Responds to NRC Re Violations Noted in IE Insp Rept 50-483/82-21.Corrective Actions:Five Remaining Cables Suspected of Having Exceeded Allowable Sidewall Pressure Tested Per E01013(Q) & Found Acceptable
ML20091M912
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/14/1984
From: Schnell D
UNION ELECTRIC CO.
To: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20091M893 List:
References
ULNRC-820, NUDOCS 8406120145
Download: ML20091M912 (2)


Text

ff 4

^

a, UNION ELECTRIC COM PANY g

190 8 GRATIOT STREET ST. Lou tS, MISSOURI d suno Aoonass:

=="3a0,"c""*"-

May 14, 1984

,,,co ;, 2,;,'ff,,,,,,

Mr. W.

S. Little, Chief Project Engineering Branch U.'S. Nuclear Regulatory Commission

' Region _III

-799 Roosevelt-Road Glen Ellyn, IL 60137

Dear Mr. Little:

ULNRC-820 INSPECTION REPORT NO. 50-483/82-21 Ref.:

1)

NRC letter dated August 26, 1983, Little to Schnell 2)

ULNRC-653, dated August 16, 1983 i

This reply is in response to Reference 1 which requested

'that we notify your office when the corrective actions taken in response to Item of Noncompliance 82-21-07 (and described in Reference 2) were completed.

The five remaining cables which were suspected of having exceeded the allowable sidewall. pressure have been tested per

--E-01013 (Q) and found' acceptable.

In regard to the cable vendor's test program, the final results have' yielded allowable sidewall pressure values similar to those which had been provided to us as a result of the interim test, and consequently have no impact on_the Callaway installation.

If you have any questions regarding this response or if additional _information is required, please.let me know.

Very truly.yours, l

... =

Donald F.

Schnell.

-JGJ/msc cc:

W. L.fForney,.NRC Region III-NRC Resident Inspectors,-Callaway1 Plant- (2)

Missouri'Public Service Commission 64@ 4 gN(1

^ ~ -

94061P0145 840606' PDR ADOCK 05000483

~

Li-G

_ PDR a

h:m~

E1- _

---a

~-

z m

9 I

DETAILS 1.

Persons Contacted Union Electric Company (UEco)

  • W. H. Weber, Manager, Nuclear Construction M. I. Doyne, General Superintendent, Callaway Construction T. H. McFarland, Superintendent, Nuclear Engineering
  • J. R. Veatch, Supervising Engineer, Construction QA
  • J. V. Laux, Supervising Engineer
  • D. A. Bruyer, QA Consultant
  • H. S. Elkins, Audit Response Coordinator
  • B. K. Stanfield, QA Assistant Engineer Daniel International Corporation DIC
  • M. S. Stokes, Project Electrical Manager
  • D. C. King, Construction Manager
  • H. K. Smith, Audit Response Coordinator
  • K. A. Distel, Instrumentation Supervisor
  • R. H. Glassner, Compliance Supervisor
  • D. A. Boone, SQE
  • D. L. Vandangraft, Senior Quality Assurance Engineer
  • D. F. Burlison, SEQS
  • R. A. Somers, PQIM a9
  • R. C. Byrd, PQSE
  • W. A. Norton, Electrical Compliance Engineer C. E. Wilson, Quality Assurance The inspector also contacted and interviewed other licensee and contractor personnel, including crafts persons, technical and engineering staf f members.
  • Denotes those persons present at the exit interview on December 2,1983.

2.

Licensee Action on Previous Inspection Findings (Closed) Noncompliance (483/82-21-07):

It was previously identified that the tension exerted in pulling Class IE cable No. IALB01AA, apparently resulted in the maximum allowable sidewall pressure exceeding Bechtel's design specification.

In addition, tension limitations as a function of allowable sidewall pressure had been mis-calculated.

Subsequently, the licensee examined and evaluated the installation records of a total of 114 cables and determined that eleven 5KV cables and one 600V cable had apparently been overtensioned.

Bechtel provided guidelines for the disposition of cables whose training bend radius and/or sidewall pressure requirements that been violated. DC volatge Hi Pot tests were performed using a 36KV test voltage and documented. Results of the tests were evaluated and determined to be acceptable.