Forwards Quarterly self-monitoring Repts for Pnpp Sanitary Waste Sys for Months of June,Jul & Aug 1995.Results from Isotopic Analysis & Annual Industrial Wastewater Questionnaire Also Encl
ML20092F613
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/15/1995
From: Shelton D
CENTERIOR ENERGY
To: Long G
LAKE COUNTY, OH
Shared Package
ML20092F615 List:
References
PY-CEI-LDCU-033, PY-CEI-LDCU-33, NUDOCS 9509180262
Download: ML20092F613 (1)


Text

_

'l CENTERfOR

. ENERGY Donald C. Shelton PERRY NUCLEAR POWER PLANT I Mdress:

SENIOR VICE PRESIDENT to CENTER ROAD PERRY, OHIO 44081 NUCLEAR PERRY, OHIO 44081 (216) 259-3737 September 15, 1995 PY-CEI/LCDU-0033L Lake County Department of Utilities Attention: Gary Long, Hentor Vaste Facility P.O. Box 490 Painesville, Ohio 44077-0490 Gentlemen:

Enclosed are the Quarterly Self-Monitoring Reports for the Perry Nuclear Power Plant sanitary vaste system for the months of June, July and August. All required samples were collected and analyzed in accordance with the self-monitoring program.

Also enclosed are the results from an isotopic analysis and the annual Industrial Vastevater Questionairre.

If you have questions or require additional information, please contact Donna Tizzano at (216) 280-5514.

Very truly yours,

} 1

{

1 DGT:sc Enclsoures cc: NRC Project Manager NRC Resident Inspectors Office NRC Document Control Desk NkC Region III

. rr~ .,

' v v U .' %

Operonng Compames Cleveland Elects.c Numinat<ng 9509180262 950915 ADOCK 05000440 a%i toiedo Edison PDR fS,/ {