Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER1999-07-12012 July 1999 Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209D9781999-07-0808 July 1999 Forwards Addl Info to Support EA of Proposed 990212 License Application ECR 98-01675,correcting Minor Administrative Errors in TS Figure Showing Site & Exclusion Areas Boundaries & Two TS SRs ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20209E1131999-06-30030 June 1999 Forwards Proprietary NRC Form 398, Personal Qualification Statement-Licensee, for Renewal of RO Licenses for EP Angle,Md Lebrun,Jh Seitz & Zi Varga,Licenses OP-10646-1, OP-11081,OP-11082 & OP-11085,respectively.Encls Withheld ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20209C1201999-06-30030 June 1999 Informs of Util Intent to Request Renewed License for PBAPS, Units 2 & 3,IAW 10CFR54.Licensee Anticipates That License Renewal Application Will Be Submitted in Second Half of 2001 05000277/LER-1999-004, Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities1999-06-20020 June 1999 Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities ML20196A5291999-06-14014 June 1999 Forwards Final Pbaps,Unit 3 TS Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal-hydraulic Stability Solution Hardware ML20195E6051999-05-27027 May 1999 Requests Exemption from Requirements of 10CFR72.44(d)(3) Re Submittal Date for Annual Rept of Principal Radionuclides Released to Environ.Exemption from 10CFR72.72(d) Re Storage of Spent Fuel Records,Additionally Requested ML20195B8171999-05-25025 May 1999 Forwards Final TS Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20195B6191999-05-19019 May 1999 Forwards PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 56 for 980101-1231, Per Section 6.9.2 of Ol. Trace Concentrations of Cs-137 Were Found in Sediment Consistent with Levels Observed in Previous Years ML20206P9171999-05-10010 May 1999 Updates Some of Transmitted Data Points Provided in Data Point Library ERDS for Pbaps,Units 2 & 3.Data Point Info Format Consistent with Guidance Specified in NUREG-1394 ML20206K6581999-05-0404 May 1999 Forwards PBAPS Bases Changes Through Unit 2 Bases Rev 25 & Units 3 Bases Rev 25.Bases Reflect Change Through Apr 1999, Thereby Satisfying Frequency Requirements of 10CFR50.71 ML20206D4651999-04-29029 April 1999 Forwards Rev 16 to UFSAR & Rev 11 to Fire Protection Program (Fpp), for Pbaps,Units 2 & 3.Page Replacement Instructions for Incorporating Rev 16 to UFSAR & Rev 11 to Fpp,Encl ML20207B8431999-04-23023 April 1999 Forwards Final Rept for 981117,plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific for Peach Bottom Atomic Power Station.One Deficiency & 27 Areas Requiring C/A Identified ML20206C5461999-04-20020 April 1999 Forwards Radioactive Effluent Release Rept 41 for Jan-Dec 1998 for Pbaps,Units 1 & 2. Revs Made to ODCM & Station Process Control Program (PCP) During Rept Period,Encl 05000277/LER-1999-003, Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding1999-04-16016 April 1999 Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept 05000278/LER-1999-001, Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv)1999-04-0808 April 1999 Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv) ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML20205F8981999-03-31031 March 1999 Provides Info Re Status of Decommissioning Funding for LGS, Units 1 & 2,PBAPS,Units 1,2 & 3 & Sgs,Units 1 & 2,per Requirements of 10CFR50.75(f)(1) ML18106B1411999-03-30030 March 1999 Forwards Decommissioning Info on Behalf of Conectiv Nuclear Facility License Subsidiaries,Atlantic City Electric Co & Delmarva Power & Light Co,For Listed Nuclear Facilities ML20205J0831999-03-26026 March 1999 Requests Enforcement Discretion from Requirements of PBAPS, Units 2 & 3 Ts.Enforcement Discretion Pursued to Avoid Unneccessary Plant Transient Which Would Result from Compliance with TS ML20205B6421999-03-24024 March 1999 Submits 1998 Annual Decommission Rept for Pbaps,Unit 1. There Were No Reportable Events Involving Unit 1 for 1998 1999-09-09
[Table view] |
Text
.
