Monthly Operating Repts for Jan 1992 for Beaver Valley Power Station Units 1 & 2
ML20092C079
Person / Time
Site: Beaver Valley
Issue date: 01/31/1992
From: David Jones
DUQUESNE LIGHT CO.
To:
Shared Package
ML20092C077 List:
References
NUDOCS 9202110257
Download: ML20092C079 (8)


Text

'

IUM &TIVE SultWRY Ol'

!DflitLY OIUaTI!G IXIYRIDiCE UllIT 1 JNUARY 1992 January 1

'1ho Unit operated at a tunimi value of 100% cut ut.

T thtugh January 31 9202110257 920207 PDR ADOCK 05000334 R

PDR

N/DVCE MILY U!i1T 10i13 IJNI'.L IDCITI' lo. J0-334 UllIT E IS Unit 1 IWII Jchui,_.1222._

CUTILTED DY,_ David T. Jcr A TCIII1KtfC

[1121 393-7612-IDRI11_Januarv 1992

[WY AVUVCE tRILY TOi1R 11NEL

[AY AVDVCE 1%ILY 10FJ111NEL

(!Glo-!1et)

(14Jo-lict) 1 833 17 837 2

829 18 825 3

829 19 833 4

821 20 825

_m 5

829 21 011-6 829 22 825

[

7 81 2, 23 829 8

833 24 829 q;

.n 9

833 25 833 10 833 26 821 11 821 27 829 12 833 28 829 6x

"'~

13 829 29 829 14 225 30 833 15 829 31 829 16 825 IllSTIUCTIC41S:

On this formt, list the average daily unit puer level IMe-liet for each day in the reportirrJ renth. Otrqxito to the nearest whole mogmatt.

c.

i

OPERATING DATA REPORT j

DOCKET NO.:

50 334

-REPORT DATE:

02/04/92 l

COMPLETED BY: DAVID T. JONES

-l TELEPHONE:

(412)'393 7612 OPERATING STATUS i

1J UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes

2. REPORT!NG PERIOD: JANUARY 1992
3. LICENSED THERMAL POWER -(MVt):

2652

4. NAMEP1 ATE RATING (Cross MWe):

923-

5. DESIGN ELECTRICAL RATING (Net MWe):

835

-6. MAX DEPENDABLE CAPACITY (Gross MWe):

860-

7. MAX.-DEPENDABLE CAPACITY (Net MWe):

810'

-j 8; IF CilANCES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT. GIVE REASONS:

9.. POWER 1.EVEL TO VHICH RESTRICTED. IF ANY (Not DVe):

None

[

104' REASONS.FOR RESTRICTIONS. IF.ANY:

N/A

}

+

Tills MONTH-YEAR TO DATE CUMULATIVE 110 ll0URS IN REPORTING PERIOD:-

744,0 744.0 138096.0

.12. No..OF HRS. -REACTOR WAS CRITICAL:

744,0 744,0 86067.6--

t

13. REACTOR RESERVE SHUTDOWN 110 URSI 0.0' O.0 4482,8 i14.Lll0URS GENERATOR WAS ON LINE:

-744.0:

744.0 84175.2

~15. UNIT RESERVE SHUTDOVN HOURS:

0.0-0.0 0.0 116 : CROSS THERMAL ENERGY CEN. (MVH):

1968906.0

.1968906.0.

200481082.5 D17. CROSS ELECT ENERGY GEN.'(MVH):

653040.0 653040.0 64451443.0-i 118.. NET ELECTRICAL' ENERGY GEN. (HWI):

617390.0 617390.0-60184940'0-M 519.; UNIT SERVICE FACTOR -(PERCENT). -

100.0

-100.0:

63,0L l

= 20. UNIT AVA11 ABILITY FACTOR:(PERCENT)-.

?100,0 100.0-63.0 1

'21.LUNIT CAPACITY FACTOR (MDC): PCT 102.4 102.4 56.5 i

22. UNIT CAPACITY FACTOR (DER): PCT 99.4

- 99. 4 '.

