.Q PSEG Public Suvico Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 00038 Hope Creek Generating Station j
i February 13, 1992 U. S. Nuclear Regulatory Commission Document-Control Desk
- Washington, DC 20555 Dear Sir MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION UNIT 1 DOCKET NO. 50-354 In compliance with.Section 6.9, Reporting Requirements for the-Hope Creek Technical Specifications, the operating
-statistics for January are being forwarded to you.
The summary of changes, tests, and experiments'for January 1992
-t will be' included with the. February report.
Sincerely yours,
/
em n
M.
Wk 7
J.
iga G neral Manager -
Hope Creek Operations R'ild Attachments C
Distribution
)
9202190163 920131
(, '
PDR ADOCK 05000354 l) t
.R PDR t
The Enprgy People
/
10002r
,m n m.m,,,
up y
y ry, - -
- g v--c-*
T C'"r*
"r f
TM'nex-4t
-y e
sP
-+
i t
e e
INDEX NUMBER SICIlQN OF PAGES Average Daily Unit Power Level.
1 Operating Data Report.
2 Refueling Information.
1 Monthly operating Summary...
1 k
u r
.---,y-e
-.n-r,--.,
y e---,
[-
i L
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-354 UNIT Hope Creek DATE 2/13/92 Zabielski 'dC[4 COMPLETED BY V.
TELEPil0NE (609) 339-3506 MONTH January 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nat)
(MWe-Net) 1.
1063 17.
1012 2.
1055 18.
1059 3.
1Q12 19.
121E 4.
1048 20.
1051 5.
1046 21.
1062 6.
1RER 22.
1052 7.
1058 23.
1031 8.
1&ER 24.
1080 9.
21 25.
101Q 10.
J112 26.
1037 11.
1057 27.
lail 12.
1029 28.
1058 13.
1053 29.
1056 14.
1050 30.
1060 15.
1055 31.
1055
- 16. -
1043
OPERATING DATA REPORT DOCKET NO.
50-354 UNIT Roos Creek DATE
.2/13/92 COMPLETED BY V.
Zabielski 1/
TELEPHONE f609) 339-3506
. OPERATING STATUS 1.
Reporting Period January 1992 Gross Hours in Report Period 231 2.-
Currently Authorized Power Level (MWt) 3293 Max. Depend. Capacity (NWe-Net) t) 1031 Design Electrical Rating (MWe-Ne 1067 1
3.
Power Level to which restricted (if-any) (MWe-Net)
E2DR 4..
Reasons for restriction'(jf any)
This Yr To Month Rata Cumulative-5.
No. of hours reactor was critical 744.0 744.0 37.905.3 6.-
Reactor reserve shutdown hours AAA AAA AAA 7.
Hours generator on line 744.0 744.0 37.318.6 8.-
Unit reserve shutdown hours AAA' ECQ 2AQ 9.
Gross thermal energy generated 2.443.337 2.443.337 118.440.480 (MWH)'
10.' Gross electrical energy Allajl2 818.660 39.171.154-generated _(MWH)
- 11. Net electrical energy' generated 784,624 784.624 37.436.173 l
12.- Reactor service factor 100.0 1Q222 84.5
- 13. Reactor availability factor 100.0 100.0 84.5
- 14. Unit service = factor 100.0 100.0 83.2
- 15. Unit availability factor 100.0 100.0 83.2 l
i
- 16. : Unit capacity factor '(using MDC) 102.3 102.3 1922
-17. Unit capacity factor.
98.8 1111 78.2 (Using Design MWe)
. 18. Unit forced. outage rate AzQ D22-1.1 19.EShutdowns scheduled over next 6 months-(type, date, & duration):
-Enir.tenance outage, 3/ 7/92, 10. days-
- 20. If shutdown at end of report period, estimated date of start-up:
N/A.
I e
p m
.,.,..,,-,..y
.,,, hw n,.y.,...,.o.w
.........,_.,....,._hm.,..uw,,.c
,_.ww,,,,w:,,,.,,,.,
e h r w w g e,.,%
h%e._c,,.,[,.-=m.r..r,.
,m,,
I
OPERATING DATA REPORT UNIT SHUTDOWHS AND POWER REDUCTIONS DOCKET NO.
50-354 UNIT liong_gttek DATE
_2113/92 COMPLETED BY
- y. Zabielski TELEPHONE
_(609) 339-3506 MONTH January 1992 NETilOD OF BHUTTING DOWN TIIE TYPE REACTOR OR F= FORCED LURATION REASON REDUCING CORRECTIVE NO.
DATE S=SCllEDULED (HOURS)
(1)
POWER (2)
ACTION / COMMENTS Nono.
' Summary
l REFUELING INFORMATION i
DOCKET NO.
50-354 UNIT lloom Creek DATE 2/13/92 COMPLETED BY L_HollingaMarlh TELEPHONE (609) 339-1051,
MONTH January 1992 1.
Refueling information has changed from last month:
Yes No X
2.
Scheduled date for next refueling:
9/12/92 3.
Scheduled date for restart following refueling:
11/11/92 4.
A.
Will Technical Specification changes or other licenso amendments be required?
Yes No X
B.
Has the reload fuel design been reviewed by the Station Operating Review Committee?
Yns No X
If no, when is it scheduled?
not scheduled (on or prior to 7/24/92) 5.
Scheduled date(s) for submitting proposed licensing action:
HLA 6.
Important licensing considerations associated with refueling:
- Same fresh fuel as current cycles no new considerations 7.
Number of Fuel Assemblies:
A.
Incore lia l
B.
In Spent Fuel Storage (prior to refueling) lig C.
In-Spent Fuel Storage (after refueling) 1008
~ 8.
Present licensed spent fuel storage capacityt 4006 Future spent fuel storage capacity ARQ4 l
9.
Date of last refueling that can be discharged 11/4. 2010 to spent fuel pool assuming the present (EOC16) licensed capacity (does not allow for full-core offload)
e HOPE CREEK GENERATING STATION MONTHLY OPERATING
SUMMARY
January 1991 Hope Creek entered the month of January at approximately 100%
l
-power.
The unit operated for the entire the month without experiencing any shutdowns or any reportable power reductions.
On January 31, the plant completed its 265th day of continuous power operation.