _J/A _ _ , _
- 10. Reasons f or Restrictions, If Any N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period _.144 _744 _ _ _JLM9__ __
- 12. Ilumber of Hours Reactor Was Critical ._
744,0 _ _ 14410- 49415Z_ _
- 13. Reactor Reserve Shutdown Hours 0 D_ D
- 14. Hours Generator On-Line __ 744J __._ J.441 .__.J 8..]S h 2__
- 15. Unit Reserve $hutdown Hours 04Q._ 9__. Q__
- 16. Gross Thermal Energy Generated (IMO ..Z 52h 194d.____ _L 52L794.1. JS_3,454dDL__
- 17. Gross Electrical Energy Genereted (IM O __.MZ4 005_ . _ _ 00LHL__ ___5L020 9Z7
- 18. tiet Electrical Energy Generated (HWH) _B33.52L _ _B33.52L_ _49271h40E
- 19. Unit Service factor _ IDQ.d___ 100,Q. SLL
- 20. Unit Availability f actor 100.0 10010_ SL L_
- 21. Unit Capacity Factor (Uning HDC tiet) ._ 9ho 09. 9_
. 5113 _
- 22. Unit Capacity factor (Using DER Net) _ 9LL_ Jhb_ ShL_
- 23. Unit f orced Outage Rate Q,0 0,0.. 35.1_
- 24. $hutdowns scheduled Over tient 6 Honths (Type, Date, and Duration of tach):
___ UniLZlytte_5_relvelinLovtece-.isJChtdvltddo htgiA3e.rthj)2J99hantis svtreath
_ atbeduletn_L.M:d.encubst.
- 25. If Shut Down At [nd Of Report Period, istimated cate of Startupt _t1/L _ . _ _ _ _
l
COCKET NO: 50-3E7 f., HIT MME: Hs -
1*4IT 'EJTDCWNS DC DCWER REDUCTICf45 GATE: 9 'Ci???
REPDRT t*3 NTH: :1 cars m: CCMcLE*ED Bi:T :. M T T <-J TELEM. 4Ca:E:( 5151 342-N_ZS Licensee Eause and Corrective j Nthod of i
, Event Systee C e ent Action to Dura tion Shuttino D:n n 2 Report No. Code' Code S Frevent Eecurreece No. Cate Type l
(Mcurs) Reason ReactcM eso shutdown or power reductions greater than TQ percent for a Z4 hour period to report.
l 1 2 Reason: 3 Method: bhibitG-Instructions I:F Forced f or Freparation of Cata A-Ecuipment Failure (Esplain} 1-Manual 5: Schedulad 2 3'.anual Scrary Entry sheets for Licensee B-Maintenance or Test E e t Report (LER) File C Fefueling 3-Autematic Scran M ontinuation of Esisting Outage (%;2Ery t):2}
D-Regulatory Eestruction E-Operator Training and License Examination 5-Eeducti w F-Administrative 9-Other t
- " Exhibit I-Sare Sovece G-Operational Error (Explain)
M-Other (Esplain)
O
+ y DCCKET NO: 50-33 -
LHIT MAME: Two LHIT SHUTDOWNS MD POWER RE9UCTIOrvi DATE: 02I05/92 REPORT t@lTH: January 1992 COMFLETED BY:T. J. Mellomn l- TELEPHONE:t615) 843-7529 Method of Licensee Cause and Corrective shutting Dawn Event System C:tponeat Action to Duration 5 Prevent Recurrence No. Datc Type l 2 Reactor3 Report No. Cooe# Code l
j (Hours)' l Reason No shutdown or power reductions
?reater than 10 pertent for a l 24-hour period to report.
i l l l
1 I
I i
i l
l I
l l
l l
I I
2 3Method: ExhiS>it G-Instructions I:F Forced Reason:
for Preparation of Data A-Equipment Failure (Explain) 1-Manual 5: Scheduled Entry sheets for Licensee B-Maintenance or Test 2J.anual Scram Event Report (LER) File
. C-Refueling 3-Autoratic scram D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1lZ2)
E-Operator Training and License Examinatier 5-keduction F-Administrative 9-Other 5 Exhibit I-!sne so- rce G-Operational Error (Explain)
H-Otner (Explain) .
4
,i, , = , . ..m
. . . = . .
_