54.8 23." UNIT FOACED. OUTAGE RATE:-(PERCENT) 0.0-0.0

-16,6

- 24. SHUTDOWNS - SCHEDULED OVER NEXT SIX MONTils.(TYPE.DATE. AND DURATION OF EACH):

25. IF SHUT-DOVN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

l

26. UNITS IN TEST STATUS (PRIOR TO. COMMERCIAL OPERATION)

i

, FORECAST

. ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A

-COMMERCIAL-OPERATION N/A-N/A I

.l d

m.

i UNif SCIDOWas AuD POWER REDUCTIous Q2C1)

Docket wo.

50-334 Unit meme ev's (W t si i

Date Wvery L 1992 Completed Sy Pow'd T.

Jm EEPORT 9804T8t J AaOAtf 1992 Telephone (412) 3o3-7At2 4

Method of Licensee Cause & Corrective Ouration Sauttiog Event System Component setion te No.

Date Typel (tours) acason2 Doun acactor3 seport #

Code 4 Code 5 Prevent Recurrence

~

monE 4

h i

I i

1 2

3 4

F-Forced Reason:

method:

Exhibit F-Instructions for S-Scheduled A-141pment f ailure (Emplain) 1-stanuat Preparation of Data Entry Sheets 8-Maintenance or Test 2-manual Scram for Licensee Event Report (LER) File C-sefueling 3-Automatic Scram (st:tEG0161).

D-Regulatory Restriction 4-Cont *d. from Previous month E-Operator Training & License Ease 5-Reduction 5

F-A hinistrative 9-Other Ephibit E-Same Source.

C-Operational Error (Emplain) n-Other (Imptain)

taiUWTIVE StMMRY OF l

!OmtLY OIU%T193 D37RIDiCC UllIT 2 JNUARY 1992 Janumy 1 7ho Unit operattd at a txrsimi valuo of 100% output.

through January 21 January 22 At 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br /> the Unit ctrmenced Icad rtduction to less than 30% outInt to repair tubo leaks in the Unit's min cadermer.

January 23

'Iho Unit continued to operato at approxim toly 30% output while rqair of tubo leaka continued in the Unit's min cordermer.

January 24 At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Unit txnan escalation to a txnimi value of 100% cutput.

100% output was achicycd at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />.

January 25 Uho Unit cporated at a tranimi value of 100% output.

through January 27 January 28 At 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br /> the Unit hermd load reduction to approximately 78% output to rcroir tute leaks in the Unit's min cordensor.

January 29 The Unit ooritifurd to operato at approximately 78% output khilo tluvugh repair of ttia 'eds continued in the Unit's min cordenser.

January 30 January 31 At 0133 hours0.00154 days <br />0.0369 hours <br />2.199074e-4 weeks <br />5.06065e-5 months <br /> the Unit bogan escalation to a namimi value of 100% output.

100% cutput was achieved at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit commenood load riduction to approximately 80% to permit min cordenser waterbox cleanhq.

i l

l

AVER /G IAILY LUIT IGH 11NEL 00CiTP 10.

50-412 Uti1T,JUPS Unit 2 IRTE

.Feb._5, 1992 OC14PIL'IID Irl Lavid T. Jones _

'IrlD1 DIE f4121 39).201;L FQTIll,,Jatstry 1992 LWY AVERtGE EAILY 1%'ER IJNEL (WY AVITVGE [ WILY 1%E IIVEL (14b-110t)

(14&lict) 1 816-17 811 2

814 18 814 3

809 19 813 4

810 20 812 5

815 21 805 6

815 22 781 7

815 23 206 8

815 24 654 9

808 25 814 10 812 26 812 11 814 27 809 12 811 28 759 13 806 29 625 14 813 30 629 15

.315 31 781 16-815 I!1STRUCI'ICt1S:

On this fonat, list the average daily unit power level MWe-tiet for each day in the reportirg nonth, ccupute to the raunst wrcle magavatt.

