ML20092E177
| ML20092E177 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/07/1984 |
| From: | Edmonds R DUKE POWER CO. |
| To: | Kulash W PLANNING RESEARCH CORP. |
| References | |
| I-EP-026, I-EP-26, OL, NUDOCS 8406220315 | |
| Download: ML20092E177 (3) | |
Text
- ,_
DUKE POWElf COMPANY g g.W Elt A1, 01'FICES EONY/$.*4o$
P. O. O 0 I 33189 422 SOUTH CHURCH STREET b40C Cit Atti.orri:. N. C. 28242 II : 4 February 17, 1983 7j
,rr UCCHLTj@M NC43X59; n-i - E P-M Mr. Walter Kulash g
p w
PRC Voorhees J
U 1500 Planning Research Drive McLean, Virginia 22120 v o -1/3 f/Y dc r
Re:
Catawba Nuclear Station Emergency Evacuation Time Estimate File No:
CN-1464.00
Dear Mr. Kulash:
Attached for your information is a memo to file pertaining to our meeting on February 15, 1983 with state and local of ficials to discuss the.urrent status and results of the Catawba evacuation models.
Yours truly, NUCLEAR REGULAR 0RY COMMISSION S. B. Hager, Ohief Engineer omet h M cmi my _ _
-U Civil /Envi ronmental Division
__ pg
.att
__ memnto __V
- icut
,_ _. - ___... _. grenyt o i
By:
. F. Edmonds, Jr.
menc,, __ z __ aor.crta Senior Engineer g., g., _
b [,8[
- n:tu G'
RFE/JHL/mdc
~~
cart
-I Attachment cc w/att:
Mr. W. M. McSwain
~~~ ~ ~
Mr. James Self Mr. Bob Phillips Mr. Wayne Broome Mr. Joseph F. Myers Mr. Jerry Lutes Mr. L. C. Dall Mr. R. M. Glover Mr. Mike Bolch lir. M. S. Tully Mr. James L. Carroll
\\
l 8406220315 840507 PDR ADOCK 05000413 C
PDR i
February 17, 1983 Memo to File Re:
Catawba Nuclear Station Emergency Evacuation Time Estimate (NUREG-0654, Appendix 4)
File No: CN-1464.00 On February 15, 1983 a meeting was held as a followup of the meeting on January 18, 1983 Attendees were:
Paul Lunsford SCEPD Bill McSwain SCEPD Howard P. Jernigan SCEPD Joseph F. Connally SCEPD James Self NCDEM Edwin H. Harris, Jr.
NCDEM Martha Butler NCDEM Joseph F. Myers Area Coordinator NC Emerg. Mgt.
James L. Carroll York County Betty L. Wright York County Joe W. Mitchell York County Sheriff's Dept.
Wayne Broome Mecklenburg County Bob Phillips Gaston County Ben F. Thomas ill SC SLED Billy M. Poore SCHP H. D. Thompson SCHP J. E. Vargos SCHP R. M. Glover Duke Mike Bolch Duke John H. Lee Duke
-Walter Kulash PRC Voorhees Jerry Lutes PRC Voorhees The meeting was opened with a brief overview of 1) the original free flow model,
- 2) a discussion of a second model which involved restricted traffic flows, i.e.,
all traffic sent directly to assigned reception centers with little to no traffic passing between. North and South Carolina, and 3) a fastest way out model which is a refined version of the first or free flow model. Traffic con-trol points recommended for use in implementing the fastest way out model in the Rock Hill vicinity were discussed.
It was deceide that the fastest way out model would be adopted and work would proceed toward completion of Evacuation Time Estimate report (NUREG-0654, Appendix 4). Maps in the report will be expanded to show the routing of South Carolina residents who have crossed.into North Carolina and who desire public sheltering back to their designated shelters, i.e., Bethany via 1-85 and Lan-caster via US-521.
4
.-~.
Memo to' File February 17, 1983 Page 2 i
With regard to our commitment to provide the states with supplementary data for an evacuation time estimate for each zone and adjacent zones as noted in.the memo to file dated 1/26/83, the State of South Carolina will submit to us an order of zone or area sequencing to be used in preparing this supplemental data.
Scheduling of the study is antic' pated to be as follows:
First Draft Approximately March 8, 1983 Meeting to Review Comments Approximately March 22, 1983 Final Report Approximately April 9, 1983 Supplementary data will be generated in parallel with the Appendix 4 study and will be forwarded to the states as received.
//
,(
y u~
w ohn H. Lee Technical Specialist JHL/mdc 1
S S
_. -