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL RESOURCES PENNSYLVANI A P.O. Box 2063 Harrisburg, PA 17170 ,
January 7, 1992 Radiation Protection (717) 787-2163 Mr. Malcolm R. Knapp, Director Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Gentlemen:
Subject:
Pennsylvania LLRW Shipment Inspection Report No. 50-277/PA-91-01 and 50-278/PA-91-01 On November 26, 1991, our engineers, Messrs. Stan Maingi and Rich Janati performed an inspection of LLRW shipment no. 1191-044 at the Peach Bottom Atomic Power Station. A copy of the inspection report no. 50-277/PA-91-01 and 50-278/PA-91-01 is~ enclosed with this letter. This report is being forwarded to you for docketing, distribution, and.any other' action you may deem necessary. This inspection was conducted-under the provisions of a Memorandum of Understanding between the Commonwealth of Pennsylvania and the Nuclear. Regulatory CommisElon-(NRC). A copy of this lotter and our inspection-report is being forwarded to the-Philadelphia Electric Company for information.
Within the scope of this inspection, no violations or deviations were noted.
Your cooperation with our staff and the Commonwealth of Pennsylvania is appreciated.
Sincerely,-
GW WilliamPP.Ofnal Dor Acting-Director e
Bureau of Radiation Protection Enclosure ces. Philadelphia Electric Company Recycled Paper h 9201280018 920115 PDR ADOCK 05000277 G PDR
Pa. Department of Environmental Resources Bureau of Radiation Protection Division of Nuclear Safety.
Report Nos. 50-277/PA-91-01 50-278/PA-91-01 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 Licensee Philadelphia Electric Company Delta, PA 17314 Facility Name: Peach Bottom Atomic Power Station Inspection Att Delta, Pennsylvania Inspection Conducted: November 26, 1991 Inspectors: $ds c/n S. Maingif Nucledt Engineer
_ //7/92_-
/Date
/
fn-<&
R. Janati,pActing Chief
!!7/93 Date Nuclear Safety Section Approved by:
W.
I P Dornsife-M //7)9 Date 2
Acting Director Bureau of Radiation Protection Inspection Summary: Inspection on November 26, 1991 (Inspection Report Nos. 50-277/PA-91-01:50-278/PA-91-01)
Areas Inspected: Announced inspection of the licensee's low level radioactive waste shipmenJ to the burial site including:
shipping documentation, packaging / package inspection, L labeling, marking,-placarding, vehicle inspection, radiation
!- and contamination surveys.
Resul'/2 No violations or deviations were identified.
l e
9 DETAILS 1.0 Personnel Contacted 1.1 Licensee Personnel Darryl--Lequia, Superintendent, Plant Services
- Martin Ryan,_Radwaste_ Engineer
- Fred Crosse,-Radwaste Shipping Supervisor
- Gerald Dworsak, Radwaste Shipping Physicist 1.2 U.S. Nuclear Reculatory Commission
- - J. Furia, Senior Radiation Specialist
- Denotes-those present at the exit meeting 2.0 Scope of the Inspection This inspection was conducted in accord.nce with.the Memorandura of Understanding (MOU) between the Commonwealth of Pennsylvania and the U.S. Nuclear Regulatory Commission. The-State. inspectors reviewed the licensee's low-level radioactive waste ship.nent no. 1191-044 to the Barnwell Wast + Management Facility according to the attached inspection checklist.
The shipment contained 5222 millicuries of dewatered bead and powdex resin recovered from condensate polishers packaged in NUPAC PL-210 liner and NUPAC 14/210L cask, loaded on a Tri-State Motor Transit flatbed for shipment to Barnwell, ,
South Carolina. . The-shipment was determined to be LSA,_and waste form was determined-to be class A unstable (AU) per '
Barnwell site disposal ~ criteria.
At previous occasions, the-inspector had observed the unloading of the liner from dewatering process cask to the
. shipment cask. From previous two observations, it seemed.that the mode of-transferring the liner was' deemed safe and prudent per AlJJUL considerations. At the time of this inspection, the liner transfer activity was not observed.