. _... _ _. _. _. - _ _.. _. _ _ _. - - _.. _.- _. _ m

..m.-

4 OPERATING DATA REPORT DOCKET NO,:

50 412 RFPORT DATE:

02/04/92 COMPLETED BY: DAVID T.-JONES

-TELEPHONE:

(412) 393 7612

' OPERATING-STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2-Notes
2. REPORTING PER'^D: JANUARY 1992
3. LICENSED THE W. ""ER (MWt):

265?

4, FU(EPLATE RATI:E

...oss MWe):

923

5. DESIGN ELECTRICat.I'.ATING-(Net MWe):

836

6. MAX. DEPENDABLE CAPACITY-(Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

]

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF 'ANY (!Iet MWe):

'None

10. REASONS-FOR-RESTRICTIONS, IF.ANY:

N/A i

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN Pe.*'ORTING _ PERIOD:

744,0 744.0 36879.0 12 NO.40F MRS.- REACTOR WAS CRITICAL:

744,0 744,0 31824.2

- 13. REACTOR RESERVE SHLIDOWN HOURS:

0.0

. 0,0 -

0,0

-14. HOURS GENERATOR WAS ~ 0N LINE:

744.O' 744,0 31626.0 15.-UNIT RESERVE SHUTDOWN HOURS:

0,0

-0.0 0.0 16.; CROSS; THERMAL-ENERGY GEN.-(MWH):

1870700,0 1870700.0 77230447,4 17, CROSS ELECT. ENERGY GEN.-(MVH):

605537.0-

-605537,0-24780118.0

- 18. NET ELECTRICAL ENERGY GEN. (MVH):

574123,0 574123.0 23379608.0

19. UNIT SERVICE FACTOR:'(PERCENT)

~

100.0 100.0-85,8

20. UNIT'AVA11 ABILITY FACTOR:(PERCENT)

-100.0 100.0 85,8 2L UNIT CAPACITY FACTOR-(MDC): PCT 94.1 94.1 76.5 22, UNIT CAPACITY FACTOR'(DER): PCT 92.3 92.3 75.8 23.JUNIT FORCED OUTAGE RATE:/(PERCENT)

-0.0

0,0

-3. 8

24. = :ittUTDOWNS SCHEDULED OVER NEXT SIX MLNTHS (TYPE,DATE, AND DURATION OF EACH):

THE-UNIT'IS SCHEDUTrn TO SHUTDOWN FOR 1 1 THIRD REFUELING OUTAGE ON MARCH 13. 1992.

THE REFUELING OUTAGE It. SCHEDULED TO LAST FOR-70 DAYS.

25e IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

16. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ~ ELECTRICITY N/A-N/A COMMERCIAL OPERATION N/A N/A-

UNIT SHUTDOWNS AND POWER REDUCTIONS Q20%1 Docket no.

50.12 Unit Name BVPS Unit e2 Date rebruary 5. 1992 Completed By David Y.

Jones REPORT MOWTN JANU8RY 199?

Telephone (4121 393-7612 Method of Licensee Cause & Corrective Duration Shutting-Event System Compor.ent Action to No.

Date Typel (Nours)

Reason 2.

Down Reacter3 Report #

Code 4

' Codei Prevent Recurrence 1

920122 f

0 a'

5 m/A pC nTEXCM Unit reduced output to appron. 30%

to repair tube leaks in the Unit's Main Condenser.

2 920128 F

0 B

5 N/A HC MTEXCM Unit reduced output to approx. 78%

to repair tube leaks in the Unit's Main Condenser.

3 920131 S

0 8

5 m/A NC WTEXCM Unit reduced output from 100% to 80% to permit cleaning the waterboxes of the Unit's Pain Condenser.

1 1

2 3

4 F-Forced Reason:

Method:

Exhibit F-Instructions for S-Scheduled A-Equipment Falture (Emplain) 1-Manual Preparation of Data Entry Sheets P-Maintenance or Test 2-Manual **rac for Licensee Event Report (LER) file C-Refueling 3-Automatic Scres (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous month r

E-Operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit M-Same Sour *.e.

G-operational Error (Explain) n-Other (Explain) i

.-