ML20091Q922

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E Vital Instrument Buses & 49, Interlocks & LCOs for Class 1E Tie Breakers. List of Plant Equipment & Procedures Per Generic Ltr Encl
ML20091Q922
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/31/1992
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-048, REF-GTECI-049, REF-GTECI-NI, TASK-048, TASK-049, TASK-48, TASK-49, TASK-OR GL-91-11, NUDOCS 9202050186
Download: ML20091Q922 (5)


Text

_ _ - - _ _ _ _ _ _ _ _ _

e 4

B ALTIMORE l

GAS AND ELECTRIC

\\

1650 CALVERT CUFFG PARKWAY e LOSBY, MARYLAND 20057 4702 GEoRot C CattL vict Passiorwt j

NucttanENtmov (410) #90 4 4 6B January 31,1992 U, S. Nuclear Regulatory Commission Washington, DC 20555 A1TENTION:

Document Control Der,k SU13 JECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50 317 & 50 318 Resolution of Generic issues 48, LCOs for Class 1E Vital Instrt inent liuses,"

and 49, "Interk>cks and LCOs for Class 1E Tie 13reakers" Pursuant to 10 CFR 50,54m

REFERENCES:

(a)

Generic letter 9111, Resolution of Generic hsues 48, "LCOs for Class IE Vital Instrument Buses,* and 49, " Interlocks and LCOs for Class 1E Tie Dreakers" Pursuant to 10 CFR 50.54(f)

(b)

NURPG/CR 5414; Technical Findings for Pro msed Ir.tegrated Resolution of Generic issue 128, Electric Power Re'iability Gentlemen:

In accordance with 10 CFR 50.54(f) and the Atomic Energy Act, we hereby certify that we have implemented the appropriate procedures conforming to the guidance provided in Enclosure 1 to Generic letter 91-11 (Reference a). Specifically, the generic letter requests thr.t we ensure Calvert Cliffs Nuclear Power Plant (CCNPP) has procedures that include time limitations and surveillance requirements for the following plant equipment:

+

Vitalinstrument buses,

+

Inverters or other onsite power sources to the vital instrument buses, and

+

Tie breakers that can connect redundant Class 1E buses (AC or DC) at one unit or that can :onnect Class IE buses between units.

/

k 0 ([/

Ao1 f

(, o '

I I

920205o106 920131 ADOCK0500g7 PDR P

- _ ~ -. _ - - - _. _

l Document Control Desk January 31,1W2

,l'ay:2 For plant proceduies that do not include time limitations or surveillance acquirements, the generic letter requests that we ensure that we have adequately evaluated the bws for such a decision.

Attm hment (1) lists the plant equipment and procedurer, that are in the scope of the generic letter.

Plant equipment that does not use tie breakers is outside the scope of the generic letter.

Should you have any further questions regarding this inatter, we will be nicased to discuss them with you.

i

[

Very truly yours, q

,, 'j /,

,/ \\

,3

{l,

' I is (a)

,h 1

/

STATE OF MARYLAND I I

TO WIT 1

COUNTY OF CALVERT t

I hereby certify that on the 31st day of January,lu, /

('r,.,2 lW2, before me, the subscriber, a Notary Public of the State of htaryland in and for Co

/1

, personally appeared George C. Creel, being duly sworn, and states that he is Vic6 President of the llaltimore Gas and Electric Company, a corporation of the State of htaryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and coricci to the best of his knowledge,information, and belief; and that he was authorized to provide the response on behalf of said Corporation.

/

WITNESS my lland and Notarial Scal:

(%

l d

Notary Public i

bl#^ 4

'/

hiy Commission thpires:

A D. tis GCC/JhtOldhn Attachment cc:

D. A. Brune,lhquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. hicDonald, Jr., NRC T, T. hlartin, NRC L E. Nicholson, NRC R.1. hicLean, DNR J.11. Walter, PSC

Alfo.CilMENT (l1 Plant Equigunent und Procedurts in the Scupe of Gtncile 14tter 91 11 SYSTral/COMPONhu filDG181Rf/SURVEllJAhfE I.

4 LV UNIT BUSES 4 kV lius lireakers No Tie Ilreakers lictween Units or lluses Ilus ll(ZA) llus 14(Z13)

Ilus 21(7A)

Bus 24(Zil) 11.

