Milling Addrsts Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.
Senior Vice President Fhntndge Building AlabamaPower the southern electnc system April 26, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. S. A. Yarga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:
Attached for your infonnation is a status of outstanding licensing items identified in Alabama Power Company's letter dated November 4, 1983 and provided in a Project Status Meeting on March 8,1984 in Bethesda, Maryland. Alabama Power Company intends to submit this status on a periodic basis on the Farley Nuclear Plant Dockets until some mutually agreeable licensing status procedure can be established.
The format of the attachment is similar to the licensing status documents that Alabama Power Company has submitted in the past and is tabulated chronologically by Alabama Power Company's requested NRC approval date. A Licensing Action Report, prepared in a format suggested in the March meeting and containing all licensing issues, has been informally provided to the Farley NRC Project Manager.
Alabama Power Company is prepared to utilize the suggested NRC format in future submittal s.
If you have any questions, please advise.
Yours truly, i
/
Nl jg F. L. Cl ayton, Jr.
/
FLCJr/CJ S:1 sh-D16 Attachment cc: Mr. L. B. Long Mr. J. P. O'Reilly
/
Mr. E. A. Reeves Ol Mr. W. H. Bradford i
-t \\
8405040008 840426 PDR ADOCK 05000 P
ATTACit4ENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL l
PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMMtKS 10-25-82 01-06-84 COMPLETE 1.
Bnergency Preparedness Program Audit Once Per 12 Months, FNP-1 and 2 2.
Administrative 04-06-83 01-09-84 COMPLETE Change Footnote to T.S. Table 3.3-3 FNP-1 and 2
3.
Administrative 12-10-82 01-10-84 COMPLETE Change to T.S.
Tabl e 3.7-4a, FNP-2 4.
Change for 10-08-82 01-27-84 COMPLETE Turbine Valve Testing, FNP-1 and 2 5.
Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FHP-1 and 2 6.
Administrative 05-27-84 02-29-84 COMPLETE Change to Table 3.7-4a, FHP-1 02-22-84 04-12-84 04-16-84 54233 COMPLETE 7.
10CFR50.49 Environmental Qualification Exteasion Submittal, FNP-1 (Rule Extension 12-30-82 07-01-83 49374 8a. River Water (FNP-1)
System 06-20-83 Deletion, FNP-1 03-02-84 05-18-84 and 2 (T.S.
03-27-84 (Revised) 49375 3/4.7.5 and (FNP-2) 3/4.7.6)
ATTAC} MENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REIRRKS 8b. Diesel 08-03-82 07-01-83 49374 Generator 12-30-82 10-01-83 (FNP-1)
Overload Test, 06-03-83 FNP-1 and 2 01-31-84 05-18-84 49375 T.S.
03-02-84 (Revised)
(FNP-2) 4.8.1.1.2.c.5) 03-27-84 54237 9.
Movable Control 03-04-83 07-15-83 Rod Action 06-03-83 11-01-83 (FNP-1)
Statement FNP-1 07-28-83 and 2 (T.S.
10-10-83 05-25-84 54238 3/4.1.3) 02-17-84 (Revised)
(FNP-2) 10.
Safety 05-03-83 11-03-83 51629 Related 06-29-83 05-01-84 (FNP-1)
Battery 07-29-83 Surveillance, 08-29-83 06-01-84 51631 FNP-1 and 2 09-23-83 (Revised)
(FNP-2)
(T.S.3/4.8.2.3, 01-27-84 3/4.8.2.4 and 3/4.8.2.5)
- 11. Charcoal Filter 03-04-83 09-01-84 49953 (FNP-1)
Surveillance, 03-01-84 FNP-1 and 2 06-22-84 49954 (T.S. 4.77, (Revised)
(FNP-2) 4.78 and 4.9.14)
- 12. Li cense 11-24-82 09-01-83 47479 Condition 06-29-83 06-28-84 2.C(17) 03-23-84 Containment Mini-Purge, FNP-2 (T.S.3.6.1.7) 12-12-83 07-01-84 13.
Reactor Head G.L. 83-37 Vent and Other ITEMS 0737 Items, FNP-1 and 2 (Proposed T.S.
3/4.4.12 and existing T.S.
Tabl e 3.3-6, 3.3-11 and 3/4.6.4)
ATTACHMENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE i
REMARKS
- 14. Meteorological 03-02-84 07-08-84 Tower Instrument Surveill ance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5) 15a. Mechanical 11-24-82 09-01-83 49182 Snubber 11-24-82 09-01-84 Listing, FNP-2 (T.S. Table 3.7-48) 15b. Containment 11-24-82 09-01-83 49182 Penetration Overcurrent 09-01-84 Protection, FNP-2 (T.S.
Table 3.8-1)
- 16. Generic Letter 02-03-84 09-01-84 83-43, Reporting Requirements of 10CFR50.72 and 50.73, FNP-1 and 2
- 17. Correct snubber 05-27-83 09-01-83 53402 listing, FNP-1 12-08-83 09-01-84 (FNP-1) and 2 (T.S.
Unit 2 Table 3.7-4) 18a. Change the 03-01-84 09-01-84 monthly Channel
( Admini-calibration of strative the excore date) neutron detectors to every 31 EFPD FNP-1 and 2 (T.S. Table 4.3-1)
f ATTACIMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC EC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS i
18b. Correct the 03-01-84 09-01-84 Facility Organization Chart, FNP-1 and 2 (T.S.
Figure 6.2-2) 18c. Correct Valve 03-01-84 09-01-84 Numbers listed in the T.S.,
FNP-1 and 2 (T.S. Table 3.6-1) 19.
Respirator TBD 01-13-84 02-12-84 53468 Iodine Filter 02-10-84 (FNP-1)
Exemption 02-13-84 09-09-84 53469 Request, FNP-1 03-05-84 (Revised)
(FNP-2) and 2 20.
Increase Fuel 03-30-84 10-01-84 Enrichment Design Limit for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.
5.3.1 and 5.6.1.2)
! 21. RCS Pressure 04-10-84 10-06-84 Isolation Valve Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)
- 22. RWST and 06-01-84 12-01-84 Accumulator IST Justification, FNP-1 and 2 (IST Program) 01-85 23.
RCP Breaker 08-01-84 Position Trip Deletion, FNP 1 and 2 (T.S.
Tabl e 3.3-1)
ATTACMENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC MC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 24.
Special Test 08-01-84 02-01-85 Exception to El iminate Excessive Flux Mapping During Startup After R.O. FNP-1 and 2 (T.S.
3/4.10.2)
DELETED FROM
- 25. Waste Gas 08-01-84 02-01-85 Recombiner CONSIDERATI01 Analyzer Surveillance, FNP-1 and 2 (T.S. Table 4.3-9) 26.
Chlorine 08-01-84 02-01-85 Detection Systems 04-20-84 03-01-85 27.
Revised Heatup and Cooldown (FNP-1)
(FNP-1)
Curves based on Reactor Vessel 02-10-84 02-10-85 54234 Material (FNP-2)
(FNP-2)
(FNP-2)
Surveillance Program, FNP-1 and 2 (T.S.
3/4.4.10.1) 28.
Administrative 07-01-84 To be Change to deter-Correct T.S.
mined errors (e.g.,
Room Air Temperature Requirements for FNP-2, T.S. Table 3.7-8)
To be 29.
Technical 30 days Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.
of Section 3/4.3) gencric changes
ATTACIMENT PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC RC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 30.
Schedular 06-18-82 To be exemption to 07-27-82 deter-Appendix R mined Alternative Shutdown requirement, FNP-1 and 2
'l 1
-