Text
.
A
~"
.,.- nu Arizona Public Service Company ny; yr l l1 p'h m
4 June 11, 1984 ANPP-29716-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-78 A 50.55(e) Potentially Reportable Deficiency Relating To No Documentation Of Users Test And No Controlling Procedure For Rock Bolt Expansion Anchors File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and K. Parrish on November 9, 1983 (B) ANPP-28393, dated December 8,1983 (Interim Report)
(C) ANPP-28801, dated February 6,1984 (Time Extension)
(D) ANPP-29494, dated May 14, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by June 15, 1984.
Due to the extensive investigation and e taluation required, it is now expected that this information will be finalized by August 3, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, OLL(
dR E. E. Van Brunt, Jr.
h fo h
APS Vice President PDR Nuclear Production i
8 ANPP Project Director EEVB/TRB db cc: See Page Two V
L J4~ >7 1
m.
7
~*
,, ~.
Mr.'T. W. Bishop DER 83-78 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear-Regulatory Commission
, Washington,-D. C. 20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T.. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Ilawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations
' 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 1