Interim Deficiency Rept DER 83-66 Re Auxiliary Feedwater Pump.Initially Reported on 831011.Submittal of Final Rept Delayed Until 840715 Due to Extensive Investigation & Evaluation Required.No New Info or Change to Interim Rept
ML20091M582
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/31/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29627-TRB, DER-83-66, NUDOCS 8406110353
Download: ML20091M582 (2)


Text

7-F-

e F3:3%u Q.?

Arizona Public Service Company I

f --

@ Jj" -[P.o.Shxht6[6 PHOENIX. ARIZONA 85036 May 31, 1984 r

L

' m t

ANPP-29627-TRB/TDS U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park

'450 Maria Lane - Suite 210 11ainut Creek, California 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-66 A 50.55(e) Potentially Reportable Deficiency Relating to Unit #1 Auxiliary Feedwater Pump File: 84-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Narbut and R. Tucker on October 11, 1983 (B) ANPP-28199, dated November 8, 1983 (Interim Report)

(C) ANPP-28615, dated January 13, 1984 (Time Extension)

(D) ANPP-29128, dated March 22,1984 (Time Extension)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A),

~

an Interim' Report was transmitted by Reference (B) and Time Extensions were requested by. References (C) and (D). At that time, it was estimated that a Final Report would be available by June 1, 1984.

'Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by July 15, 1984, at which time, a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, E. E. Van Brunt, Jr.

APS Vice President Nuclear Productions ANPP Project Director EEVBJr/TRB:ske

.cc: See Page 2

'\\

$hO W'

S M

+

~

(?

~'

e sj

=-

.,o' b:: YR ~ ~

~

'U.:S..' Nuclear Regulatory Commission--

Region V-Attention:' Mr. T.li. Bishop,' Director b

.ANPP-29627-TRB/TDS'

May 31,'1984:

Page 2.

l.

h-.

I ccc: Richard DeYoung, Director Office:of Inspection and Enforcement U. S.. Nuclear Regulatory Commission Washiagton, D. C.

20555 y

T. G. Woods, Jr.

D. B.'arner K

LW. E. Ide D. B.'Fasnacht t

p

' A. C. Rogers B. S. Kaplan b

L. A. Souza D. F.l Fowler J. Vorees.

J. R. Bynum l

J. M. Allen P. P. Klute A. C.'Gehr

14. J..Stubblefield li. G. Bingham.

_R. L. Patterson R. W. Welcher

H.

D.' Foster f

D. R. Hawkinson L. E. Vorderbrueggen I

~G.'A.-Flore111:

S...R.

Frost' J. Self l

D. Canady Records. Center

- Institute of, Nuclear-Power Operations 1100 circle.75 Parkway Suite 1500 E

AtJanta, Georgia. 30339; i

i I

K:

j Es ;

i 1

h.

>