Southctn Nuct:ar Operating Company j *,*
Post Offica Box 1295 Birmingham, Alabama 35201 Telephone (205) 868-5131 Southern Nudear Operating Company o.ve uorey Vice President the southern electnc system Farley Project September 14, 1995 Docket Nos.
50-348 I
50-364 -
U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthiv Ooerating Reoort Gentlemen:
Attached are the August 1995 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
[/ )M' Dave Morey RWC:(mor)
Attachments cc:
Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T, M. Ross q
5
.9b y 6 2. +
v 9509180172 950831 ll8 PDR ADOCK 05000348 R
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations August 1995 j
There were no unit shutdowns or major power reductions during the month.
The unit began coastdown for the cycle 13 refueling outage at 0000 on August 19, 1995.
There was no major safety related maintenance performed during the month.
OPERATING DATA REPORT DOCKET NO.
50-348 DATE September 8,1995 COSIPLETED BY S. M. Allison TELEPilONE (334) 899-5156 ext. 3442 OITJMTING. STATUS 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
August 1995
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
- 11. Ilours in Reporting Period 744.0 5,831.0 155,591.0
- 12. Number OfIfours Reactor Was Critical 744.0 5,611.1 124,867.9
- 13. Reactor Reserve Shutdown llours 0.0 0.0 3,650.0
- 14. Ifours Generator On-line 744.0 5,575.3 123,029.2
- 15. Unit Reserve Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1,926,386.2 14,618,286.3 316,754,003.3
- 17. Gross Electrical Energy Generated (MWil) 623,567.0 4,774,304.0 102,188,009.0
- 18. Net Electrical Energy Generated (MWil) 591,483.0 4,526,478.0 96,526,467.0
- 19. Unit Service Factor 100.0 95.6 79.1
- 20. Unit Availability Factor 100.0 95.6 79.1
- 21. Unit Capacity Factor (Using MDC Net) 97.9 95.6 76.2
- 22. Unit Capacity Factor (Using DER Net) 95.9 93.6 74.8
- 23. Unit Forced Outage Rate 0.0 4.4 5.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, September 16,1995. Approximately 33 days.
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: _
Forecast Achieved
- 26. Units In Test Status (Prior To Commercial Operation):
initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77
l.-
DOCKET NO.
50-348 UNIT I
DATE September 8,1995 COMPLETED BY S. M. Allison TELEPilONE (334) 899-5156 ext. 3442 MONTIl August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 817 17 811 2
818 18 810 3
812 19 803 i
1 4
815 20 800 1
]
5 813 21 797 6
813 22 787 812 23 777 8
813 24 774 9
817 25 768 10 817 26 763 11 813 27 755 12 813 28 755 13 813 29 752 4
14 811 30 742 T
15 808 31 738 j
16 811 i
4 i INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348
. 's UNIT NAME J. M. Farley - Unit I DATE September 8,1995 COMPLETED BY S.M. Allison REPORT MONTil August TELEPIIONE (334) 899-5156, ext. 3442 METilOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SilUTTING EVENT SYSTEM COMPONENT ACHONTO NO.
DATE TYPE (1)
IIOURS REASON (2) DOWN REACTOR (3)
REPORT #
CODE (4)
CODE (5)
PRE \\TNr RECURRENCE
~ There were no Shutdowns or power reductions during the month.
I 1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same &mrce S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & License Examination F - Administrative G - Operat.onal Error (Explain)
II-O*her (Explaidi
Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations August 1995 l
There were no unit shutdowns during the month.
At 2202 on August i 1,1995, reactor power was decreased to approximately 16 pcreent power to perform steam generator clean-up.
The unit was returned to 100 percent power at 0930 on August 14,1995.
There was no major safety related maintenance performed during the month.
l OPERATING DATA REPORT DOCKET NO.
50-364 DATE September 8,1995 CO.TIPLETED BY S. M. Allison TELEPilONE (334) 899-5156 ext. 3442 OPERATINGETATUS 2.
Reporting Period:
Joseph M. Farley - Unit 2 Notes 1.
Unit Name:
August 1995
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
- 11. Ilours in Reporting Period 744.0 5,831.0 123,504.0
- 12. Number OfIlours Reactor Was Critical 744.0 4,378.0 106,035.7
- 13. Reactor Reserve Shutdown IIours 0.0 0.0 138.0
- 14. Ilours Generator On-line 744.0 4,150.2 104,372.8
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1,865,019.0 9,235,826.8 265,575,532.5
- 17. Gross Electrical Energy Generated (MWil) 602,725.0 2,971,152.0 87,025,694.0
- 18. Net Electrical Energy Generated (MWil) 572,031.0 2,773,498.0 82,495,796.0
- 19. Unit Service Factor 100.0 71.2 84.5
- 20. Unit Availability Factor 100.0 71.2 84.5
- 21. Unit Capacity Factor (Using MDC Net) 93.5 57.9 81.5
- 22. Unit Capacity Factor (Using DER Net) 92.7 57.4 80.6
- 23. Unit Forced Outage Rate 0.0 5.0 4.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 l
l.*
DOCKET NO.
50-364 J
UNIT 2
DATE September 8,1995 COMPLETED BY S. M. Allison TELEPilONE (334) 899-5156 4
ext. 3442 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Net)
(MWe-Net) f 1
822 17 817 1
l 2
822 18 817 3
815 19 814 4
4 4
818 20 819 5
817 21 818 1
6 820 22 824 1
821 23 822 7
8 821 24 822 9
824 25 822 10 825 26 818 11 815 27 816 12 105 28 822 i
4 13-70 29 826 14 699 30 827 i
15 814 31 827 16 817 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the j
reporting period. Compute to the nearest whole megawatt.
)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 i
'."s UNIT NAME J. M. Farley - Unit 2 DATE September 8,1995 COMPLETED BY S.M. Allison REPORT MONTII August TELEPHONE (334) 899-5156, ext. 3442 METIIOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIIJITING EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPE (1) 1IOURS REASON (2) DOWN REACTOR (3)
REPORT #
CODE (4)
CODE (5)
PitEVBT RECtT/RENCE 011 950811 S
0.0 H
4 N/A AB SG At 2202 on August i 1,1995, reactor power was decreased to approximately 16 percent power to perform steam l
generator clean-up.
The unit was returned to 100 percent power at 0930 on August 14,1995.
1:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instmcuons for Exhibit I - Same Source 4
S: Scheduled A - Equipment Failure (Explain)
I - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C. Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 -Other (Explain)
E - Operator Training & License Examination F - Administrative G -Operational Error (Explain)
II-Other (Explain)
-