Monthly Operating Rept for Jan 1992 for Hope Creek Generation Station,Unit 1
ML20092F217
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/31/1992
From: Hagan J, Zabielski V
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202190163
Download: ML20092F217 (7)


Text

-

~

.Q PSEG Public Suvico Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 00038 Hope Creek Generating Station j

i February 13, 1992 U. S. Nuclear Regulatory Commission Document-Control Desk

  • Washington, DC 20555 Dear Sir MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION UNIT 1 DOCKET NO. 50-354 In compliance with.Section 6.9, Reporting Requirements for the-Hope Creek Technical Specifications, the operating

-statistics for January are being forwarded to you.

The summary of changes, tests, and experiments'for January 1992

-t will be' included with the. February report.

Sincerely yours,

/

em n

M.

Wk 7

J.

iga G neral Manager -

Hope Creek Operations R'ild Attachments C

Distribution

)

9202190163 920131

(, '

PDR ADOCK 05000354 l) t

.R PDR t

The Enprgy People

/

10002r

,m n m.m,,,

up y

y ry, - -

  • g v--c-*

T C'"r*

"r f

TM'nex-4t

-y e

sP

-+

i t

e e

INDEX NUMBER SICIlQN OF PAGES Average Daily Unit Power Level.

1 Operating Data Report.

2 Refueling Information.

1 Monthly operating Summary...

1 k

u r

.---,y-e

-.n-r,--.,

y e---,

[-

i L

AVERAGE DAILY UNIT POWER LEVEL DOCKET No.

50-354 UNIT Hope Creek DATE 2/13/92 Zabielski 'dC[4 COMPLETED BY V.

TELEPil0NE (609) 339-3506 MONTH January 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nat)

(MWe-Net) 1.

1063 17.

1012 2.

1055 18.

1059 3.

1Q12 19.

121E 4.

1048 20.

1051 5.

1046 21.

1062 6.

1RER 22.

1052 7.

1058 23.

1031 8.

1&ER 24.

1080 9.

21 25.

101Q 10.

J112 26.

1037 11.

1057 27.

lail 12.

1029 28.

1058 13.

1053 29.

1056 14.

1050 30.

1060 15.

1055 31.

1055

16. -

1043

OPERATING DATA REPORT DOCKET NO.

50-354 UNIT Roos Creek DATE

.2/13/92 COMPLETED BY V.

Zabielski 1/

TELEPHONE f609) 339-3506

. OPERATING STATUS 1.

Reporting Period January 1992 Gross Hours in Report Period 231 2.-

Currently Authorized Power Level (MWt) 3293 Max. Depend. Capacity (NWe-Net) t) 1031 Design Electrical Rating (MWe-Ne 1067 1

3.

Power Level to which restricted (if-any) (MWe-Net)

E2DR 4..

Reasons for restriction'(jf any)

This Yr To Month Rata Cumulative-5.

No. of hours reactor was critical 744.0 744.0 37.905.3 6.-

Reactor reserve shutdown hours AAA AAA AAA 7.

Hours generator on line 744.0 744.0 37.318.6 8.-

Unit reserve shutdown hours AAA' ECQ 2AQ 9.

Gross thermal energy generated 2.443.337 2.443.337 118.440.480 (MWH)'

10.' Gross electrical energy Allajl2 818.660 39.171.154-generated _(MWH)

11. Net electrical energy' generated 784,624 784.624 37.436.173 l

12.- Reactor service factor 100.0 1Q222 84.5

13. Reactor availability factor 100.0 100.0 84.5
14. Unit service = factor 100.0 100.0 83.2
15. Unit availability factor 100.0 100.0 83.2 l

i

- 16. : Unit capacity factor '(using MDC) 102.3 102.3 1922

-17. Unit capacity factor.

98.8 1111 78.2 (Using Design MWe)

. 18. Unit forced. outage rate AzQ D22-1.1 19.EShutdowns scheduled over next 6 months-(type, date, & duration):

-Enir.tenance outage, 3/ 7/92, 10. days-

20. If shutdown at end of report period, estimated date of start-up:

N/A.

I e

p m

.,.,..,,-,..y

.,,, hw n,.y.,...,.o.w

.........,_.,....,._hm.,..uw,,.c

,_.ww,,,,w:,,,.,,,.,

e h r w w g e,.,%

h%e._c,,.,[,.-=m.r..r,.

,m,,

I

OPERATING DATA REPORT UNIT SHUTDOWHS AND POWER REDUCTIONS DOCKET NO.

50-354 UNIT liong_gttek DATE

_2113/92 COMPLETED BY

y. Zabielski TELEPHONE

_(609) 339-3506 MONTH January 1992 NETilOD OF BHUTTING DOWN TIIE TYPE REACTOR OR F= FORCED LURATION REASON REDUCING CORRECTIVE NO.

DATE S=SCllEDULED (HOURS)

(1)

POWER (2)

ACTION / COMMENTS Nono.

' Summary

l REFUELING INFORMATION i

DOCKET NO.

50-354 UNIT lloom Creek DATE 2/13/92 COMPLETED BY L_HollingaMarlh TELEPHONE (609) 339-1051,

MONTH January 1992 1.

Refueling information has changed from last month:

Yes No X

2.

Scheduled date for next refueling:

9/12/92 3.

Scheduled date for restart following refueling:

11/11/92 4.

A.

Will Technical Specification changes or other licenso amendments be required?

Yes No X

B.

Has the reload fuel design been reviewed by the Station Operating Review Committee?

Yns No X

If no, when is it scheduled?

not scheduled (on or prior to 7/24/92) 5.

Scheduled date(s) for submitting proposed licensing action:

HLA 6.

Important licensing considerations associated with refueling:

- Same fresh fuel as current cycles no new considerations 7.

Number of Fuel Assemblies:

A.

Incore lia l

B.

In Spent Fuel Storage (prior to refueling) lig C.

In-Spent Fuel Storage (after refueling) 1008

~ 8.

Present licensed spent fuel storage capacityt 4006 Future spent fuel storage capacity ARQ4 l

9.

Date of last refueling that can be discharged 11/4. 2010 to spent fuel pool assuming the present (EOC16) licensed capacity (does not allow for full-core offload)

e HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

January 1991 Hope Creek entered the month of January at approximately 100%

l

-power.

The unit operated for the entire the month without experiencing any shutdowns or any reportable power reductions.

On January 31, the plant completed its 265th day of continuous power operation.