Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
_ - - - - _ - _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
~
Neyv Hampshire Y7 Ted C. Feigenbosm j h President and Chici Executive Of ficer t
) '
NYN- 92019 1
February 14, 1992
.: ( . <
Q# United States Nuc ear Regulatory Commission Washington, DC 20555
, k, e.? t e nt ion: Dccument Control Desk
,: 4 NA Rofescoce: Facility Operating License NPF 86, Docket No. 50 443
Subject:
Monthly Operating Report Gentlemen:
, l'nclosed please find Monthly Operating Report 92 01. This report addresses the operating and shutdown experience relating to habrook Station Unit I for the month of January,1992 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
J Very truly yours,
[A In Ted C. Feigefibaum Enclosure TCF:ALL/act -
cc: Mr. Thomas T. Martin Regional Administrator
- United States INuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. Project Manager Project Directorate I-3 Division of Reactat Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874 9202210137 DR 920131 -
ADOCK 05000443 Ab PDR l\- ,
d 3
% Hampthire Yankee tavision of Public Service Company of New Hampshire P.O. Box 300
- Telephone (603) J74-9521 210011
. =
,. u
_}
-..g. C .
- 4.+ ,
. . .#. o .
New llampshire Yankee February 14 -1992
.i i
.t i
'i e
ll,(
t ENCLOSURE TO NYN-92019 r
' i
- s t
t-
[-
- i. .
[' ;.
1 g.
7
?
2 l -b 4:
I
...)
t f-(-
l- : 5
[^ 'c
~
- , - - , _. 2; , ^]
- ,c
)
i OPERATING DATA REPORT ,
DOCKET NO.- 50-443 ,
UNIT Seabrook i t DATE: 02/10/92 -i COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 .
(Ext. 4074) -
i,
.. OPERATING STATUS cl.- Unit Names- Seabrook Station Unit 1 I
- 2. Reporting-Period: JANUARY 1992 ,
34 Licensed Thermal Power (MWt): 3411
.4.; Nameplate-Rating.(Gross MWe): 1197. ,
- 5. , Design Electrical Rating-(Net MWe): 1148
- 6. . Maximum Dependable Capacity (Gross MWe): 1200 7.. . Maximum Dependable Capacity.(Net MWe): 1150 8.>-'If Changes Occur-in Capacity Ratings (Items Number 3 Through 7) 4 tSince"Last Report, Give Reasons: Not Applicable
- 9. . Power Level To Which Restricted, If Any: None 110.' Reasons-For-Restrictions, If Any - Not Applicablo This Month Yr.-to-Date -Cumulative- >
(11. Hours-In R'eporting' Period' 744.0 744.0 46393.0 1241 Number of Hours Reactor Wak Critical 744.0 744.0 13109.5
- 13. Reactor Reserve.Shutdrvn Hours 0.0 'O.0 953.3 141 HoursJGenerator:On-Line' 744.0- ~ 74 4'. 0 '11268.0 ,
115 EUnit. Reserve .;hutdown- Hours 0.0 0.0 0.0 116. - Gros sl-: Thermal l Energy LGenerated : (MWH ) ' 2534000- 2534000 35603861
- .17. Grosa Elec. Energy Generated- (MWH) . -884704- 884784 12256033-18'1 Net-El'ectrical: Energy Generated (MWH)^ m _850551-
. 850551 11758926
- 194 Unit ServiceEFactor 100.0 100.0 77.8-
- 20'.. Unit: Availability Faetor- .
100.0 100.0- 77.8-
- 21. Unit. Capacity Factor:(Using MDC Net) 99.4 = 99. 4 _ 73.3
- 22.-Unit l Capacity FactorL(Using DER Net)= 99.6- 99.6 73.4 _ ,
- 23'.-EUnit Forced Outage-Rate .
-0.0 0.0 8.0 .