The radiological survey for the shipment was done after the truck'had been engaged with the flatbed trailer and parked in Lthe parking lot ready to leave the site. -The survey taken by the inspectors agreed with survey readings taken by_the licensee _radwaste shipment' group and the health physics group.
- The agreement was rather1close for trends-and readings.
~
T.
Seven: swipe samples were taken to check for loose
. contamination'on the cask. The= swipe resulte indicated very small amounts of removable contamination.
The manifest-had not been signed by the licensee representative becauseithe shipment had to be deferred, but
-the information filled seemed satisfactory and met the regulatory-requirements.
3.0 Exit Meetina An Exit Meeting was held with the licensee representatives (denoted in Section 1) at the conclusion-of the inspection on November 26, 1991. The inspectors summarized the scope and findings of the inspection..
+
i_
l o
i
. - , - - ~ . . - .
C PENNSYLVANIA DEPARTS 1ENT OF ENViltONMENTAL RESOURCES j BUREA U OF R ADIATION PitOTECTION j .
DIVISION OF NUCLE AR S AFETY n -
LOW LEVEL RADIO ACTIVE WASTE SHIPM ENT
,. INSPECTION REPOltT 50-277/PA-91-01 !
Report No. 50-278/P A-91-01 A. Generalinformation
- 1. Date ofInspection 11-26-91
- 2. Name ofShipper Philadelphia Electric Company - PBAPS
- 3. _ Name of Carrier Tri-State Motor Transit Company
- 4. Destination CNSI, Barnwell. S.C.
- 5. Verify Advanced Notification to the Consignee Date of Shipment 11-26-91 (Expected)
Expected Date of Arrival 11-27-91~
Any loading / unloading or operations instructions None (Fissile materials, and Type B or highway route controlled quantities 49 CFR 173.22(c) and burial site -
criteria, e.g., Barnwelli
- 6. Verify. Advanced Notificaticn to the State (s) NOT APPLICABLE (NA)
(Type B packages only - 10 CFR 71.97)
- 7. Package (s) Used X Cask' NUPAC 14/210L HIC X Liner NUPAC PL-210 Drums Boxes Other(Specify)
- 8. Number ofPackages One .
- 9. Method ofShipment A. Exclusivo Use B. Non. Exclusive Use
- 10. ' Transport Vehicle X Open Flatbed with cask Closed B. Shipping Documentation Checklist
- 1. X Shipping papers present (49 CFR 172.200,201,202,203]
- 2. X Proper shipping name and hazard class (172.202(all
- 3. X- _ Proper I.D. number (172 202(a))
1-
g ..
- 4. X Dewatered Resin
' Waste Description _
and
' total quantity by weight (lbs)(172,202(a)] _ 8420 7 202.10 volume (cu. ft.)(172.002(all1 . activity (Cl)(172.203(d)) _ 5.222 i 5, X Radlonuclides identified [10 CFR 20.311(b) & 49 CPR 172.203(d)]
- 6. X
- Total quantity of radionuclides !! 3, C-14, Tc.99 and 1-129 shown (10 CFR 20.311(b)]
- 7. X Waste classified and characterited properly (61.55,61.56 and 13TP)
-classification (Perform isa correct review ofdocumentation for classification and characterization to and reasonable) 8.-- X Description ofchemical/ physical form (172.203(d)] '
- 9. -NA Category oflabel applied to each package (172=203(d))
- 10. NA ;
T.I. assigned to each package bearing Y l! or Y III(172.203(d)) '
11, X Shipper's certification (172.204(all
- 12. .X Instruetions to carrier provided (173.441(c),173.425(b)](exclusive use only)
' C. Packaging / Package Inspection -
- a. _ Packaging Compliance NA
- Are authorized packages used? [173.415,173.4161 Package types used:
X LSA-strong tight (173.425(b)]
T DOT 7A, Type A NA Performance test records on file? [173.415(all DOT 55 NA NA7 Licensee aware of 6/30/85 cutotTon use?(173.416(all Requalified under DOT Spec. 7A or NRC COC's obtained? [173.415(b),173A16(b)]
NRC Certified -
N A ' Current NRC COC's on file? (10 CFR 71.12(c))
- N A - ' Registered with NRC NMSS as user? [71.12(c)l :
(Prior to the licensee's first use of the package)
. b. SecuritySeals and Package Integrity X-Security seals (173 A12(b)l(LSA-Exclusive use, closed vehicle exempt)
X Lids secure (173.475(c))
X-No visible damage or leakage [173.425(b)I X
_ Packages monitored for radiation (173 4411 and contamination {173 4431 2 '.