480V SERVICE TRANSFORMERS AND 11USES U-44011 A(ZA)

No Tie Dreakers lletween Salety Related U-440-Illl(ZA)

Portion of the 480V lead Center Systerns U 44014A(Zil)

U.440-1413(Zil)

U-440 21 A(ZA)

'U-440-2111(ZA)

U 440 24A(Zil)

U 440 24B(ZH) 111.

MOTOR CONTROL CENTER IlUSES WITil TIE IIRi?AKERS MCC 104R(ZB)$210420 Operating Instruction (01) 27D, " Station MCC 114R(ZA) $2-11420 Power 480 Volt Systern" and Surveillance MCC 204R(ZD) 52-20420 Test Pmecdure (STP OM1(2),"Isreaker MCC 214R(ZA) 52 21420 1ine up Verification" IV.

125V DC BUSES (STATION llATTERIES) 111D01 No Tie Ilreakers 121D02 212D01 22 2D02 01 (Reserve Battery) 4 1

~

i M A G W E ET_ID Plant Equipment und Peuceduits in the Scope of Generir letter 91 11

!DHlih!LCOMPONENI j'l(OCICl)UJ[li$Uln'Ltl,lANG Y.

STATION llA'ITERY CllARGERS AND Tillillt I'liEDS DC 11US 11 No Tie lireakers: Each Safety.Related DC 111D05480 UNIT 110S 11 A Ilus is fed by parallel llattery Chargers.

23 2D074SO UNIT llUS 21 A DC 110S 12 12 ID06480 UNIT 11U31411 24 2 Dos 480 UNIT llUS 2411 DC 13US 21 131D07480 UNIT IlUS 14A 212D05480 UNIT llUS 24A DC !!US 22 14 ID08480 UNIT llUS t ill 22 2D06480 UNIT llUS 2111 VI.

Rl! SERVE IINITliRY SYSTliM llUS 01 1D$4 Transfer Switch No Tie lireakers 1D58 Disconnect Switch to Unit 1 Ilatteries ID59 Disconnect Switch to Unit 2 llatteries VII.

7.5 kVA INVERTERS AND TillilR Fl!EDS No.11 IlUS 11 No Tie lireakers; Only Kirk Key-locked No.12 IlUS 21 Transfer Switches No.13 ilUS 12 STP OM1(2),"11:caker 1.ine-up No.1411US 22 Verification" No. 21 IlUS 11 012611,"120 Volt Vital AC and Computer No. 2211US 21 AC" No. 23 IlUS 12 No. 24 IlUS 22 Vill.

7.5 kVA INVERTliRS AND TilEIR 120V AC VITAL PANiiLS 1Y01/1Y01 1(ZA)

No Tie lireakers: Only Kirk Key locked i

2Y01/2Y01 1(ZA)

Transfer Switches 1YO2/1YO2-1(Zil)

STP OMl(2),llreaker Line up Verification" 2YO2/2YO21(Zil) 01-2611,"120 Volt Vital AC and Computer 1YO3/1YO31(ZC)

AC" 2YO3/2YO31(ZC) 1YO4/1YO41(Zil) 2YO4/2YO41(Zil) l 2

- ~.

NITetCID1ENT..fi)

Plant Equipment and Procedures in the Scope of Generic letter 91 11 SYSTI3ttCOMPONENT 11100E11111117StiIWi:ll!1ANC1; IX.

125V DC UNIT CONTROL PANELS DC.11, DC 12, DC-13, DC 14 No Tie lireakers DC 15, DC 16, DC 17 DC 21. DC 22, DC 23, DC 24, DC 25, DC 26. DC-27 X.

EhtERGENCY DIESEL GENERATORS (EDG) 11(ZA)

No Tie lireakers: Only Kirk Key locked 12(ZC)

Transfer Switches 21(Zil)

STP-O-8A(ll) 1(2) tests EDGs and their associated 4kV bus LOCl Sequencers OI 27C, "4.16 kV System" XI.

EMERGENCY DIESEL GENERATOR MCC 13USES MCC 11G(ZA)

No Tic 13reakers; Only Auto Transfer MCC 12fl(ZC)

Switches MCC 21G(Zil) i 3

.. ~

_. _... _ _. _. _ _.. _, _ _ _. -