24; Shutdowns: Scheduled over Next:6 Months (Type, Date, and Duration'of. Each):
None Scheduled--
-25. If Shut-Down At-End Of-Report Period.-; Estimated Date Of Startup Not-Applicable:
-3
- NOTEi' " Cumulative' values based on- total . hours starting 08/19/90,. date Ragular Full Power Operation began.
.-n
.. i. .
1 of 4 i
, - + ,,, -- ,w , y- .,my. , , , , - ~ - -,,. , - , j
N
- AVERAGE DAILY UNIT POVc'R LEVEL DOCKET NO. 50-443 UNIT Seabrook 1 DATE 02/10/92 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
MONTl! J ANUARY. 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1138 16 1146 2 _
113R 17 1147 3 1138 18 1147 4 1338 19 1147 5 1138 20 1147 6 1138- 21 1147 7 1102 22 1147 __
8 1138 23 1148 9 1138 24 1148 10 1142 25 1146 11 1147 26 1147 12 1147 27 1147 13 1148 28 1147 14 1149 29 1147 35 1148 30 1147 31 1147 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
2 of 4
i y , {
,4
UNIT SHUTDOWNS AND FOWER REDUCTIONS; DOCKET NO. 50-443 '
UNIT Seabrook 1 DATE O2/10/92-
- REPORT MONTH- JANUARY. 1992' COMPLETED BY P. Nardone' TELEPHONE (603) 474-9521:
(Ext. 4074)
- No. : 'Date- Type l Duration: ' Reason' ' Method of Licensee- Cause & Corrective (Hours) . ' Shutting .
Event ~ Action'to Down Reactor 3 ; Report:# Prevent Recurrence.
Page l'of 1' NO ENTRIES FOR THIS MONTH e
1 -2 3 F: Forced Reason: Method:
S: Scheduled A-Equipment Failure.(Explain) 1-Manual 1B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram
.D-Regulatory Restriction. 4-Continued from
-E-Operator Training &. License Examination previous month
--F-Administrative 5-Power Reduction ,
G-Operational' Error (Explain) .(Duration = 0)
H-Other (Explain) 9-Other (Explain) 3'of!4 i
.)
J E .
DOCKET NO. $0-443 .
i,'I' -.- UNIT Seabccok 1- !
,. ~ p DATE __02/10/92- i
, COMPLETED BY P. Nardone ,
TELEPHONE (603) 474-9521,'
(Ext. 4074)_- '
REFUELING INFORMATION REQUEST
= 1;-Name ofcfacility: Seabrook Unit 1
- 2. Scheduled ~date_-for next refueling shutdown: 09/19/92
- 13. Scheduled date for-restart following-refueling: 11/14/92
- 14. Will refueling or resumption of operation-thereafter require a technical specification change or.other license amendment? :
.Yes, Reactor Coolant System Narrow Range RTD Bypass Elimination
- 5. Scheduled date(s) .for submitting licensing action and supporting informations LFebruary 28, 1992-
'6. Important licensing considerations associated with refueling, e.g.,
claw or different fuel design or suppliar, unreviewed design or fperformance analysis methods, significant changes in fuel design, new: operating procedures:
-e. .
Next refueling will be the initial start of the eighteen-month fuel' cycle schedule.
- 7. The number.of fuel assemblies (a) in the core and (b) 1.n the spent
- fue1Lstorage pools
-(a) -. In . Core s '
. 193 (b) 60
'8.'The'present licensed spent fuel pool'etorage capacity and the size of any increase in licensed storage capacity _that-has been-requested or' L 'is planned =,-in: number of-fuel assemblies:-
Present: licensed capacity: 1236 No11ncrease in. storage _ capacity requested'or planned. ,
- 9. The projected date of the last refuelitig that can be discharged to the spent fuel l pool. assuming the present licensed capacity -
e H Licensed capacity of 1236_ fuel assemblies based on two
/ z annual'and-twelve eighteen-month =refuelings with full core offload: capability.:
L The current-_ licensed capacity is adequate until at least the L year-2010.