3 D' 14bsting, Marking and Placarding Checklist
- a. Labeling NA ' Packages labeled W 1, Y-II, Y-ll![172.403(b),(c))
(LSA Exclusiveuseexempt)
- NA
" Contents" and
- Activity" entered [172.403(g)]
NA Transport Index afHxed on Y-il, Y-Ill labels [172.403(g))
b .' Marking X
Packages marked properly, i.e., proper shipping name, identification number, DOT Spec.
number, NRC COC number, consignee or consignor's name and address, etc. [172.301,304,3061 NA Type A/ type B package marked " Type A" or " Type B"[172.310(a)]
X Gross weight marked if package exceeds 110 pounds (172.310(a), burial site criteria,-
e.g., Barnwell) .
X Waste class marked A-B-C stable / unstable!10 CFR 20.311(d)(2), burial site criterial X LSA - Exclusive use package marked " RADIOACTIVE-LSA"[173.425(b)]
- c. Placarding X
Placards on each end and sides of vehicle for Y-III, LSA exclusive use and highway route controlled quantity [172.504(a), T% 507,173.425(b)]
E. Vehicle Inspection Checklist
~X
- Verify that vehicle was monitored and inspected by the licensee upon arrival.
X Shipment blocked, braced, tied down in vehicle [173.425(b)]
X
' Aner loading, vehicle surveyed for radiation [173.4411and contamination [173.443)
F. Radiation / Contamination Survey [49 CFR 173.441,173.443]
= a. Exclusive Use Vehicles-0,166 ' Not exceed 2 mR/hr in any occupied position in the vehicle 3.24 Not exceed 10 mR/hr at 2 meters (6.6 ft) from the vehicle 11.4' Not exceed 200 mR/hr on outer surface (including upper or lower) of the vehicle 1
- NA Not exceed 1,000 mR/hr on the external surface of the package.(closed transport vehicle) 11 4 Not exceed 200 mR/hr on the external surface of the package (open transport vehicle)
~
- b. -- Non-Exclusive Use Vehicles NA - Not exceed 10 mR/hr at 1 meter (3.3 ft) fror . package z
NA' Not exceed 200 mR/hr on the external surface of the package a3-
y,-.
L.i
.. c. ' Highest Contamination Detected
-- Not exceed 22 dpm/cm2 (beta & gamma) -
-(Wipe sample for 300 cm2) _ _
llighest contamination _ detected - 93 cpm Background reading . . 73 cpm Difference /Above background 20 cpm Divide by instrument effielency (0.15) = 133.3 ;
Divide by (300 cm2) - = 0.44 dpm/cm2 RADIATION / CONTAMINATION SURVEY (transport vehicle)
Surface II'4 mR/hr 3.2 C 2 meters mR/hr Cab / Sleeper Surface (bottom) Surface 7.20 mR/hr 0.166 ~ mR/hr 3.53 mR/hr 2 meters 2.35 mR/hr ~ ;
J Surface - 9 99 mR/hr 2 meters 2.63 mR/hr i b
t s
y 4,
t a
a b
4
..u. . _ _ . , , ,_ - ;_... . . - . . . ~ . _ . . , . .,_u._ . . . _ _ . . . _ _ , , _ .
f 0;; .. ,R:tults of Inspsetion -
4- ' I, Violations /Non Compliance None i
1 11. Comments None Instrument (s) Serial Number (s) Calibration Date ESP - 2 Eberline 309 5/31/91 ESP - 2 Eberline 312 5/31/91
~ Inspector's Name Stan Maingi Rich Janati
-I i
l I
, .-, - - _ - . . . ,-. . . - , _ . , . _ . . - - . . - _ - . . - - ,