!DflitLY OIUaTI!G IXIYRIDiCE UllIT 1 JNUARY 1992 January 1
'1ho Unit operated at a tunimi value of 100% cut ut.
T thtugh January 31 9202110257 920207 PDR ADOCK 05000334 R
N/DVCE MILY U!i1T 10i13 IJNI'.L IDCITI' lo. J0-334 UllIT E IS Unit 1 IWII Jchui,_.1222._
CUTILTED DY,_ David T. Jcr A TCIII1KtfC
[1121 393-7612-IDRI11_Januarv 1992
[WY AVUVCE tRILY TOi1R 11NEL
[AY AVDVCE 1%ILY 10FJ111NEL
(!Glo-!1et)
(14Jo-lict) 1 833 17 837 2
829 18 825 3
829 19 833 4
821 20 825
_m 5
829 21 011-6 829 22 825
[
7 81 2, 23 829 8
833 24 829 q;
.n 9
833 25 833 10 833 26 821 11 821 27 829 12 833 28 829 6x
"'~
13 829 29 829 14 225 30 833 15 829 31 829 16 825 IllSTIUCTIC41S:
On this formt, list the average daily unit puer level IMe-liet for each day in the reportirrJ renth. Otrqxito to the nearest whole mogmatt.
c.
i
OPERATING DATA REPORT j
DOCKET NO.:
50 334
-REPORT DATE:
02/04/92 l
COMPLETED BY: DAVID T. JONES
-l TELEPHONE:
(412)'393 7612 OPERATING STATUS i
1J UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORT!NG PERIOD: JANUARY 1992
- 3. LICENSED THERMAL POWER -(MVt):
2652
- 4. NAMEP1 ATE RATING (Cross MWe):
923-
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
-6. MAX DEPENDABLE CAPACITY (Gross MWe):
860-
- 7. MAX.-DEPENDABLE CAPACITY (Net MWe):
810'
-j 8; IF CilANCES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT. GIVE REASONS:
9.. POWER 1.EVEL TO VHICH RESTRICTED. IF ANY (Not DVe):
None
[
104' REASONS.FOR RESTRICTIONS. IF.ANY:
N/A
}
+
Tills MONTH-YEAR TO DATE CUMULATIVE 110 ll0URS IN REPORTING PERIOD:-
744,0 744.0 138096.0
.12. No..OF HRS. -REACTOR WAS CRITICAL:
744,0 744,0 86067.6--
t
- 13. REACTOR RESERVE SHUTDOWN 110 URSI 0.0' O.0 4482,8 i14.Lll0URS GENERATOR WAS ON LINE:
-744.0:
744.0 84175.2
~15. UNIT RESERVE SHUTDOVN HOURS:
0.0-0.0 0.0 116 : CROSS THERMAL ENERGY CEN. (MVH):
1968906.0
.1968906.0.
200481082.5 D17. CROSS ELECT ENERGY GEN.'(MVH):
653040.0 653040.0 64451443.0-i 118.. NET ELECTRICAL' ENERGY GEN. (HWI):
617390.0 617390.0-60184940'0-M 519.; UNIT SERVICE FACTOR -(PERCENT). -
100.0
-100.0:
63,0L l
= 20. UNIT AVA11 ABILITY FACTOR:(PERCENT)-.
?100,0 100.0-63.0 1
'21.LUNIT CAPACITY FACTOR (MDC): PCT 102.4 102.4 56.5 i
- 22. UNIT CAPACITY FACTOR (DER): PCT 99.4
- 99. 4 '.
54.8 23." UNIT FOACED. OUTAGE RATE:-(PERCENT) 0.0-0.0
-16,6
- 24. SHUTDOWNS - SCHEDULED OVER NEXT SIX MONTils.(TYPE.DATE. AND DURATION OF EACH):
- 25. IF SHUT-DOVN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
l
- 26. UNITS IN TEST STATUS (PRIOR TO. COMMERCIAL OPERATION)
i
, FORECAST
. ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A
-COMMERCIAL-OPERATION N/A-N/A I
.l d
m.
i UNif SCIDOWas AuD POWER REDUCTIous Q2C1)
Docket wo.
50-334 Unit meme ev's (W t si i
Date Wvery L 1992 Completed Sy Pow'd T.
Jm EEPORT 9804T8t J AaOAtf 1992 Telephone (412) 3o3-7At2 4
Method of Licensee Cause & Corrective Ouration Sauttiog Event System Component setion te No.
Date Typel (tours) acason2 Doun acactor3 seport #
Code 4 Code 5 Prevent Recurrence
~
monE 4
h i
I i
1 2
3 4
F-Forced Reason:
method:
Exhibit F-Instructions for S-Scheduled A-141pment f ailure (Emplain) 1-stanuat Preparation of Data Entry Sheets 8-Maintenance or Test 2-manual Scram for Licensee Event Report (LER) File C-sefueling 3-Automatic Scram (st:tEG0161).
D-Regulatory Restriction 4-Cont *d. from Previous month E-Operator Training & License Ease 5-Reduction 5
F-A hinistrative 9-Other Ephibit E-Same Source.
C-Operational Error (Emplain) n-Other (Imptain)
taiUWTIVE StMMRY OF l
!OmtLY OIU%T193 D37RIDiCC UllIT 2 JNUARY 1992 Janumy 1 7ho Unit operattd at a txrsimi valuo of 100% output.
through January 21 January 22 At 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br /> the Unit ctrmenced Icad rtduction to less than 30% outInt to repair tubo leaks in the Unit's min cadermer.
January 23
'Iho Unit continued to operato at approxim toly 30% output while rqair of tubo leaka continued in the Unit's min cordermer.
