ML20091S212
| ML20091S212 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/30/1995 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20091S213 | List: |
| References | |
| NUDOCS 9509080041 | |
| Download: ML20091S212 (4) | |
Text
f Il.
I DukeIbwerCompany T. C hichfrzxw hicGuire Nuclear Generanon Departrnent Vice President 12iDOHagers fenyRoad(kIG0ltP)
(704)s754300 Hunterwille. NC28078K65 (70,q)g751809 Fax DUKEPOWER August 30,1995 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Administrative Change for Proposed Changes to Technical Specification 3/4.3.1 and 3/4.3.2
Reference:
January 13,1995 Technical Specification Change Submittal
Dear Sirs:
Attached is a revision to the submittal for Changes to Technical Specification 3/4.3.1 and 3/4.3.2 transmitted via letter dated January 13,1995. His revision corrects an administrative error irr the submittal package. On TABLE 4.3-2, Engineered Safety Features Actuation System Instrumentation Surveillance Requirements, Functional Item Sc - Doghouse Water Level-High (Feedwater Isolation Only) - was inadvertently omitted from page 3/4 3-36. De markup previously submitted did not reflect a correction to Amendment No. 56/37 issued by the NRC to McGuire Nuclear Station on June 16,1986. This administrative revision reinserts Functional item Sc. Functional item Sc was not part of the technical changes contained in the above referenced submittal.
Two editorial corrections were also made. He first is in the headings of columns 5 and 6 on TABLE 4.3-1, page 3/4 3-12. The second is a typo correction in " Insert A" for ACTION 7 on page 3/4 3-7 of the original submittal. The rernainder of the submittal has been reviewed and is correct as submitted.
If there are any questions, please contact Dwin Caldwell at 704-875-4328.
\\'ery Truly Yours, T. C. McMeekin Vice President, McGuire Nuclear Station 070060 9509080041 950830 8
PDR ADOCK 05000369 1(
l P.
PDR.
-.---- _ ~
- - - -._~
i i
1 U. S. Nuclear Regulatory Commission Date: August 30,1995 Page 2 T. C. McMeekin, being duly sworn, states that he is Vice President, McGuire Nuclear generation Department, Duke Power Company: that he is authorized on the pan of the said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station i
Final Safety Analysis Repon and that all statements and matter set forth therein re true and correct to the best of his knowledge.
Ko&M T. C. McMeekin, Vice President McGuire Nuclear Station Subscribed and sworn to me this 30th day of August,1995 Ab 1. 7Dm/du N/ary P[lle
[
My Commission expires:
dah!
/
F
U. S. Nuclear Regulatory Commission Date: August 30,1995 Page 3 xc:
Mr. Victor Nerses U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation, Mail Stop 14H25 Washington, D. C.
20555 Mr. S. D. Ebneter Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Ga.
30323 Mr. Robert E. Martin U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
20555 Mr. George F. Maxwell NRC Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Division of Radiation Protection P. O. Box 27687 Raleigh, N. C.
27611-7687 i
U. S. Nuclear Regulatory Commission Date: August 30,1995 Page: 4 bxc:
A. V. Carr (PB05E)
NSRB Staff (EC05N)
J. E. Snyder R. J. Deese G. A. Copp J. E. Burchfield Z. L. Taylor V. M. Coren ELL (EC050)
P. R. Herran
,