ML20092F651

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for Jul 1995
ML20092F651
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/31/1995
From:
CENTERIOR ENERGY
To:
Shared Package
ML20092F615 List:
References
NUDOCS 9509180274
Download: ML20092F651 (1)


Text

. - . _ .

b- 6 o

s INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 7/27/95 Perry, Ohio 44081 Laboratory: Quanterra Inc.

Date of Sample: 7/6 to 7/7/95 Time of sample: 1955 Sample Location: Sewage Pump Station Name of Sampler: Eric Smith Laboratory Address: 1401 Shuffel Dr.

North Canton CH 44720 i

j Lv i of Analysis: 7/7 to 7/26/95

Flow
33,000 gpd
Name of Analyst

PARAMETER SAMPLE EPA ANALYSIS ANALYSIS

] METHOD DATE RESULT TYPE COD Composite 410.4 7/25 to 7/26 140 mg/L 4

j BOD Composite 405.1 7/7 to 7/11 50 mg/L TSS Composite 160.2 7/10 110 mg/L f

a Silver Composite 200.7 7/12 to 7/21 None Detected l

i

! Mercury Composite 245.1 7/12 to 7/15 None Detected s

f pH Grab 150.1 7/7 8.3 s.u.

Oil / Grease Grab 413.1 7/20 to 7/21 13 mg/L l

j Gravimetric e

I certify under penalty of law that I have personally examined and I am 1 familiar with the information in this report and that, based on my inquiry

of those persons immediately responsible for obtaining the information 4 contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for j submitting 1se information including the possibility of fine and i imprisonme t i

i Mi O (/Vice President - Nuclear SignIature ' I Date I Title 9509180274 950915 PDR ADOCK 05000440 i _R, PDR J