January 24 At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Unit txnan escalation to a txnimi value of 100% cutput.
100% output was achicycd at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />.
January 25 Uho Unit cporated at a tranimi value of 100% output.
through January 27 January 28 At 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br /> the Unit hermd load reduction to approximately 78% output to rcroir tute leaks in the Unit's min cordensor.
January 29 The Unit ooritifurd to operato at approximately 78% output khilo tluvugh repair of ttia 'eds continued in the Unit's min cordenser.
January 30 January 31 At 0133 hours0.00154 days <br />0.0369 hours <br />2.199074e-4 weeks <br />5.06065e-5 months <br /> the Unit bogan escalation to a namimi value of 100% output.
100% cutput was achieved at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit commenood load riduction to approximately 80% to permit min cordenser waterbox cleanhq.
i l
l
AVER /G IAILY LUIT IGH 11NEL 00CiTP 10.
50-412 Uti1T,JUPS Unit 2 IRTE
.Feb._5, 1992 OC14PIL'IID Irl Lavid T. Jones _
'IrlD1 DIE f4121 39).201;L FQTIll,,Jatstry 1992 LWY AVERtGE EAILY 1%'ER IJNEL (WY AVITVGE [ WILY 1%E IIVEL (14b-110t)
(14&lict) 1 816-17 811 2
814 18 814 3
809 19 813 4
810 20 812 5
815 21 805 6
815 22 781 7
815 23 206 8
815 24 654 9
808 25 814 10 812 26 812 11 814 27 809 12 811 28 759 13 806 29 625 14 813 30 629 15
.315 31 781 16-815 I!1STRUCI'ICt1S:
On this fonat, list the average daily unit power level MWe-tiet for each day in the reportirg nonth, ccupute to the raunst wrcle magavatt.
. _... _ _. _. _. - _ _.. _. _ _ _. - - _.. _.- _. _ m
..m.-
4 OPERATING DATA REPORT DOCKET NO,:
50 412 RFPORT DATE:
02/04/92 COMPLETED BY: DAVID T.-JONES
-TELEPHONE:
(412) 393 7612
' OPERATING-STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2-Notes
- 2. REPORTING PER'^D: JANUARY 1992
- 3. LICENSED THE W. ""ER (MWt):
265?
4, FU(EPLATE RATI:E
...oss MWe):
923
- 5. DESIGN ELECTRICat.I'.ATING-(Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY-(Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
]
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF 'ANY (!Iet MWe):
'None
- 10. REASONS-FOR-RESTRICTIONS, IF.ANY:
N/A i
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN Pe.*'ORTING _ PERIOD:
744,0 744.0 36879.0 12 NO.40F MRS.- REACTOR WAS CRITICAL:
744,0 744,0 31824.2
- 13. REACTOR RESERVE SHLIDOWN HOURS:
- 0.0
. 0,0 -
0,0
-14. HOURS GENERATOR WAS ~ 0N LINE:
744.O' 744,0 31626.0 15.-UNIT RESERVE SHUTDOWN HOURS:
0,0
-0.0 0.0 16.; CROSS; THERMAL-ENERGY GEN.-(MWH):
1870700,0 1870700.0 77230447,4 17, CROSS ELECT. ENERGY GEN.-(MVH):
605537.0-
-605537,0-24780118.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
574123,0 574123.0 23379608.0
- 19. UNIT SERVICE FACTOR:'(PERCENT)
~
100.0 100.0-85,8
- 20. UNIT'AVA11 ABILITY FACTOR:(PERCENT)
-100.0 100.0 85,8 2L UNIT CAPACITY FACTOR-(MDC): PCT 94.1 94.1 76.5 22, UNIT CAPACITY FACTOR'(DER): PCT 92.3 92.3 75.8 23.JUNIT FORCED OUTAGE RATE:/(PERCENT)
-0.0
- 0,0
-3. 8
- 24. = :ittUTDOWNS SCHEDULED OVER NEXT SIX MLNTHS (TYPE,DATE, AND DURATION OF EACH):
THE-UNIT'IS SCHEDUTrn TO SHUTDOWN FOR 1 1 THIRD REFUELING OUTAGE ON MARCH 13. 1992.
THE REFUELING OUTAGE It. SCHEDULED TO LAST FOR-70 DAYS.
25e IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 16. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ~ ELECTRICITY N/A-N/A COMMERCIAL OPERATION N/A N/A-
UNIT SHUTDOWNS AND POWER REDUCTIONS Q20%1 Docket no.
50.12 Unit Name BVPS Unit e2 Date rebruary 5. 1992 Completed By David Y.
Jones REPORT MOWTN JANU8RY 199?
Telephone (4121 393-7612 Method of Licensee Cause & Corrective Duration Shutting-Event System Compor.ent Action to No.
Date Typel (Nours)
Reason 2.
Down Reacter3 Report #
Code 4
' Codei Prevent Recurrence 1
920122 f
0 a'
5 m/A pC nTEXCM Unit reduced output to appron. 30%
to repair tube leaks in the Unit's Main Condenser.
2 920128 F
0 B
5 N/A HC MTEXCM Unit reduced output to approx. 78%
to repair tube leaks in the Unit's Main Condenser.
3 920131 S
0 8
5 m/A NC WTEXCM Unit reduced output from 100% to 80% to permit cleaning the waterboxes of the Unit's Pain Condenser.
1 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Falture (Emplain) 1-Manual Preparation of Data Entry Sheets P-Maintenance or Test 2-Manual **rac for Licensee Event Report (LER) file C-Refueling 3-Automatic Scres (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous month r
E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit M-Same Sour *.e.
G-operational Error (Explain) n-Other (Explain) i
.-