ML20092G785

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-37 Re Unauthorized/ Unqualified Duct Sealant Matl Used in HVAC Ductwork. Initally Reported on 840517.Final Rept Delayed Until 840830 Due to Extensive Evaluation
ML20092G785
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/12/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29724-TDS, DER-84-37, NUDOCS 8406250235
Download: ML20092G785 (3)


Text

.

1 i

c';5!vro Arizona Public Service Company n; y. ;

p

t. nr June 12, 1984 ANPP-29724-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oakt. Office Park 1450 Macia Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programa '

Subject:

. Interim Report - DER 84-37 i

A 50.55(e) Potentially Reportable Deficiency Relating to Unauthorized / Unqualified Duct Sealant File: 84-019-026; D.4.33.2 7

Reference:

Telephone Conversation between P. Narbut and T. Bradish on Nay 17, 1984.

Dear Sir:

i The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

5 Due to the extensive investigation and evaluation required, an Interim j

Report is attached. It is now expected that this information will be finalized by August 30,1984, at which time a complete report will be submitted.

Very truly

_q O

C CCJ A \\

@W,Q E. E. Van Brunt, Jr.

,~

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:db-

- Attachment 1

cet See~Page Ttro 1

n.meamb' g

EE47; 1

gd 1 Mr. T. W. Bishop DER 84-37 Page Two ec

Richard DeYoung, Director Office of. Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J.~ R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30J39 i

I i

s-p.

e

%e,

?

INTERIM REPORT - DER 84-37 POIENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1, 2, 3 lY

1. -

Potential Problem Unauthorized and/or unqualified sealant material has been used in HVAC Ductwork in Containment / Auxiliary / Control / Fuel Buildings.

II.. ipproach To and ' Status of ' Proposed lies 51ution Bechtel engineering is currently studying this problem to determine reportability and. technical justification for corrective action.

The subcontractor is investigating the extent of this problem, and his report is scheduled to be ready by July 1,1984.

III. Projected Completi5n 5f Corrective iction and Submittal'of the Final Report Evaluation of this condition and submittal of the Final Report is Forecast to be completed by August 30, 1984.

u

..