ML20092F242
| ML20092F242 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/31/1992 |
| From: | Cottle W, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00015, GNRO-92-15, NUDOCS 9202190189 | |
| Download: ML20092F242 (5) | |
Text
. - _ _ _ _ _
g.
Entegy Opecations,Inc.
~= ENTERGY o
u W. T. C ottle l'e b rua r y 13, 1992 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf fluclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-92/00015 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operatiens is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit I for January 1992 (attachment).
If you have any questions or require additional inforn'ation, please contact this office.
Yours truly, w4
' Csuu, WlC/TKM/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Power Reductions cc:
(See next page)
M00PJAN i i g
9202190189 920131 PDR ADOCK 05000416 R
pon
february 13. 1992 i
GNRO-92/00015 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. J. L. Mathis (w/a))
Mr.R.B.McGehee(w/a Mr. N. S. Reynolds (w/a)
Mr.H.L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Comission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr.P.W.O'Connor,ProjectManager(w/a)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Mail Stop 13H3 Washington, D.C.
20555 i
(
' to GNRO-92/00015 DOCKET NO.
50-416 s
DATE 01/0T/V2 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334 OPERATING STATUS 1.
Unit Names GGNS UNIT 1 lotes:
2.
Reporting Period:
January 1992 3.
Licensed Thermal Power (IGT): 3833 MWT 4.
NameplateRating(GrossMWE): T372.5 MWE 5.
Design Electrical Rating (Net RR~e): 1250 MWE 6.
Maximum Dependable Capacity (Gross MRe): IT9TRWE
- 11WC, MaximumDependableCapacity(NetMWe)(: Items Number 3 Through 7) Since Last Report.
7.
If Changes Occur in Capacity Ratings 8.
Give Reasons:
N/A 9.
Power Level To Which Restricted, In Any (Net HWe):
N/A
- 10. Reasons for Restrictions, if Any:
N/A This Month
,Yr to Date Cumulative
- 11. Hours in Reporting Period 744 744 63,826
- 12. Number of Hours Reactor Was Critical 571 571 50,768.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 520 520 48,570.4
- 15. Unit Reserve Shutdown Hours 0
-D 0
- 16. Gross Thermal Energy Generated (MWH) 1,869,517~
1,869,517 IF'59W
- 17. Gross Electrical Energy Generated (MWH) 600,275' 600,275 53.170,385
- 18. Net Electrical Energy Generated (MWH) 572.500 572,500 50.833,215
- 19. Unit Service Factor 69.9 69.9 78 8
- 20. Unit Availability Factor 69.9 69.9 78.8
- 21. Unit Capacity Factor (Using MDC Net) 6 7. 3__
67.3 74.9
- 22. Unit Capacity factor.(Using DER Net) 61.6 61.6 67.9
- 23. Unit forced Outage Rate 30.1 10 3 6.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
8egin Refuelino Outage - 5 on 04/17/92 for an estimated duration of 46 days.
- 25. TfTiv:~Down At End of Report Period.
Estimated Date of Startup:
NA
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY T07707BT COMMERCIAL OPERATION 07/01/85 M00PJAN/SCMPFLR J
' to GNRO-92/00015 DOCKET NO.
50-416 UNIT 1
DATE 01/07/92 1
3 MONTH January 1992 DAY AVERAGE DAILY POWER LEVEL OAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 1205.6 2
0 18 1201.2 3
0 19 1208.9 4
0 20 1204.7 5
0 21 1199.2 6
0 22 1184.8 7
0 23 1190.5 8
0 24 1197.5 9
0 25 1153.5 10 204.1 26 1192.1 11 840.6 27 1192.2 12 888.9 28 1189.2 2
13 712 29 1187.5 14 1088. 1 30 1189.8 15 1174.6 31 1186.4 16 1210.9 M00PJAN/SCMPFLR
Attach:::ent 3 to GNRO-92/00315' l
UNIT SHUTDOWNS AND P7 DER REDUCTIDNS DOCKET NO.
50-416 UNIT MAME 1
DATE 01/07/92 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH January 1992 l
l l
l l
l Method of j Licensee l l
l Cause & Coriective l
l No. J. Date l Type jDuration) Reason l Shutting Downl Event l System lCoc:ponent i Action To l
l' l
l (1) l Hours l
(2) l Reactor l Report #
l Code l Code l
Prevent Recurrence l
I l
I l
l l
(3) l l
(M l
(5) l (C&CA)
I l
I I
I i
l I
I i
i I
l91-101/01/92[
F l 224 l
A l
4 l
N/A l
AD l P
l Continued outage fro::; last month. l l015 l l
l l
l
[
l l
iForced shutdown for Recirc Pump l
l l
l l
l l
l l
l l *B' shaft replace:nent.
1 1
I I
i i
i i
i i
i i
l 1
i I
i i
I i
i i
i UNIT SHUTDOWNS AND POWER REDUCTIONS 1
2 3
4
-F: Forced Reason:
Method:
Fxhibit G - Instructions 5:-Scheduled
.A-Equipment Failure 1-Manual for.% ration of Data (Explain) 2-Manual Scram Entry Weets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination F-Administrative 5
Exhibit 1-Same Source G-Operational Error (Explain)
H-Other (Explain)
MOOPJAN/SCMPFLR L--
_.. _.